<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
<channel>
<title>OR/WA BLM Burns Planning Documents</title>
<pubDate>Fri, 20 Nov 2009 13:23:03 PST</pubDate>
<link>http://www.blm.gov/or/plans/</link>
<description>The most recent Burns NEPA planning documents. Categories include district office and document type.</description>
<managingEditor>OR_Burns_Mail@blm.gov (Burns District)</managingEditor>
<webMaster>or_web_services@blm.gov (Oregon Washington BLM Web Team)</webMaster>
<atom:link href="http://www.blm.gov/or/rss/nepa-burns.xml" rel="self" type="application/rss+xml" />
<language>en-us</language><item>
<title>Cave Gulch Emergency Stabilization and Road Closure - Categorical Exclusion</title>
<link>http://www.blm.gov/or/districts/burns/plans/files/CaveGulchdecision.pdf</link>
<guid>http://www.blm.gov/or/districts/burns/plans/files/CaveGulchdecision.pdf</guid><description><![CDATA[During the summer of 2009, unauthorized levels of surface disturbance occurred along some roads and two track roads in the area of Cave Gulch.  As a result the Bureau of Land Management (BLM) must take actions immediately to reduce erosion from the affected areas and to prevent or reduce the levels of noxious and invasive weed establishment in the bare ground areas that were created.  The BLM must also take actions to facilitate the success of these stabilization practices.

The decision is to implement the Proposed Action in CX number DOI-BLM-OR-B050-2010-0004-CX (enclosed).  The holes in the disturbed two tracks will be filled, the soil compacted and water barred where necessary, and the disturbed areas seeded with a mixture of native plants plus crested wheatgrass.  The stabilized two tracks and the immediate area will then be closed to motorized vehicle use beginning at the end of the area's big game hunting seasons, December 1, 2009.  The area will remain closed to motorized vehicle use until the treated areas have met the criteria identified in the CX.  ]]></description><category>Burns</category><category>Categorical Exclusion</category><pubDate>Fri, 13 Nov 2009 14:20:00 PST</pubDate>
</item><item>
<title>South Steens Gather Plan for the South Steens Herd Management Area - Environmental Assessment/FONSI</title>
<link>http://www.blm.gov/or/districts/burns/plans/files/SSteensGatherEAandFONSIFinal.pdf</link>
<guid>http://www.blm.gov/or/districts/burns/plans/files/SSteensGatherEAandFONSIFinal.pdf</guid><description><![CDATA[The EA analyzes effects of achieving and sustaining the Appropriate Management Level (AML) for wild horses including gathering of excess horses within the boundaries of South Steens Herd Management Area (HMA) and any wild horses outside or adjacent to the HMA.  The current population of wild horses within the gather area is estimated to be 584 animals.  The AML for the herd is 159 to 304 wild horses.  The AML for South Steens HMA has been previously established based on monitoring data and following thorough public review.  The Proposed Action is to capture wild horses (90 percent of the population) in the HMA and all excess horses outside South Steens HMA.]]></description><category>Burns</category><category>Environmental Assessment/FONSI</category><pubDate>Tue, 10 Nov 2009 16:16:43 PST</pubDate>
</item><item>
<title>South Steens Gather Plan for the South Steens Herd Management Area - Decision Record</title>
<link>http://www.blm.gov/or/districts/burns/plans/files/SSteensGatherFINALDecision11102009.pdf</link>
<guid>http://www.blm.gov/or/districts/burns/plans/files/SSteensGatherFINALDecision11102009.pdf</guid><description><![CDATA[Implement the Proposed Action which allows the capture of 90 percent of wild horses in the HMA as well as immunocontraceptive use on 30 to 40 mares.  Eighty mares and 79 studs will remain either ungathered or be returned to the HMA at completion of the gather, leaving a post-gather population of 159 horses. Gather operations will begin on or about November 11, 2009, and last until management objectives are attained. ]]></description><category>Burns</category><category>Decision Record</category><pubDate>Tue, 10 Nov 2009 15:47:13 PST</pubDate>
</item><item>
<title>North Steens Transmission Line - Scoping Letter</title>
<link>http://www.blm.gov/or/districts/burns/plans/files/ScopingBulletinFINAL.pdf</link>
<guid>http://www.blm.gov/or/districts/burns/plans/files/ScopingBulletinFINAL.pdf</guid><description><![CDATA[Four public scoping meetings to discuss the proposed construction of a transmission line in the north Steens Mountain area are set for the end of July in Diamond, Frenchglen, Burns, and Bend, Oregon.  The proposed 29-mile long transmission line would cross Bureau of Land Management (BLM), U.S. Fish and Wildlife Service, Malheur National Wildlife Refuge and private lands.  

Echanis, LLC recently applied for a right-of-way with the BLM to construct the 230 kilovolt (kV) line that would ultimately be used to convey power generated from wind farms proposed for development by parent-company Columbia Energy Partners, LLC on the north side of Steens Mountain.  

