U.S. DEPARTMENT OF THE INTERIOR  BUREAU OF LAND MANAGEMENT  
ePlanning DOI-BLM-AZ-C030-2013-0021-EA  
> NEPA Register > DOI-BLM-AZ-C030-2013-0021-EA
NEPA Project Summary 
NEPA #:  DOI-BLM-AZ-C030-2013-0021-EA Status:  Completed
Project Name:  Sundance Resort Installation of 100 RV sites and supporting infrastructure at Empire Landing Decision Date:  07/10/2014
EIS OEPC #:  FONSI Date:  07/10/2014
Applicant:  Sundance Resort LLC. (Resort)    
Case File Number/:
Project Number 
CAAZCA-26694    
Start Date:     
End Date:     
 
Project Description:
The Resort requests an expansion of its existing concession by including a portion of the adjacent Empire Landing Campground. The proposal would increase the existing concession by approximately 4 acres. The project would start within 120 days after the Decision Record is signed. The project is scheduled to be completed within one year after start of construction. The Resort will create a Plan of Development (POD) which will show the location of the proposed RV sites, and supporting infrastructure such as water, sewer and electric lines. If BLM approves the proposed request. The POD will be submitted to the State of California for approval and issuance of building permits. After the building permits are secured the Resort will hire a licensed contractor to implement the POD. The State of California will conduct the inspections for compliance with their building permits.
Project Location:
The site is in San Bernardino County, approximately 7 miles northeast of Parker, Arizona. The application requests an addition portion of lot 3 in T. 2 N., R. 26 E, sec. 36 San Bernardino Meridian.
 
Project Lead:  Charles D Adams    
Phone Number:  (928) 505-1258    
Email Address:     
Office(s):  Lake Havasu FO Lead Office:  Lake Havasu FO
Counties:  La Paz    
 
Program(s):  Recreation and Visitor Services Subprogram(s):  None
Cooperating Agencies:     
 

NEPA Document

FONSI

Decision Record


Document Name Publication Date  
Appendix B_Figure 1.pdf 03/19/2014  
Appendix B_Figure 2.pdf 03/19/2014  
Appendix B_Figure 3.pdf 03/19/2014  
Appendix B_Figure 4.pdf 03/19/2014  
Appendix E_Wastewater System Design.pdf 03/19/2014  
Appendix F_Potable Water System Design.pdf 03/19/2014  
Appendix G_Storm Water Pollution Prevention Permit.pdf 03/19/2014  
Appendix A - Lease Stipulations.pdf 07/14/2014  
Appendix C - Photos.pdf 07/14/2014  
Appendix D_Sundance POD.pdf 07/14/2014  
     

USA.Gov | No Fear Act | DOI | Disclaimer | About BLM | Notices | Get Adobe Reader® Privacy Policy | FOIA | Kids Policy | Contact Us | Accessibility | Site Map | Home This page was created by the Bureau of Land Management