. .

U.S. DEPARTMENT OF THE INTERIOR

BUREAU OF LAND MANAGEMENT

Oregon / Washington

NEPA Project Details

Return to NEPA Documents

Project: Highland Flung Thinning

Project Status: Planning in Progress
Office Location: Salem
Resource Area: Cascades
NEPA #: OR080-08-05  Decision Rationale
Document Publish Date: 11/17/2010
Summary: The Bureau of Land Management (BLM), Cascades Resource Area has made a decision to thin 149 acres of forest stands averaging 31-89 years old. Approximately 84 percent of these acres are in forest stands less than 80 years old. This project will be implemented as the Highland Flung Thinning timber sale, which was analyzed in the Highland Fling EA. Other actions include: 17 acres of fuels treatment, 3 acres of road right-of-way clearing for 0.5 mile of new road construction, and 0.4 mile of road renovation. The project is located in T. 4 S., R. 4 E., Sections 21, 27 and 29, W.M. in Clackamas County, Oregon.
Public Protest/Appeal Start Date : 11/17/2010
Public Protest/Appeal End Date : 12/02/2010
Contact: Rudy Hefter
Contact Phone: 503-375-5671
Program Areas: Timber/Silviculture
NEPA #: OR080-08-05  Environmental Assessment
Document Publish Date: 3/24/2010
Summary: The Highland Fling Thinning Environmental Assessment and Finding of No Significant Impact (EA) has been completed and is available for review. The proposed project is to thin approximately 720 acres of forest located on BLM lands within the Cascades Resource Area in Clackamas County. Connected actions would include: treatment to reduce forest fuel on approximately 370 acres; removing a failing log fill road crossing to restore the stream channel location; construction of up to 5.3 miles of temporary natural surface road; and renovation and maintenance of approximately 6 miles of existing road. The project is located on BLM lands within: Section 35, Township 3 South, Range 3 East; Sections 1, 21, 27 and 29, Township 4 South, Range 3 East; and Sections 21, 27 and 29, Township 4 South, Range 4 East, Willamette Meridian. The proposed action would be implemented with two timber sales: (1) - The Highland Fling Thinning timber sale, August 2010, covers all units west of Highway 211. (2) - The Highland Flung Thinning timber sale, November 2010, covers all units east of Highway 211.
Public Review Start Date : 3/24/2010
Public Review End Date : 4/23/2010
Contact: Rudy Hefter
Contact Phone: 503-375-5671