mcpeaks
BLM
U.S. DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
Bull elk on Elk Mountain near Newcastle, Wyoming. Photo by Nate West. Oil rig in Wyoming. Wild horse near Rock Springs, Wyoming. Coal mining operations in the Powder River Basin of northeastern Wyoming. Pronghorn in Wyoming.
Wyoming
BLM>Wyoming>Information>NEPA>Documents>Rawlins>Chokecherry & Sierra Madre Wind Energy Project
Print Page
Rawlins Field Office

Chokecherry & Sierra Madre Wind Energy Project  

FY 2014

BLM_WY_PCW_windfarm@blm.gov

Proponent's Website

Site-specific Environmental Assessments

Site-specific Public Meeting Materials

FY 2013

Site-specific Scoping Meetings

News Release - 09/09/2013

Record of Decision

  • News Release - 10/09/2012 

  • Notice of Availability - 195kb - 10/16/12

  • Record of Decision - 9.22mb 
    • Appendix A - Final EIS Errata - 70kb 
    • Appendix B - Power Company of Wyoming Project-wide Plan of Development - 13.5mb 
    • Appendix C - Project Permitting and BLM Tiering Review Procedures - 487kb 
    • Appendix D - Summary of BLM Environmental Constraints, Applicant Committed Measures, Applicant Committed 
      Best Management Practices, and Proposed Mitigation Measures - 352kb
       
    • Appendix E - Cultural Resources Programmatic Agreement - 1.9mb 
    • Appendix F - Biological Assessment (to be replaced with Biological Opinion) - 474kb 
    • Appendix G - Wildlife Monitoring and Protection Plan - 104kb 
    Fact Sheet

FY 2012

Final Environmental Impact Statement

Notice of Availability - 07/03/12 - 58kb

Dear Reader Letter - 122kb   

Volume 1 - Proposed Visual Resource Management (VRM) Plan Amendment Final Environmental Impact Statement (FEIS)

Volume 2 - Chokecherry and Sierra Madre Wind Energy Project FEIS

FY 2011

Meeting Handouts & Boards

Draft Environmental Impact Statement

Notice of Availability - 07/22/11 - 2mb 

Document Cover  - 1.35mb   
Dear Reader Letter - 82kb   

Volume 1 - Draft Visual Resource Management (VRM) Plan Amendment Draft Environmental Impact Statement (DEIS)

Volume 2 - Chokecherry and Sierra Madre Wind Energy Project DEIS

  • Volume 2 Cover - 1.35mb   
  • Executive Summary - 96kb   
  • Acronyms - 23kb   
  • Table of Contents - 185kb 
  • Chapter 1 - Purpose and Need - 1.63mb   
  • Chapter 2 - Project Description and Alternatives - 2.68mb   
  • Chapter 3 - Affected Environment - 27.8mb   
  • Chapter 4 - Environmental Consequences - 14.9mb   
  • Chapter 5 - Introduction (Cumulative Impacts) - 3.2mb   
  • Chapter 6 - Consultation and Coordination - 61kb   
  • Chapter 7References - 154kb   
  • Chapter 8 - Glossary - 37kb   
  • Chapter 9 - Index - 16kb   
  • Appendices
    • Appendix A – Elements Common to All Action Alternatives - 1.65mb   
    • Appendix B – This Appendix Intentionally Left Blank - 7kb   
    • Appendix C – Summary of BLM Environmental Constraints, Applicant Committed Measures, Applicant 
      Committed Best Management Practices, and Proposed Mitigation Measures 
      - 267kb   
    • Appendix D – Reclamation Plan - 418kb   
    • Appendix E – BLM Cultural Resources Protection Procedures - 64kb   
    • Appendix F – Soils Environmental Consequences Figures, Soils Site Photos, and Mapbooks - 16.17mb   
    • Appendix G – Wildlife Species Considered in the Application Area - 108kb   
    • Appendix H – Air Calculations - 714kb   
    • Appendix I – Visual Simulations - 110mb   
    • Appendix J – Wildlife Monitoring - 913kb   
    • Appendix K – Species Listed Under the ESA or on the BLM Sensitive Species List Occurring within the RFO 
      District 
      - 66kb   
    • Appendix L – Biological Assessment/Biological Opinion - 10kb   

FY 2009

Scoping Documents

FY 2008