|
|
Print Page
|
|
Buffalo Field Office
|
Bison Pipeline
Record of Decision- Attachment A: Right-of-Way Grant & List of all Federal Lands - 92kb
- Attachment B: Permanent Right-of-Way Legal Description - 24kb
- Attachment C: TUP Legal Descriptions, Pipeline - 22kb
- Attachment D: TUP Legal Descriptions, Access Roads -22kb
- Attachment E: TUP Legal Descriptions, Additional Temporary Work Space - 24kb
- Attachment F: Plan of Development - 979kb
- Appendix A: Maps & Plans - 10.31mb
- Appendix B: Typical Drawings - 5.50mb
- Appendix C: Snow Removal Plan - 31kb
- Appendix D: Bison Upland Erosion Control, Revegetation & Maintenance Plan (Bison's Plan) - 100kb
- Appendix E: Bison Wetland & Waterbody Construction & Mitigation Procedure (Bison's Procedures) - 118kb
- Appendix F: Wetlands & Waterbodies on BLM Land - 55kb
- Appendix G: Project Permits & Clearances - 76kb
- Appendix H: Project Construction Schedule - 127kb
- Appendix I: Hydrostatic Test Plan - 165kb
- Appendix J: Blasting Plan - 138kb
- Appendix K: Spill Prevention, Control & Countermeasure Plan - 1.51mb
- Appendix L: Noxious & Invasive Weed Control Plan - 219kb
- Appendix M: Wildfire Management Plan - 129kb
- Appendix N: Unanticipated Discovery Plan for Cultural Resources - 201kb
- Appendix O: Revised Paleontological Resources Construction Mitigation Plan - 8.39mb
- Appendix P: Fugitive Dust Plan - 279kb
- Appendix Q: Plan for Unanticipated Discovery of Hazardous Materials - 105kb
- Appendix R: Traffic & Transportation Management Plan - 163kb
- Appendix S: Reclamation Plan - 5.45mb
- Appendix T: Aquatic Nuisance Species Management Plan - 35kb
- Appendix U: Wetland Restoration Plan - 88kb
- Appendix V: Site Specific Plans for Areas with High Susceptibility to Landslides - 16.03mb
- Attachment G: FERC Order Issuing Certificate - 394kb
- Attachment H: FERC Endangered Species Act Concurrence April 14, 2010 - 204kb
- Attachment I: USFWS Concurrence Letter Dated May 11, 2010 - 136kb
 |
|
|