NEPA #:  DOI-BLM-NV-S010-2011-0083-CX Status:  Analysis & Document Preparation
Project Name:  Southwest Gas - Horizon Ridge Upgrade Decision Date: 
EIS OEPC #:  FONSI Date: 
Applicant:     
Case File Number/:
Project Number 
N-53117    
Start Date:     
End Date:     
 
Project Description:
Modify existing transmission pipelines to facilitate In-Line Inspection, or pipeline "pigging" to meet Federal Department of Transportation inspection requirements and to ensure safe operating conditions are maintained. Modification will include the following:Installation of 3 concrete containment pads (7' wide x 41' feet king x 1' thick) within "pigging" site.Installation of 8 foot security block wall ( 65.5' wide x 102' long) surrounding the "pigging" site.Installation of 1 (one) 6' electrical conduit in a joint trench with 2 - 24' steel pipes from Horizon Ridge/Ray to the "pigging" site. All installations and construction activities aforementioned will be located within the existing BLM rights-of-way beginning at the intersection of Horizon Ridge Parkway and Ray Blvd. and terminating approximately 550' south of said intersection.
Project Location:
MDM, Nevada, T. 23S., R. 63E., sec. 6, lots 2 & 3.Horizon Ridge and Ray Blvd.
 
Project Lead:  Cheryl G. Cote    
Phone Number:  702-518-5104    
Email Address:     
Office(s):  Las Vegas FO Lead Office:  Las Vegas FO
Counties:  Clark    
 
Program(s):  Special Interest(s): 
Cooperating Agencies:     
 