U.S. DEPARTMENT OF THE INTERIORBUREAU OF LAND MANAGEMENT
Wyoming News Release
 
Print Page

<< Back to 2006 News Releases

 

March 24, 2006
Contact: Mary L. Wilson
307-328-4329

Rawlins BLM Announces Scoping on Draft EIS for Overland Pass Pipeline Project

Bureau of Land Management’s Rawlins Field Office today issued a Notice of Intent (NOI) to prepare an Environmental Impact Statement (EIS) and is conducting scoping for the Overland Pass Pipeline. The 750-mile long, 20-inch diameter pipeline is proposed to run from Opal, Wyo., to Conway, Kans., and carry natural gas liquids. Williams Field Services Company filed the application for the right-of-way with the BLM’s Rawlins Field Office. Of the 750 miles, approximately 78 miles of the pipeline would not be located near existing pipelines.

The proposed route would generally follow the 1-80 corridor through southern Wyoming, mainly along the Southern Star pipeline route. This proposed Overland Pass Pipeline route would traverse approximately 143.3 miles of federally-administered land in Wyoming and Colorado. In Wyoming, approximately 101.7 miles of the proposed pipeline location would cross public lands administered by three BLM Field Offices: Kemmerer, Rock Springs, and Rawlins. In addition, the proposed pipeline location crosses the following two units of the National Forest System administered by the United States Forest Service, Department of Agriculture. The proposed pipeline location includes approximately 1.2 miles of the Flaming Gorge National Recreation Area in Wyoming, and 39.7 miles of the Pawnee National Grassland north of Greeley, Colorado.

The 45-day scoping period on the EIS concludes on Friday, May 5, 2006. The Notice of Intent and Scoping document may be viewed at http://www.wy.blm.gov/nepa/nepadocs.htm

The public is encouraged to comment on the proposed project in writing and at an open house/public scoping meetings which will be held on:

  • April 17 - Hays, Kans. -- The Mall, (former Coon’s Store) 2918 Vine, Hays, KS 67601; from 5 p.m. to 7 p.m.
  • April 18 - Greeley, Colo. -- Greeley Senior Center, 1010 Sixth Street, Greeley, CO 80631; from 5 p.m. to 7 p.m.
  • April 19 - Cheyenne, Wyo. -- Hitching Post Club Room; 1700 W. Lincolnway, Cheyenne, WY 82001; from 5 p.m. to 7 p.m.
  • April 20 - Rock Springs, Wyo. -- 280 Highway 191 North, Rock Springs, WY 82901; from 5 p.m. to 7 p.m.

Written comments on the draft EIS will be accepted until May 5, 2006, and may be submitted by mail to:

Tom Hurshman, Project Manager
2465 South Townsend
Montrose, CO 81401

Comments may also be submitted electronically to the project email address: Overland_Pipeline_WY@blm.gov

-BLM-


 
Last updated: 03-03-2007