mcpeaks
BLM
U.S. DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
Bull elk on Elk Mountain near Newcastle, Wyoming. Photo by Nate West. Oil rig in Wyoming. Wild horse near Rock Springs, Wyoming. Coal mining operations in the Powder River Basin of northeastern Wyoming. Pronghorn in Wyoming.
Wyoming
BLM>Wyoming>Information>NEPA>Documents>Buffalo>Bison Pipeline
Print Page
Buffalo Field Office

Bison Pipeline 

News Release - 07/21/10

FY 2010

Record of Decision

  • Attachment A: Right-of-Way Grant & List of all Federal Lands - 92kb
  • Attachment B: Permanent Right-of-Way Legal Description - 24kb
  • Attachment C: TUP Legal Descriptions, Pipeline - 22kb
  • Attachment D: TUP Legal Descriptions, Access Roads -22kb
  • Attachment E: TUP Legal Descriptions, Additional Temporary Work Space - 24kb
  • Attachment F: Plan of Development - 979kb
    • Appendix A: Maps & Plans - 10.31mb
    • Appendix B: Typical Drawings - 5.50mb
    • Appendix C: Snow Removal Plan - 31kb
    • Appendix D: Bison Upland Erosion Control, Revegetation & Maintenance Plan (Bison's Plan) - 100kb
    • Appendix E: Bison Wetland & Waterbody Construction & Mitigation Procedure (Bison's Procedures) - 118kb
    • Appendix F: Wetlands & Waterbodies on BLM Land - 55kb
    • Appendix G: Project Permits & Clearances - 76kb
    • Appendix H: Project Construction Schedule - 127kb
    • Appendix I: Hydrostatic Test Plan - 165kb
    • Appendix J: Blasting Plan - 138kb
    • Appendix K: Spill Prevention, Control & Countermeasure Plan  - 1.51mb
    • Appendix L: Noxious & Invasive Weed Control Plan - 219kb
    • Appendix M: Wildfire Management Plan - 129kb
    • Appendix N: Unanticipated Discovery Plan for Cultural Resources - 201kb
    • Appendix O: Revised Paleontological Resources Construction Mitigation Plan - 8.39mb
    • Appendix P: Fugitive Dust Plan - 279kb
    • Appendix Q: Plan for Unanticipated Discovery of Hazardous Materials - 105kb
    • Appendix R: Traffic & Transportation Management Plan - 163kb
    • Appendix S: Reclamation Plan - 5.45mb
    • Appendix T: Aquatic Nuisance Species Management Plan - 35kb
    • Appendix U: Wetland Restoration Plan - 88kb
    • Appendix V: Site Specific Plans for Areas with High Susceptibility to Landslides - 16.03mb
  • Attachment G: FERC Order Issuing Certificate - 394kb
  • Attachment H: FERC Endangered Species Act Concurrence April 14, 2010 - 204kb
  • Attachment I: USFWS Concurrence Letter Dated May 11, 2010 - 136kb