New Cingular Wireless Right-of-Way Grant (OR 48563) Renewal

Medford

Documents in Project

Scoping Letter DOI-BLM-OR-002-EA Planning in Progress
The Medford District of the Bureau of Land Management (BLM) is currently evaluating an application from New Cingular Wireless PCS, LLC (AT&T) to renew an existing right-of-way grant (OR 48563) for their communication facility located at the top of Soda Mountain within the Cascade-Siskiyou National Monument (CSNM) and associated rights to use and maintain BLM roads 39-3E-32.3 (Soda Mountain Road) and 40-3E-21.1.
Kathy Minor
541-618-2245
n/a
Resource Area: Ashland
Program Areas: Lands/Realty
Download: NewCingScoping.pdf
Document Publish Date
Comment:
01/20/2013
01/22/2013 - 02/08/2013
New Cingular Wireless PCS, LLC Right-Of-Way Renewal EA DOI-BLM-OR-M040-2013-002-EA Planning in Progress
The BLM is evaluating the suitability of renewing AT&T’s right-of-way (OR 48563) on Soda Mountain identified as a Valid Existing Right in the Cascade-Siskiyou National Monument Resource Management Plan and under the provisions of the Soda Mountain Communications Site Management Plan. The ROW renewal proposes to authorize AT&T to operate and maintain their existing communication facility and access roads 39-3E-32.3 (Soda Mountain Road), 40-3E-21.1, and 40-3E-21.2 (Soda Mountain Lookout Road). The lease would be for a 100’ x 100’ compound containing an operational 80’ cell tower, equipment shelter, a propane tank. Modifications include replacing one microwave dish, installing one new dish, and painting equipment.
Kathy Minor
541-618-2245
n/a
Resource Area: Ashland
Program Areas: Lands/Realty
Download: 20150824_mdo_new_cingular_wireless.pdf
Document Publish Date
Comment:
08/25/2015
08/26/2015 - 09/10/2015
FONSI for the New Cingular Wireless PCS, LLC, ATand T, Right of Way Grant Renewal_OR 48563 DOI-BLM-OR-M040-2013-0002-EA Planning in Progress
This document is a Finding of No Significant Impact (FONSI) for the New Cingular Wireless PCS, LLC (AT&T) Right-of-Way Grant Renewal. The BLM analyzed a proposal to renew New Cingular Wireless PCS, LLC (AT&T)’s existing right-of-way grant (OR 48563) for their communication facility located at the top of Soda Mountain in the Cascade-Siskiyou National Monument (CSNM) for a period of 10 years, and to include modifications to the original grant.
Kathy Minor
541-618-2245
n/a
Resource Area: Ashland
Program Areas: Lands/Realty
Download: 20150929_MDO_FONSI_New_Cingular.pdf
Document Publish Date
Appeal:
09/30/2015
09/30/2015 - 10/29/2015
Decision Record for New Cingular Wireless PCS, LLC, AT and T, Right of Way Grant Renewal DOI-BLM-OR-M040-2013-0002-EA Planning in Progress
This document is BLM's decision regarding the selection of a course of action to be implemented for the New Cingular Wireless PCS, LLC (AT&T) right-of-way grant renewal request. The authorized officer has decided to implement Alternative 2 as described in the New Cingular Wireless PCS, LLC (AT&T) Right-of-Way Grant Renewal EA. This Decision authorizes the renewal the New Cingular Wireless (AT&T) Right-of-Way Grant (OR 48563), as amended by the Soda Mountain Communications Site Management Plan (USDI 2012) for their New Cingular's communication facility located at the top of Soda Mountain in the Cascade-Siskiyou National Monument (CSNM) for a period of 10 years, and includes modifications to the original grant.
Kathy Minor
541-618-2245
n/a
Resource Area: Ashland
Program Areas: Lands/Realty
Download: 20150929_MDO_DR_New_Cingular.pdf
Document Publish Date
Appeal:
09/30/2015
09/30/2015 - 10/29/2015