mcpeaks
BLM
U.S. DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
Bull elk on Elk Mountain near Newcastle, Wyoming. Photo by Nate West. Oil rig in Wyoming. Wild horse near Rock Springs, Wyoming. Coal mining operations in the Powder River Basin of northeastern Wyoming. Pronghorn in Wyoming.
Wyoming
BLM>Wyoming>Information>NEPA>Documents>Buffalo>PRB Oil & Gas Project EIS
Print Page
Buffalo Field Office

Powder River Basin Oil & Gas Project

 FY 2007 | 2003 | 2000

FY 2007

PRB Biological Opinion

FY 2003

PRB ROD

PRB Final EIS/Proposed RMP Amendment

Volume 1
Volume 2
  • Cover - 1.52mb, 1pg
  • Chapter 4 - Environmental Consequences - 1.78mb, 405pgs
    • Figure 4–2 - Modeled Drawdown Upper Fort Union Coals Layer 8 Year 2006
    • Figure 4–3 - Modeled Drawdown Upper Fort Union Coals Layer 10 Year 2006
    • Figure 4–4 - Modeled Drawdown Upper Fort Union Coals Layer 12 Year 2006
    • Figure 4–5 - Modeled Drawdown Upper Fort Union Coals Layer 14 Year 2006
    • Figure 4–6 - Modeled Drawdown Upper Fort Union Coals Layer 8 Year 2009
    • Figure 4–7 - Modeled Drawdown Upper Fort Union Coals Layer 10 Year 2009
    • Figure 4–8 - Modeled Drawdown Upper Fort Union Coals Layer 12 Year 2009
    • Figure 4–9 - Modeled Drawdown Upper Fort Union Coals Layer 14 Year 2009
    • Figure 4–10 - Modeled Drawdown Upper Fort Union Coals Layer 8 Year 2012
    • Figure 4–11 - Modeled Drawdown Upper Fort Union Coals Layer 10 Year 2012
    • Figure 4–12 - Modeled Drawdown Upper Fort Union Coals Layer 12 Year 2012
    • Figure 4–13 - Modeled Drawdown Upper Fort Union Coals Layer 14 Year 2012
    • Figure 4–14 - Modeled Drawdown Upper Fort Union Coals Layer 8 Year 2018
    • Figure 4–15 - Modeled Drawdown Upper Fort Union Coals Layer 10 Year 2018
    • Figure 4–16 - Modeled Drawdown Upper Fort Union Coals Layer 12 Year 2018
    • Figure 4–17 - Modeled Drawdown Upper Fort Union Coals Layer 14 Year 2018
    • Figure 4–18 - Location of Calibration Wells
    • Figure 4–22 - Modeled Drawdown Upper Fort Union Coals Layer 8 Year 2030
    • Figure 4–23 - Modeled Drawdown Upper Fort Union Coals Layer 10 Year 2030
    • Figure 4–24 - Modeled Drawdown Upper Fort Union Coals Layer 12 Year 2030
    • Figure 4–25 - Modeled Drawdown Upper Fort Union Coals Layer 14 Year 2030
    • Figure 4–26 - Modeled Drawdown Upper Fort Union Coals Layer 8 Year 2060
    • Figure 4–27 - Modeled Drawdown Upper Fort Union Coals Layer 10 Year 2060
    • Figure 4–28 - Modeled Drawdown Upper Fort Union Coals Layer 12 Year 2060
    • Figure 4–29 - Modeled Drawdown Upper Fort Union Coals Layer 14 Year 2060
    • Figure 4–43 - Soils and Existing and Proposed CBM Wells
    • Figure 4–44 - Distribution of Intensive Surveys and the Relative Density of Cultural
      Sites Recorded
  • Chapter 5 - Land Use Planning and Management - 105kb
  • Chapter 6 - Consultation with Others - 74kb
  • Chapter 7 - Preparers and Contributors - 124kb
  • Chapter 8 - Distribution of Draft EIS - 103kb
  • Chapter 9 - Glossary - 190kb
  • Chapter 10 - References Cited - 268kb
  • Index - 170kb
Volume 3
Volume 4

Surface Water Quality Technical Report

Ground Water Quality Technical Report

FY 2000

PRB Draft EIS/Draft RMP Amendment

Please note that some figures are not included in the document to reduce file size and download
time. To view, click on the figure title.