Those interested in the transmission line development are encouraged to participate in the public scoping process.  A formal comment form is attached to this scoping notice.  The closing date for the scoping period is August 26, 2009. ]]></description><category>Burns</category><category>Scoping Letter</category><pubDate>Thu, 23 Jul 2009 09:24:44 PST</pubDate>
</item><item>
<title>South Harney County School District #33 R&amp;PP Classification and Land Sale - Environmental Assessment/FONSI</title>
<link>http://www.blm.gov/or/districts/burns/plans/files/or65757_ALL.pdf</link>
<guid>http://www.blm.gov/or/districts/burns/plans/files/or65757_ALL.pdf</guid><description><![CDATA[The EA analyzes whether or not to classify and sell 2.5 acres of Federal land under R&amp;PP to the Fields School which will provide compliance with the Oregon State Fire Marshall requirement to move hazardous substances away from the main school building and develop a parking lot.]]></description><category>Burns</category><category>Environmental Assessment/FONSI</category><pubDate>Wed, 17 Jun 2009 10:27:18 PST</pubDate>
</item><item>
<title>West Wagontire Allotment Tired Horse Butte Fence - Decision Record</title>
<link>http://www.blm.gov/or/districts/burns/plans/files/THF_FinalDecision_ProtestResponses.pdf</link>
<guid>http://www.blm.gov/or/districts/burns/plans/files/THF_FinalDecision_ProtestResponses.pdf</guid><description><![CDATA[Having considered the Proposed Action, No Action Alternative, and associated impacts and based on analysis in EA OR-08-025-030 and with consideration of public comments, it is my Final Decision to implement the Proposed Action (Alternative B) which includes fence construction and changes to livestock grazing management.]]></description><category>Burns</category><category>Decision Record</category><pubDate>Fri, 20 Feb 2009 13:04:14 PST</pubDate>
</item><item>
<title>West Wagontire Allotment Tired Horse Butte Fence - Environmental Assessment/FONSI</title>
<link>http://www.blm.gov/or/districts/burns/plans/files/THF_EA_FONSI_Final.pdf</link>
<guid>http://www.blm.gov/or/districts/burns/plans/files/THF_EA_FONSI_Final.pdf</guid><description><![CDATA[The Three Rivers Resource Area, Burns District, has prepared an Environmental Assessment (EA) to analyze the Proposed Action to modify current grazing practices within Tired Horse Pasture by adjusting the timing and distribution of livestock grazing to ensure continuance of achieving Standards for Rangeland Health.  Based on utilization records, a need exists to improve livestock distribution and utilization patterns.  Currently, the eastern half of Tired Horse Butte Pasture gets more use than the western side.  This is due to larger areas of lower elevation, more gradual slopes, and more area with south and west facing aspects allowing for more sunlight. ]]></description><category>Burns</category><category>Environmental Assessment/FONSI</category><pubDate>Fri, 20 Feb 2009 12:57:19 PST</pubDate>
</item><item>
<title>Pueblo Mountain Wind Energy Site Testing and Monitoring Project Area - Decision Record</title>
<link>http://www.blm.gov/or/districts/burns/plans/files/HorizonWindDR_Jan1509_forweb.pdf</link>
<guid>http://www.blm.gov/or/districts/burns/plans/files/HorizonWindDR_Jan1509_forweb.pdf</guid><description><![CDATA[Implement the Proposed Action allowing the ROW applicant to renew the existing ROW grant, OR-63580, for a wind energy site testing and monitoring project area for a term of 3 years as requested by Horizon in its application and Plan of Development (POD).  In addition, the BLM will authorize the ROW grant providing the ability to install, operate, and maintain two new met poles; exclusive use for wind energy testing and monitoring on an additional 467.75 acres in the project area; and the ability to perform geotechnical studies as requested by the Applicant with additional terms and conditions from the BLM concerning the installation of met towers and geotechnical studies.
**Additional information on taking appeals to the IBLA can be obtained by contacting Holly Orr [BLM] at 541-573-4501.]]></description><category>Burns</category><category>Decision Record</category><pubDate>Thu, 15 Jan 2009 11:54:15 PST</pubDate>
</item><item>
<title>Pueblo Mountain Wind Energy Site Testing and Monitoring Project Area - Environmental Assessment/FONSI</title>
<link>http://www.blm.gov/or/districts/burns/plans/files/HorizonWindEA_Final.pdf</link>
<guid>http://www.blm.gov/or/districts/burns/plans/files/HorizonWindEA_Final.pdf</guid><description><![CDATA[The purpose of this action is to analyze whether or not and under what terms and conditions to amend and renew ROW grant OR-63580 to continue the authorized use of BLM-administered land for a wind energy site testing and monitoring project within the Pueblo Mountains.]]></description><category>Burns</category><category>Environmental Assessment/FONSI</category><pubDate>Thu, 15 Jan 2009 11:17:23 PST</pubDate>
</item><item>
<title>South Steens Water Development - Environmental Assessment/FONSI</title>
<link>http://www.blm.gov/or/districts/burns/plans/files/SSSignedFonsiEAMaps.pdf</link>
