. .

U.S. DEPARTMENT OF THE INTERIOR

BUREAU OF LAND MANAGEMENT

Oregon / Washington

NEPA Project Details

RSS Icon

Take 3 Timber Sale

Salem

Documents in Project

Scoping Letter DOI-BLM-OR-S040-2011-0004-EA Planning in Progress
Take 3 Thinning (DOI-BLM-OR-S040-2011-0004-EA): The proposed action is to thin approximately 370 acres of 30-90 year-old forest stands within the Matrix and Riparian Reserve land use allocations (LUA). T. 3.S., R.5E., Sections 11, 13 within the Eagle Creek Watershed near Estacada OR, Clackamas County
Alisa Tanner
503-589-6844
n/a
Resource Area: Cascades
Program Areas: Timber/Silviculture
Download: scopingletter.pdf
Document Publish Date
Comment:
06/10/2011
06/03/2011 - 07/18/2011
Environmental Assessment,Finding of No Significant Impact DOI-BLM-OR-S040-2011-0004-EA Planning in Progress
The Cascades Resource Area has completed the Take 3 Thinning Environmental Assessment and Finding of No Significant Impact (EA). This EA is available for review. The proposed action is to thin approximately 342 acres of 30-96 year old forest stands. Connected actions associated with this project would include the decommissioning or renovation of existing roads, fuels management and a small amount of permanent new road construction. Approximately 0.15 miles of permanent new road would be constructed. Approximately 1.10 miles of temporary road would be constructed and decommissioned after operations. An additional 0.47 miles of existing road would be decommissioned. Approximately 1.55 miles of existing road would be renovated, and one gate would be installed. Contact: Alisa Tanner 503-589-6844
Alisa Tanner
503-589-6844
n/a
Resource Area: Cascades
Program Areas: Timber/Silviculture
Download: Take_3_final.pdf
Document Publish Date
Comment:
11/20/2012
11/20/2012 - 12/19/2012
Decision Record DOI-BLM-OR-SO40-2011-0004-EA Planning in Progress
Summary: The Cascades Resource Area has completed the Take 3 Thinning Decision Rationale and Finding of No Significant Impact (DR). This DR is available for review. The decision is to thin approximately 330 acres of 30-96 year old forest stands. Connected actions associated with this project would include the decommissioning or renovation of existing roads, fuels management and approximately 0.12 miles of permanent new road construction. Approximately 0.88 miles of temporary road would be constructed and decommissioned after operations. An additional 0.47 miles of existing road would be decommissioned. Approximately 1.55 miles of existing road would be renovated, and one gate would be installed. The project is located within Township 3 South, Range 5 East, Sections 11 and 13, WM, within the North Eagle Creek and Upper Eagle Creek 6th field watersheds, Clackamas County, Oregon. For further information contact: Alisa Tanner at 503-589-6844. Public Protest / Appeal Start Date: April 24, 2013 Public Protest / Appeal End Date: May 09, 2013
Alisa Tanner
503-589-6844
n/a
Resource Area: Salem DO
Program Areas: Timber/Silviculture
Download: take3desrecord.pdf
Document Publish Date
Protest:
04/17/2013
04/24/2013 - 05/09/2013

Historic Salem Planning Documents / Current Salem Planning Documents