NEPA Project Summary 
NEPA #:  DOI-BLM-NV-W010-2014-0008-DNA Status:  Completed
Project Name:  Ruby Pipeline Cathodic Protection System (CPS) Installation Decision Date:  03/04/2014
EIS OEPC #:  FONSI Date: 
Applicant:  Colorado Interstate Gas Company, L.L.C.    
Case File Number/:
Project Number 
   
Start Date:     
End Date:     
 
Project Description:
Ruby Pipeline Co. submitted an application to amend their ROW to include the following. The project consists of installation of a CPS within the existing Ruby Pipeline ROW in Humboldt County. The project will involve drilling a 10 in. diameter hole 250 feet deep. Anodes with wires attached would be placed in the hole which would then be backfilled. The wires would be connected to a 4-6 ft high cylinder style test station. The test station would be powered by propane stored in a 300 gallon propane tank. The tank and test station would be set on a concrete pad and fenced with a chain link fence (approximately 20 ft x 10 ft). All facilities and construction would be within the existing 50 ft. easement. An existing access road, measuring 2850 ft long and 10 ft wide would be used for construction and maintenance of the test station. The access road would not require improvement for either construction or maintenance of the facility.
Project Location:
T. 40 N., R. 38 E., sec. 33 , E ½ of the NW ¼ T. 40 N., R. 38 E., sec. 33 , NE ¼ and SE ¼ of NW 1/4
 
Project Lead:  Other    
Phone Number:  (775) 623-1589    
Email Address:  kataman@blm.gov    
Office(s):  Humboldt River FO Lead Office:  Humboldt River FO
Counties:  Humboldt    
 
Program(s):  Fluid Minerals (Oil & Gas, Tar Sands, Oil Shale) Subprogram(s):  Oil & Gas
Cooperating Agencies:     
 


Document Name Publication Date  
DNA Documents 03/05/2014  
     