<guid>http://www.blm.gov/or/districts/burns/plans/files/SSSignedFonsiEAMaps.pdf</guid><description><![CDATA[The EA analyzes modification of the South Steens Allotment Management Plan and effects to wild horses, grazing, and Wilderness Study Area (WSA) management in South Steens Allotment (#6002) from implementing Section 113 (e) (2), Section 202 (d) (2) and Title VI of the Steens Mountain Cooperative Management and Protection Act (Steens Act) of 2000.  The purpose is to analyze the need for replacement of live, reliable, late-season water for livestock and wild horses within South Steens Allotment while preventing impairment of wilderness suitability.]]></description><category>Burns</category><category>Environmental Assessment/FONSI</category><pubDate>Wed, 07 Jan 2009 08:00:00 PST</pubDate>
</item><item>
<title>South Steens Water Development - Decision Record</title>
<link>http://www.blm.gov/or/districts/burns/plans/files/SSSignedProposedDec.pdf</link>
<guid>http://www.blm.gov/or/districts/burns/plans/files/SSSignedProposedDec.pdf</guid><description><![CDATA[Implement actions most closely aligned with the Proposed Action described in the EA which constructs, rehabilitates and decommissions water developments; authorizes issuance of a 10-year grazing permit; and modifies the 1995 AMP to make significant progress toward achieving Standards for Uplands-Riparian/Wetland Areas and Water Quality within Steens Pasture.  ]]></description><category>Burns</category><category>Decision Record</category><pubDate>Wed, 07 Jan 2009 08:00:00 PST</pubDate>
</item><item>
<title>Slickear/Claw Creek Forest Restoration - Decision Record</title>
<link>http://www.blm.gov/or/districts/burns/plans/files/Slickear_Decision_Record.pdf</link>
<guid>http://www.blm.gov/or/districts/burns/plans/files/Slickear_Decision_Record.pdf</guid><description><![CDATA[Implement the Proposed Action which will use various methods of prescribed fire and mechanical treatments to accomplish specific objectives described in the EA&amp;#039;s purpose and need section.]]></description><category>Burns</category><category>Decision Record</category><pubDate>Fri, 24 Oct 2008 08:00:00 PST</pubDate>
</item><item>
<title>West Warm Springs Allotment Management Plan - Environmental Assessment/FONSI</title>
<link>http://www.blm.gov/or/districts/burns/plans/files/WWSpringsAMPAll.pdf</link>
<guid>http://www.blm.gov/or/districts/burns/plans/files/WWSpringsAMPAll.pdf</guid><description><![CDATA[Due to the lack of reliable water in much of the West Warm Springs allotment, livestock, wild horses and burros are limited in most years to areas containing reliable water. The need for the proposed 2008 Allotment Management Plan is to ensure livestock grazing on public land moves toward achieving all Standards and Guidelines and meets the resource objectives identified for West Warm Springs Allotment and RMP objectives. The AMP/EA analyzes the recommended management actions developed through the evaluation process and subsequent Interdisciplinary Team work and through coordination with the livestock permittees to aid in accomplishing resource objectives and meeting Standards and Guidelines and land use plan objectives for West Warm Springs Allotment.*Maps pertaining to this EA are available in hard copy at the Burns District office, or by mail.  Please call (541) 573-4400.]]></description><category>Burns</category><category>Environmental Assessment/FONSI</category><pubDate>Wed, 15 Oct 2008 08:00:00 PST</pubDate>
</item><item>
<title>Grassy Hill Pipeline Extension - Environmental Assessment/FONSI</title>
<link>http://www.blm.gov/or/districts/burns/plans/files/GrassyHillExtEA.pdf</link>
<guid>http://www.blm.gov/or/districts/burns/plans/files/GrassyHillExtEA.pdf</guid><description><![CDATA[The AMP/EA analyzes creation of a new pipeline spur that originates at Al's Canyon Trough along Grassy Hill Pipeline in Grassy Basin Allotment # 6017 in extreme southern Harney County, and ends at a new trough that would be placed approximately 1.5 miles due north. The objective of this project is to facilitate utilization of forage by livestock more evenly throughout the interior of the pasture by changing access to water.]]></description><category>Burns</category><category>Environmental Assessment/FONSI</category><pubDate>Wed, 08 Oct 2008 08:00:00 PST</pubDate>
</item><item>
<title>Slickear/Claw Creek Forest Restoration - Environmental Assessment/FONSI</title>
<link>http://www.blm.gov/or/districts/burns/plans/files/SlickearALL.pdf</link>
<guid>http://www.blm.gov/or/districts/burns/plans/files/SlickearALL.pdf</guid><description><![CDATA[The proposed action is to utilize various methods of prescribed fire and mechanical treatments to reduce hazardous fuels, restore plant communities, and improve wildlife habitat diversity.  The emphasis on treatments in forested areas would be to reduce densities of small diameter trees and duff and litter accumulations.  The emphasis in shrublands, woodlands, and riparian areas would be to move conditions toward historic  species composition and structure while reducing fuels in the vicinity of the towns of Burns, Hines, and Riley, as well as numerous ranches, homes, and dwellings.  ]]></description><category>Burns</category><category>Environmental Assessment/FONSI</category><pubDate>Wed, 13 Aug 2008 08:00:00 PST</pubDate>
</item><item>
<title>Cooperative Management &amp; Protection Area Inholder Road Right-of-Way Access - Environmental Assessment/FONSI</title>
<link>http://www.blm.gov/or/districts/burns/plans/files/CMPA ROW Access_0708_all.pdf</link>
