Vermillion Cliffs--Grand Staircase-Escalante National Monument
BLM
U.S. DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
Calf Creek Falls Cedar Mesa Ruin Mule Deer in the Book Cliffs Mountains Simpson Springs Pony Express Station Cedar Mesa
Monticello Field Office
BLM>Utah>Monticello>Planning>Draft RMP/EIS
Print Page
Monticello Draft RMP and EIS

The BLM Monticello Field Office encompasses 1.8 million acres is Southeastern Utah including the southern two-thirds of San Juan County with a small portion on the northern boundary within Grand County. 

The DRMP/DEIS presents five alternatives which take into consideration scoping comments received by other governmental agencies, public organizations, state, tribal entities and interested individuals. Public collaboration through the scoping process led to shaping of issues covering travel management, recreation, special designations, non-WSA lands with wilderness characteristics, minerals and other topics. The DRMP/DEIS analyzes alternatives to resolve management issues and determines management objectives and actions for BLM lands in the planning area.


Arch CanyonThis website contains the complete DRMP/DEIS as well as the Background Documents used in its preparation. These background documents include the Scoping Summary, the Mineral Potential Report, the Reasonable Foreseeable Development scenario for oil and gas, a socioeconomic study for each county, the Wild and Scenic Rivers Eligibility Report, the ACEC Relevance and Importance Report, and the Determinations of Wilderness Characteristics review. CDs containing the document are also available. You may request a CD by contacting the Monticello Field Office at P.O. Box 7, Monticello, Utah 84535 or by calling 435-587-1500. To comment on the DRMP/DEIS, please click the link below to Get Involved. You may comment electronically or by mail. Thank you for your interest in the Monticello RMP process. 


Cover Page  (2547 KB)
Table of Contents  (171 KB)
Title Page  (19 KB)
Dear Reader Letter (100 KB)Hart Point
Abstract  (21 KB)
Executive Summary  (55 KB)
Chapter 1  Introduction  (80 KB)
Chapter 2  Alternatives  (800 KB)
Chapter 3  Affected Environment  (996 KB)
Chapter 4  Environmental Consequences of  Alternatives
  (2.6 MB)
Chapter 5  Consultation and Coordination  (68 KB)

Draft RMP/EIS Maps

CLICK HERE TO ACCESS RMP MAPS

Draft RMP/EIS Appendics

Appenidx A   Stipulations & Environmental BMP Applicable to Oil and Gas Leasing and Other Surface Disturbing  Activities  (113 KB)
Appendix B   Fire Management  (59 KB)
Appendix C   Lands and Realty   (19 KB)
Appendix D   Livestock Grazing  (78 KB)
Appendix E   Recreation   (61 KB)
Appendix F   Guidance for Pipeline Crossings   (30 KB)
Appendix G   Noxious Weed Control Act  (26 KB)
Appendix H   Special Designations   (404 KB)
Appendix I    Standard Operating Proceedures  (20 KB) 
Appendix J    Energy and Non-Energy Policy Statement  (54 KB)
Appendix K   Community Pit Information  (18 KB)
Appendix L    Development & Testing, Cultural Resource Site Density Predictive Model  (41 KB)
Appendix M   Best Management Practices for Raptors  (64 KB)
Appendix N   Travel Plan  (164 KB)
Appendix O   Identification of Wilderness Characteristics on Non-WSA Lands  (74 KB)
Appendix P   Film Permits Minimum Impact Criteria  (15 KB)
Appendix Q   Conservation Measures and Best Management Practices for T & E Species of Utah
References (130 kb)
Acronyms and Glossary (67 kb)
Index (25 kb)

 

 

  All of these documents require Adobe Acrobat Reader to view. Download a free copy of Adobe Acrobat Reader.