U.S. DEPARTMENT OF THE INTERIOR  BUREAU OF LAND MANAGEMENT  
ePlanning DOI-BLM-NV-W010-2013-0015-DNA Help
   Video Tutorial
> NEPA Register > DOI-BLM-NV-W010-2013-0015-DNA
NEPA Project Summary 
NEPA #:  DOI-BLM-NV-W010-2013-0015-DNA Status:  Analysis & Document Preparation
Project Name:  Holloway Fire Emergency Stabilization & Rehabilitation Projects Decision Date:  12/27/2012
EIS OEPC #:  FONSI Date: 
Applicant:  Winnemucca BLM    
Case File Number/:
Project Number 
   
Start Date:     
End Date:     
 
Project Description:
The Holloway Fire burned a cumulative total of 215,541 acres in northern Nevada, of which 16,152 acres of private land were burned, and 199,389 acres of BLM lands were burned. The fire burned in and around the Montana mountains, Trout Creek mountains, Bilk Creek mountains, and within portions of King's River Valley. Affected resources include occupied and unoccupied "recovery" Lahontan Cutthroat Trout streams, bighorn sheep habitat, mule deer habitat, pronghorn habitat, and Greater Sage Grouse habitat. The fire burned through a large number of Ecological Sites, most of which fall into three generalized ecosystems: Wyoming sagebrush ecology, mountain sagebrush ecology, and low sagebrush ecology. Within the Nevada portion of the Holloway Fire, ESR projects are designed to ameliorate potential aeolian-driven soil erosion, monitor and minimize detrimental sediment transport and streambank scouring, monitor and manage noxious weed infestations within the disturbed landscape to minimize or eliminate opportunity for increased infestation, manage road systems for human life and safety issues caused by the burn event, accelerate development of stable perennial plant ecosystems, with emphasis on recovery of native plant-based ecosystems where possible, accelerate recovery of critical habitat values for invertebrate and vertebrate wildlife species, with a strong emphasis on values critical to Greater Sage Grouse. Specific Project actions may or will include aerial and handseeding operations, hand planting operations, repair of system roads, stream stabilization activities, full and/or partial closure to livestock grazing, and monitoring of treatment efficacy and post fire recovery of both treated and untreated areas.
Project Location:
 
Project Lead:  Eric S Baxter    
Phone Number:  (775) 623-1500    
Email Address:     
Office(s):  Humboldt River FO Lead Office:  Humboldt River FO
Counties:  Humboldt    
 
Program(s):  Wildland Fire Management Special Interest(s): 
Cooperating Agencies:     
 

NEPA Document

Decision Record


Map Set Name Publication Date  
Holloway Fire ESR Maps 12/28/2012  
     

USA.Gov | No Fear Act | DOI | Disclaimer | About BLM | Notices | Get Adobe Reader® Privacy Policy | FOIA | Kids Policy | Contact Us | Accessibility | Site Map | Home This page was created by the Bureau of Land Management