<guid>http://www.blm.gov/or/districts/burns/plans/files/CMPA ROW Access_0708_all.pdf</guid><description><![CDATA[The Bureau of Land Management (BLM) is analyzing whether or not and under what terms and conditions to issue a ROW to a private landowner for access to private inholdings within the CMPA including Lower Stonehouse WSA.  The applicant is requesting an ROW in order to secure legal access through public lands to access private lands.  The applicant has also requested the ability to maintain or improve roads to ensure year-round access.]]></description><category>Burns</category><category>Environmental Assessment/FONSI</category><pubDate>Wed, 16 Jul 2008 08:00:00 PST</pubDate>
</item><item>
<title>FIsh Creek Inholder Access-Livestock Crossing - FONSI/Decision Record</title>
<link>http://www.blm.gov/or/districts/burns/plans/files/Fish Creek FONSIDR.071508.pdf</link>
<guid>http://www.blm.gov/or/districts/burns/plans/files/Fish Creek FONSIDR.071508.pdf</guid><description><![CDATA[Implement the Proposed Action]]></description><category>Burns</category><category>FONSI/Decision Record</category><pubDate>Tue, 15 Jul 2008 08:00:00 PST</pubDate>
</item><item>
<title>FIsh Creek Inholder Access-Livestock Crossing - Environmental Assessment</title>
<link>http://www.blm.gov/or/districts/burns/plans/files/Fish Creek IA Livestock.pdf</link>
<guid>http://www.blm.gov/or/districts/burns/plans/files/Fish Creek IA Livestock.pdf</guid><description><![CDATA[The EA addresses a landowner request for access to conduct livestock grazing on private land inholdings within Steens Mountain Wilderness. Harney County designated these private lands for agricultural use.  Specific tax advantages exist for private landowners if these lands are used for agricultural purposes (typically livestock grazing in this area of Harney County).  Should private landowners desire to make use of their private lands for livestock grazing purposes, BLM must implement the Steens Act provisions concerning reasonable access. The BLM will decide how to provide reasonable access, and under what terms and conditions.]]></description><category>Burns</category><category>Environmental Assessment</category><pubDate>Tue, 17 Jun 2008 08:00:00 PST</pubDate>
</item><item>
<title>Inholder Access No Livestock Grazing Wilderness Area - Scoping Letter</title>
<link>http://www.blm.gov/or/districts/burns/plans/files/crossingea0408.pdf</link>
<guid>http://www.blm.gov/or/districts/burns/plans/files/crossingea0408.pdf</guid><description><![CDATA[Burns District BLM is requesting the public to identify issues associated with providing reasonable access to private land inholdings within the Steens Mountain Wilderness Area, for purposes of trailing livestock into private lands. Scoping period open April 8 through May 5, 2008.]]></description><category>Burns</category><category>Scoping Letter</category><pubDate>Tue, 08 Apr 2008 08:00:00 PST</pubDate>
</item><item>
<title>Upper No Name Spring Reservoir Reconstruction - FONSI/Decision Record</title>
<link>http://www.blm.gov/or/districts/burns/plans/files/UpNoNameDRFONSI.pdf</link>
<guid>http://www.blm.gov/or/districts/burns/plans/files/UpNoNameDRFONSI.pdf</guid><description><![CDATA[Implement the proposed action which should allow the rangeland health standards and Trout Creek Mountain Allotment objectives to be met. The proposed action is to place a headbox in the spring that fills UNNSR (approximately 
0.2-acre) so water can be piped to a new 1,200-gallon trough.  The trough will be installed  500 feet northwest of the reservoir.  Overflow water from the trough will be by an underground pipe back to the original riparian meadow system.  The earthen fill of the reservoir will be left in place, so a pond with shoreline vegetation can develop.  Approximately 3,900 feet of fence will be constructed around the reservoir and riparian meadow areas above and below UNNSR, excluding livestock from approximately 9 acres.]]></description><category>Burns</category><category>FONSI/Decision Record</category><pubDate>Wed, 19 Dec 2007 08:00:00 PST</pubDate>
</item><item>
<title>Willow Creek Road Re-route - FONSI/Decision Record</title>
<link>http://www.blm.gov/or/districts/burns/plans/files/willow_creek_FONSI.pdf</link>
<guid>http://www.blm.gov/or/districts/burns/plans/files/willow_creek_FONSI.pdf</guid><description><![CDATA[This decision record improves access to a private land parcel while enhancing wilderness resources.]]></description><category>Burns</category><category>FONSI/Decision Record</category><pubDate>Fri, 07 Dec 2007 08:00:00 PST</pubDate>
</item><item>
<title>Steens Mountain Comprehensive Recreation Plan - Scoping Letter</title>
<link>http://www.blm.gov/or/districts/burns/plans/files/CRPscoping.pdf</link>
<guid>http://www.blm.gov/or/districts/burns/plans/files/CRPscoping.pdf</guid><description><![CDATA[Burns District BLM is embarking on a plan to assess, determine and provide for recreational opportunities on Steens Mountain and we invite you to be part of the planning process.  During the next year we are seeking public comment on recreational opportunities and facilities and activities that occur or should occur on Steens Mountain.  Scoping period open December 2007 through December 2008.]]></description><category>Burns</category><category>Scoping Letter</category><pubDate>Tue, 04 Dec 2007 08:00:00 PST</pubDate>
</item><item>
<title>Steens Mountain Travel Management Plan - FONSI/Decision Record</title>
