Energy Gateway South Transmission Line Project

Power transmission line at sunset.

Public Outreach

  Postcard - 12/2014

Document Library - 12/2014

  Draft EIS - 02/2014 

FAQs

Publications

  Project Update - 12/2014   

  Latest Newsletter - 03/2014

Maps

  Agency Preferred Alternative
  Route - updated 12/2014

Schedule

  NEPA Planning Approach 

Proponent's Website & Landowner Maps

www.pacificorp.com/tran/tp/eg/gs.html
  >> Shape files 

Project Description

PacifiCorp (doing business as Rocky Mountain Power) a regulated public utility, has filed an application for a right-of-way (ROW) to construct, operate and maintain a 500 kV overhead, alternating current transmission line to cross public and private lands for the Energy Gateway South Transmission Line Project. When completed, the Project would transmit about 1,500 megawatts of electricity generated from renewable and thermal sources at planned facilities in Wyoming.

The project begins in south central Wyoming near Medicine Bow, at the planned Aeolus Substation, and traverses from northeast to southwest across northwestern Colorado to the planned Clover Substation near 
Mona, Utah.

  • 500 kV alternating current overhead transmission line
  • 250 foot right-of-way width
  • Environmental Impact Statement (EIS) being prepared
  • 400+ miles long
  • Typical self-supporting steel lattice tower structures, 
    140-190 feet in height
  • Average tower spans are 1,000 to 1,500 feet apart 
    (4-5 structures per mile)
  • Alternative routes affect 17 counties in Wyoming, Colorado & Utah
  • Scoping meetings were held spring 2011

 