Vitals
Proposed Location: Imperial Valley west of the town of El Centro, adjacent to the Imperial Valley Substation
Electricity Production Capacity: 14 megawatts
Company: San Diego Gas & Electric
Acreage: 115 acres
Status: Notice of Intent published in the Federal Register on 7/15/2011
Public Comment: Scoping meeting will be announced
Electrictrical Transmission Connection: The project would connect with the Imperial Valley Substation