<link>http://www.blm.gov/or/districts/burns/plans/files/DR 2 Final &amp; maps.pdf</link>
<guid>http://www.blm.gov/or/districts/burns/plans/files/DR 2 Final &amp; maps.pdf</guid><description><![CDATA[Steens Mountain Travel Management Plan decision record.]]></description><category>Burns</category><category>FONSI/Decision Record</category><pubDate>Wed, 28 Nov 2007 08:00:00 PST</pubDate>
</item><item>
<title>Upper No Name Spring Reservoir Reconstruction - Environmental Assessment</title>
<link>http://www.blm.gov/or/districts/burns/plans/files/UpNoNameSpEA_map.pdf</link>
<guid>http://www.blm.gov/or/districts/burns/plans/files/UpNoNameSpEA_map.pdf</guid><description><![CDATA[The project would restore and enhance the free-flowing natural and wet meadow characteristics of riparian meadows so hydrologic function can support the potential natural community, including plant species important to greater sage-grouse, and reliable clean drinking water would be available for livestock during the authorized season of use.]]></description><category>Burns</category><category>Environmental Assessment</category><pubDate>Wed, 17 Oct 2007 08:00:00 PST</pubDate>
</item><item>
<title>Rock Creek Land Exchange/Land Sale - FONSI/Decision Record</title>
<link>http://www.blm.gov/or/districts/burns/plans/files/RockCreekRanch All DOCS.pdf</link>
<guid>http://www.blm.gov/or/districts/burns/plans/files/RockCreekRanch All DOCS.pdf</guid><description><![CDATA[Implement the proposed actions -  acquisition of the fee simple estate of the non-Federal land comprised of approximately 233.25 acres north of Mann Lake in Harney County, Oregon, by warranty deed.  In exchange, disposal of the fee simple estate of the Federal lands comprised of approximately 1,124.09 acres would occur by quitclaim deed and/or patent.  Also, approximately 240.00 acres in Catlow Valley, Harney County, Oregon, would be disposed of by quitclaim deed and/or patent.]]></description><category>Burns</category><category>FONSI/Decision Record</category><pubDate>Wed, 03 Oct 2007 08:00:00 PST</pubDate>
</item><item>
<title>North Steens Ecosystem Restoration Project - Record of Decision</title>
<link>http://www.blm.gov/or/districts/burns/plans/files/North Steens ROD DIP Maps.pdf</link>
<guid>http://www.blm.gov/or/districts/burns/plans/files/North Steens ROD DIP Maps.pdf</guid><description><![CDATA[The BLM selected the Preferred Alternative comprised of the following three elements: 1. The Full Treatment Alternative will be implemented in all portions of the Project Area including Wilderness Study Areas (WSA), but excluding Steens Mountain Wilderness; 2. The Continuation of Current Management Alternative is selected for Steens Mountain Wilderness; and 3. Future proposals in Steens Mountain Wilderness will be in conformance with the Steens Act and Wilderness Act.]]></description><category>Burns</category><category>Record of Decision</category><pubDate>Fri, 28 Sep 2007 08:00:00 PST</pubDate>
</item><item>
<title>Otis Mountain/Moffet Table Fuels Management - Decision Record</title>
<link>http://www.blm.gov/or/districts/burns/plans/files/Otis_Decision_92507_with comments.pdf</link>
<guid>http://www.blm.gov/or/districts/burns/plans/files/Otis_Decision_92507_with comments.pdf</guid><description><![CDATA[Implement a portion of the proposed action: implement all of the rangeland burning and silvicultural thinning outside of the Rudy treatment area in the northeastern corner of the project area.  A portion of the silvicultural thinning treatments will be accomplished under stewardship contracting authority.  ]]></description><category>Burns</category><category>Decision Record</category><pubDate>Tue, 25 Sep 2007 08:00:00 PST</pubDate>
</item><item>
<title>Reicken&amp;#039;s Corner Allotment Managment Plan - Environmental Assessment</title>
<link>http://www.blm.gov/or/districts/burns/plans/files/Reickens Corner Allotment Management Plan EA.pdf</link>
<guid>http://www.blm.gov/or/districts/burns/plans/files/Reickens Corner Allotment Management Plan EA.pdf</guid><description><![CDATA[The proposed action is to implement a new Reicken&amp;#039;s Corner AMP which would incorporate the following changes:  1) provide for deferred grazing on the seeding pastures, 2) issue a nonrenewable grazing permit on an annual basis when forage is temporarily available, and 3) rerouting a pasture boundary fence at the permittee&amp;#039;s request.]]></description><category>Burns</category><category>Environmental Assessment</category><pubDate>Tue, 11 Sep 2007 08:00:00 PST</pubDate>
</item><item>
<title>North Steens Ecosystem Restoration Project - Environmental Impact Statement</title>
<link>http://www.blm.gov/or/districts/burns/plans/files/North Steens EIS.pdf</link>
<guid>http://www.blm.gov/or/districts/burns/plans/files/North Steens EIS.pdf</guid><description><![CDATA[The North Steens Project is a landscape level project that proposes utilization of prescribed fire and western juniper treatments to manage fuels, reintroduce fire and the natural function of the historic fire regime to the project area, restore habitat, and increase forage for grazing.  NOTE:  Supporting maps for this document are available by request from the Burns District Office.  ]]></description><category>Burns</category><category>Environmental Impact Statement</category><pubDate>Fri, 17 Aug 2007 08:00:00 PST</pubDate>
</item><item>
<title>Pinecraft Hazardous Fuels Reduction - Environmental Assessment</title>
