U.S. DEPARTMENT OF THE INTERIOR  BUREAU OF LAND MANAGEMENT  
ePlanning DOI-BLM-AK-F020-2012-0011-CX Help
   Video Tutorial
> NEPA Register > DOI-BLM-AK-F020-2012-0011-CX
NEPA Project Summary 
NEPA #:  DOI-BLM-AK-F020-2012-0011-CX Status:  Completed
Project Name:  Taylor Highway Recreation Repairs Decision Date:  07/27/2012
EIS OEPC #:  FONSI Date: 
Applicant:  BLM    
Case File Number/:
Project Number 
   
Start Date:     
End Date:     
 
Project Description:
This project includes replacing one existing toilet building at Fort Egbert; replacing two existing toilet buildings at Chicken Field Station; resurfacing a parking area and reclaiming a borrow pit at the Mount Fairplay wayside; resurfacing a parking area and driveway at Logging Cabin Creek Wayside; resurfacing a parking area, repairing the river access trail, and replacing the display carrier at the West Fork Boat Launch; resurfacing parking areas, replacing toilets and replacing sign carriers at the Mosquito Fork Wayside, South Fork Boat Launch/Wayside, West Fork Campground, and Fortymile Bridge Boat Launch/Wayside; and installing and/or repairing two wells at the Chicken Field Station and Walker Fork Campground.
Project Location:
BLM sites along the Taylor Highway including the waysides at Mt. Fairplay, Logging Cabin Creek, West Fork Boat Launch, Mosquito Fork, South Fork, and Fortymile Bridge, the Chicken Field Station, Fort Egbert, and the West Fork and Walker Fork Campgrounds.
 
Project Lead:  Collin Cogley    
Phone Number:  (907) 474-2200    
Email Address:     
Office(s):  Eastern Interior FO Lead Office:  Eastern Interior FO
Counties:  Fairbanks North Star    
 
Program(s):  Recreation and Visitor Services Special Interest(s):  Outdoor Recreation
Cooperating Agencies:     
 

NEPA Document


USA.Gov | No Fear Act | DOI | Disclaimer | About BLM | Notices | Get Adobe Reader® Privacy Policy | FOIA | Kids Policy | Contact Us | Accessibility | Site Map | Home This page was created by the Bureau of Land Management