U.S. DEPARTMENT OF THE INTERIOR  BUREAU OF LAND MANAGEMENT  
ePlanning DOI-BLM-ID-B010-2010-0020-EA Help
   Video Tutorial
> NEPA Register > DOI-BLM-ID-B010-2010-0020-EA
NEPA Project Summary 
NEPA #:  DOI-BLM-ID-B010-2010-0020-EA Status:  Analysis & Document Preparation
Project Name:  Idaho Power Langley Gulch Pipeline Geotechnical Sampling LUP Decision Date: 
EIS OEPC #:  FONSI Date: 
Applicant:  Idaho Power    
Case File Number/:
Project Number 
IDI-36659    
Start Date:     
End Date:     
 
Project Description:
Idaho Power proposes to dig seven test pits on BLM administered lands to assess subsurface soil conditions to a depth of 10 to 12 feet below existing surface elevations. Excavations would be by backhoe and would be backfilled immediately following logging and sampling.
Project Location:
18 NW of Caldwell, ID, west of I-84 near Exit 9; T. 7 N., R. 4 W., section 29, NWNW, W2SW; section 30, NENE; section 32, SENW, NESE; section 33, SENW.
 
Project Lead:  Effie C. Schultsmeier    
Phone Number:  (208) 384-3357    
Email Address:     
Office(s):  Four Rivers FO Lead Office:  Four Rivers FO
Counties:  Payette    
 
Program(s):  Land and Realty Special Interest(s):  Cultural
Native American Concerns
Outdoor Recreation
Critical Habitat
Riparian-Wetlands
Special Status Species
Visual Resources
Watershed
Cooperating Agencies:     
 