<link>http://www.blm.gov/or/districts/burns/plans/files/Pinecraft Hazardous Fuels EA.pdf</link>
<guid>http://www.blm.gov/or/districts/burns/plans/files/Pinecraft Hazardous Fuels EA.pdf</guid><description><![CDATA[Implement a multi-staged hazardous fuels reduction project.  Proposed activities to mitigate hazardous fuels would include noncommercial and commercial thinning, and various applications of prescribed fire.  The project is within dry ponderosa pine forest and woodland in the Craft Point and Pine Creek project sites in the Three Rivers Resource Area.]]></description><category>Burns</category><category>Environmental Assessment</category><pubDate>Wed, 01 Aug 2007 08:00:00 PST</pubDate>
</item><item>
<title>Pinecraft Hazardous Fuels Reduction - Finding of No Significant Impact</title>
<link>http://www.blm.gov/or/districts/burns/plans/files/Pinecraft FONSI.pdf</link>
<guid>http://www.blm.gov/or/districts/burns/plans/files/Pinecraft FONSI.pdf</guid><description><![CDATA[Based on the analysis of potential environmental impacts contained in the Environmental Assessment (EA) and all other information gathered during scoping and by the IDT, it is determined the proposed action and alternatives analyzed do not constitute a major Federal action that would significantly impact the quality of the human environment.  In addition, the proposed action would have no impacts that exceed the scope and intensity of anticipated impacts already considered in the Three Rivers Proposed RMP/Final Environmental Impact Statement (FEIS, 1991).  Therefore, a project-specific EIS is not necessary and will not be prepared.]]></description><category>Burns</category><category>Finding of No Significant Impact</category><pubDate>Wed, 01 Aug 2007 08:00:00 PST</pubDate>
</item><item>
<title>Camp Harney/Cow Creek Ecological Restoration - Finding of No Significant Impact</title>
<link>http://www.blm.gov/or/districts/burns/plans/files/Camp Harney_Cow CreekFONSI.pdf</link>
<guid>http://www.blm.gov/or/districts/burns/plans/files/Camp Harney_Cow CreekFONSI.pdf</guid><description><![CDATA[Remove western juniper and other conifers from vegetative communities where conifers are encroaching or have taken over desirable plant communities across the 16,201-acre Project Area.  ]]></description><category>Burns</category><category>Finding of No Significant Impact</category><pubDate>Tue, 17 Jul 2007 08:00:00 PST</pubDate>
</item><item>
<title>Otis Mountain/Moffet Table Fuels Management - Environmental Assessment</title>
<link>http://www.blm.gov/or/districts/burns/plans/files/Otis Mountain_Moffet Table Fueld Management Project EA.pdf</link>
<guid>http://www.blm.gov/or/districts/burns/plans/files/Otis Mountain_Moffet Table Fueld Management Project EA.pdf</guid><description><![CDATA[Utilize a combination of prescribed burning and silvicultural thinning to reduce fuels and restore fire adapted ecosystems on 5,000 acres of ponderosa pinedominated forests and woodlands; and 26,500 acres of sagebrush-steppe within the project area.]]></description><category>Burns</category><category>Environmental Assessment</category><pubDate>Wed, 20 Jun 2007 08:00:00 PST</pubDate>
</item><item>
<title>Otis Mountain/Moffet Table Fuels Management - Finding of No Significant Impact</title>
<link>http://www.blm.gov/or/districts/burns/plans/files/OTISMOFFET_EAFONSI_Doris.pdf</link>
<guid>http://www.blm.gov/or/districts/burns/plans/files/OTISMOFFET_EAFONSI_Doris.pdf</guid><description><![CDATA[Based on the analysis of potential environmental impacts contained in the EA and all other information, I have determined that the proposed action and alternatives analyzed do not constitute a major Federal action that would significantly impact the quality of the human environment.  Therefore, an EIS is not necessary and will not be prepared.]]></description><category>Burns</category><category>Finding of No Significant Impact</category><pubDate>Wed, 20 Jun 2007 08:00:00 PST</pubDate>
</item><item>
<title>Basque Hills Allotment Management Plan - Environmental Assessment</title>
<link>http://www.blm.gov/or/districts/burns/plans/files/Basque Hills AMP EA and MAPS.pdf</link>
<guid>http://www.blm.gov/or/districts/burns/plans/files/Basque Hills AMP EA and MAPS.pdf</guid><description><![CDATA[Proposing to change the season of use in the Basque Hills Allotment and install a new water well with 1 mile of pipe and a trough.]]></description><category>Burns</category><category>Environmental Assessment</category><pubDate>Wed, 09 May 2007 08:00:00 PST</pubDate>
</item><item>
<title>Basque Hills Allotment Management Plan - FONSI/Decision Record</title>
<link>http://www.blm.gov/or/districts/burns/plans/files/Basque Hills FONSI DR.pdf</link>
<guid>http://www.blm.gov/or/districts/burns/plans/files/Basque Hills FONSI DR.pdf</guid><description><![CDATA[Proposing to change the season of use in the Basque Hills Allotment (#6042) from April 1 to June 30 every year to February 15 to May 1 and August 1 to November 15 (2 to 3 weeks water dependant) every other year.  Along with a change of grazing season, a new water well with 1-mile of pipe and a trough is proposed in the northwest portion of the allotment.]]></description><category>Burns</category><category>FONSI/Decision Record</category><pubDate>Wed, 09 May 2007 08:00:00 PST</pubDate>
</item><item>
<title>Pueblo-Lone Mountain Biological Crust Exclosure - Environmental Assessment</title>
<link>http://www.blm.gov/or/districts/burns/plans/files/Pueblo-Lone Mountain Biological Crust Exclosure EA with MAP.pdf</link>
<guid>http://www.blm.gov/or/districts/burns/plans/files/Pueblo-Lone Mountain Biological Crust Exclosure EA with MAP.pdf</guid><description><![CDATA[The proposal is to construct a small 12m by 3m exclosure in the Rincon Wilderness Study Area (WSA), north of Foothills Road (T. 39 S., R. 32 E., Section 27, NESE).  The exclosure would be temporary in nature, constructed by wiring 4-foot by 16-foot heavy gauge &quot;bull panels&quot; to 5 &frac12;-foot steel fenceposts.  The exclosure could be removed at a later date once monitoring objectives are met.  This exclosure is required in order to complete court-ordered monitoring efforts. ]]></description><category>Burns</category><category>Environmental Assessment</category><pubDate>Thu, 19 Apr 2007 08:00:00 PST</pubDate>
</item><item>
<title>Pueblo-Lone Mountain Biological Crust Exclosure - FONSI/Decision Record</title>
<link>http://www.blm.gov/or/districts/burns/plans/files/Pueblo-Lone Mountain Biological Crust Exclosure FONSI and Decision.pdf</link>
<guid>http://www.blm.gov/or/districts/burns/plans/files/Pueblo-Lone Mountain Biological Crust Exclosure FONSI and Decision.pdf</guid><description><![CDATA[Implement the proposed action to construct a small 12m by 3m exclosure in Rincon Wilderness Study Area.  This structure would be built by wiring heavy gauge steel &quot;bull panels&quot; to 5 &frac12;-foot steel green fenceposts and would be temporary in nature.]]></description><category>Burns</category><category>FONSI/Decision Record</category><pubDate>Thu, 19 Apr 2007 08:00:00 PST</pubDate>
</item><item>
<title>Pass Creek Riparian Pasture Fence - Environmental Assessment</title>
<link>http://www.blm.gov/or/districts/burns/plans/files/Pass Creek Riparian Pasture EA with MAP.pdf</link>
<guid>http://www.blm.gov/or/districts/burns/plans/files/Pass Creek Riparian Pasture EA with MAP.pdf</guid><description><![CDATA[Construct approximately 2 miles of fence along Pass Creek in O&amp;#039;Keefe Seeding Pasture in Fields Basin Allotment to create a new riparian pasture.]]></description><category>Burns</category><category>Environmental Assessment</category><pubDate>Wed, 18 Apr 2007 08:00:00 PST</pubDate>
</item><item>
<title>Pass Creek Riparian Pasture Fence - FONSI/Decision Record</title>
<link>http://www.blm.gov/or/districts/burns/plans/files/Pass Creek Riparian Pasture FONSI and Decision.pdf</link>
<guid>http://www.blm.gov/or/districts/burns/plans/files/Pass Creek Riparian Pasture FONSI and Decision.pdf</guid><description><![CDATA[Implement the proposed action, which is to construct approximately 2 miles of fence along Pass Creek, connecting existing fence lines and creating the 1,100 acre Pass Creek Riparian Pasture.]]></description><category>Burns</category><category>FONSI/Decision Record</category><pubDate>Wed, 18 Apr 2007 08:00:00 PST</pubDate>
</item><item>
<title>Steens Mountain Travel Management Plan - Environmental Assessment</title>
<link>http://www.blm.gov/or/districts/burns/plans/files/Travel Plan EA_1107.pdf</link>
<guid>http://www.blm.gov/or/districts/burns/plans/files/Travel Plan EA_1107.pdf</guid><description><![CDATA[The Steens Mountain Travel Management Plan (TMP) augments the Cooperative Management and Protection Area (CMPA) Transportation Plan, which is part of the Steens Mountain CMPA Resource Management Plan.  The TMP uses and updated route inventory to further define the motor vehicle route network within the CMPA.  The TMP also provides guidance on maintenance, improvement, and accessibility of these routes.  The proposed action is most like the route network presently available in the CMPA.]]></description><category>Burns</category><category>Environmental Assessment</category><pubDate>Mon, 16 Apr 2007 08:00:00 PST</pubDate>
</item><item>
<title>Smyth-Kiger Allotment Management Plan - Scoping Letter</title>
<link>http://www.blm.gov/or/districts/burns/plans/files/Smyth-Kiger Allotment Management Plan Scoping Letter.pdf</link>
<guid>http://www.blm.gov/or/districts/burns/plans/files/Smyth-Kiger Allotment Management Plan Scoping Letter.pdf</guid><description><![CDATA[Gathering information in preparation for an Environmental Assessment to analyze proposed grazing management and range improvements in the Smyth-Kiger allotment.]]></description><category>Burns</category><category>Scoping Letter</category><pubDate>Mon, 05 Feb 2007 08:00:00 PST</pubDate>
</item><item>
<title>South Steens Water Development - Scoping Letter</title>
<link>http://www.blm.gov/or/districts/burns/plans/files/South Steens Water Development EA Scoping Letter.pdf</link>
<guid>http://www.blm.gov/or/districts/burns/plans/files/South Steens Water Development EA Scoping Letter.pdf</guid><description><![CDATA[Gathering information for preparation of an Environmental Assessment to analyze effects to grazing, Wild Horses, and Wilderness Study Area management in the South Steens Allotment.]]></description><category>Burns</category><category>Scoping Letter</category><pubDate>Fri, 22 Dec 2006 08:00:00 PST</pubDate>
</item><item>
<title>Picket Rim Bighorn Sheep Transplant - Environmental Assessment</title>
<link>http://www.blm.gov/or/districts/burns/plans/files/Sheep Transplant_EA.pdf</link>
<guid>http://www.blm.gov/or/districts/burns/plans/files/Sheep Transplant_EA.pdf</guid><description><![CDATA[This Environmental Assessment analyzes possible effects of releasing California bighorn sheep, a Bureau of Land Management (BLM) Special Status Species (SSS), into identified historical habitat on Pickett Rim near Frenchglen, Oregon, about 60 miles south of Burns, Oregon.]]></description><category>Burns</category><category>Environmental Assessment</category><pubDate>Wed, 01 Nov 2006 08:00:00 PST</pubDate>
</item><item>
<title>Picket Rim Bighorn Sheep Transplant - Finding of No Significant Impact</title>
<link>http://www.blm.gov/or/districts/burns/plans/files/Sheep Transplant_FONSI.pdf</link>
<guid>http://www.blm.gov/or/districts/burns/plans/files/Sheep Transplant_FONSI.pdf</guid><description><![CDATA[This proposal is in conformance with the various Federal laws, regulations and executive orders and with the Andrews Management Unit Record of Decision/Resource Management Plan (RMP) (2005) on Page 34, Objective 5, which states:  &quot;Maintain, restore or improve bighorn sheep habitat and allow for maintenance or further expansion of bighorn sheep populations as defined by the ODFW in Oregon&amp;#039;s Bighorn Sheep Management Plan.&quot;  ]]></description><category>Burns</category><category>Finding of No Significant Impact</category><pubDate>Wed, 01 Nov 2006 08:00:00 PST</pubDate>
</item><item>
<title>Five Creeks Rangeland Restoration - Environmental Assessment</title>
<link>http://www.blm.gov/or/districts/burns/plans/files/FiveCreeks_Final_Doris1_with MAPS.pdf</link>
<guid>http://www.blm.gov/or/districts/burns/plans/files/FiveCreeks_Final_Doris1_with MAPS.pdf</guid><description><![CDATA[Implement an ecological restoration project to manage encroaching juniper on both public and private lands within the Five Creeks Rangeland Restoration Project Area. The primary purposes of the Five Creeks Rangeland Restoration Project are to reduce hazardous fuels and restore and/or increase system functionality (i.e., capture and storage of water, soil nutrient retention) through the restoration of shrub-steppe, aspen and riparian communities.]]></description><category>Burns</category><category>Environmental Assessment</category><pubDate>Mon, 16 Oct 2006 08:00:00 PST</pubDate>
</item><item>
<title>Five Creeks Rangeland Restoration - FONSI/Decision Record</title>
<link>http://www.blm.gov/or/districts/burns/plans/files/5creeks_final_FONSIDR.pdf</link>
<guid>http://www.blm.gov/or/districts/burns/plans/files/5creeks_final_FONSIDR.pdf</guid><description><![CDATA[Implement the proposed action for the Five Creeks Rangeland Restoration as described in Environmental Assessment (EA) OR-06-027-022.  The proposed action is to utilize various forms of prescribed fire and mechanical treatments in the Five Creeks Rangeland Restoration Project Area (Project Area) to manage encroaching juniper and reduce hazardous fuels accumulations.]]></description><category>Burns</category><category>FONSI/Decision Record</category><pubDate>Mon, 16 Oct 2006 08:00:00 PST</pubDate>
</item><item>
<title>Willow Creek Road Re-route - Environmental Assessment</title>
<link>http://www.blm.gov/or/districts/burns/plans/files/WILLOW CREEK ROAD REROUTE.pdf</link>
<guid>http://www.blm.gov/or/districts/burns/plans/files/WILLOW CREEK ROAD REROUTE.pdf</guid><description><![CDATA[Responding to a request from private property owners, BLM proposes to find a better route location across Willow Creek that improves access for landowners while protecting natural resource values.]]></description><category>Burns</category><category>Environmental Assessment</category><pubDate>Tue, 10 Oct 2006 08:00:00 PST</pubDate>
</item><item>
<title>Black Rock Salvage and Restoration - Categorical Exclusion</title>
<link>http://www.blm.gov/or/districts/burns/plans/files/Black Rock CX documentation.pdf</link>
<guid>http://www.blm.gov/or/districts/burns/plans/files/Black Rock CX documentation.pdf</guid><description><![CDATA[Provide post-fire rehabilitation efforts with the Black Rock fire area.  Salvage log approximately 147 MBF of dead and dying ponderosa pine trees.  Remove fire-killed trees, reduce fuel loading, salvage merchantable timber, provide for snags and down wood debris, and plant 20,000 ponderosa pine seedlings.]]></description><category>Burns</category><category>Categorical Exclusion</category><pubDate>Mon, 25 Sep 2006 08:00:00 PST</pubDate>
</item><item>
<title>Rock Creek Land Exchange/Land Sale - Environmental Assessment</title>
<link>http://www.blm.gov/or/districts/burns/plans/files/Rock Creek land exchange EA &amp; maps.pdf</link>
<guid>http://www.blm.gov/or/districts/burns/plans/files/Rock Creek land exchange EA &amp; maps.pdf</guid><description><![CDATA[Proposed action: The BLM would acquire the fee simple estate of approximately 233.25 acres within the CMPA in exchange for the fee simple estate of up to approximately 1,411.17 acres of Federal land in Catlow Valley, both surface and minerals.  The land values would be equalized based on a market value appraisal with up to a 25 percent cash equalization payment if necessary.  The BLM would block up Federal land for wildlife habitat, provide casual recreation opportunities, protect the east side of the Steens Mountain viewshed from development, and a trespass case would be settled.]]></description><category>Burns</category><category>Environmental Assessment</category><pubDate>Tue, 12 Apr 2005 08:00:00 PST</pubDate>
</item></channel>