Project development necessary for implementation of land use plans (Resource Management Plans) requires analysis under the National Environmental Policy Act (NEPA). NEPA ensures that the BLM (and other Federal agencies) consider the impact of an action on the quality of the human environment before decisions are made and the action is taken. Two types of NEPA documents that are prepared and provide opportunity for public involvement are Environmental Impact Statements and Environmental Assessments. There are certain actions which have been categorically excluded from further NEPA analysis because it has been determined that the actions have insignificant effects on the human environment. These actions are documented in a Categorical Exclusion review. Until recently, these types of actions were not subject to public review. New categories of excluded actions, including fuels and forest health treatments, now provide for a public review period for those actions.
Project planning updates provide BLM a means to achieve public scoping by notifying the public of the status of projects in the process of planning and analysis for implementation in the near future or currently being implemented.
Key Planning Efforts in Salem
There are a number of significant on-going planning efforts in the BLM Salem District. Some of these planning efforts include:
- Cascade Crossing Transmission Project
- Molalla River Planning Effort
- Vegetation Treatments using Herbicides on BLM Lands, Salem District
- Sandy River Basin Plan
For additional search options, use the advanced search page.

Documents Currently Under Public Review
The following list contains NEPA documents that are currently available for public review, protest, or appeal.
| Project Name | Start Date | End Date | Doc Type | Resource Area |
|---|---|---|---|---|
| Pacific City R&PP Public Scoping | 6/04/13 | 7/01/13 | Scoping Letter | Tillamook |
| Thompson Strip Land Tenure Adjustment | 6/10/13 | 7/10/13 | Decision Record | Marys Peak |
Existing/Historic Documents (Complete List)
The following list contains NEPA documents that have passed the public review period.
| Project Name | Date | Doc Type | Resource Area |
|---|---|---|---|
| Salem District Aquatic and Riparian Habitat Restoration | 6/19/2013 | Documentation of NEPA Adequacy | Marys Peak |
| Alder Creek Fish Passage Categorical Exclusion | 5/24/2013 | Categorical Exclusion / Decision Record | Cascades |
| Thompson Strip Land Tenure Adjustment | 5/15/2013 | Environmental Assessment / FONSI | Marys Peak |
| Crab Race Environmental Assessment and FONSI | 5/08/2013 | Environmental Assessment / FONSI | Cascades |
| Mudslinger Events | 4/26/2013 | Categorical Exclusion / Decision Record | Marys Peak |
| Rickreall Creek Watershed Enhancement | 4/24/2013 | Decision Record | Marys Peak |
| Upper Siletz River Watershed Enhancement | 4/24/2013 | Decision Record | Marys Peak |
| Commercial Film and Photography at Yaquina Head Outstanding Natural Area | 4/19/2013 | Categorical Exclusion / Decision Record | Marys Peak |
| Mosier Ridge Cellular Communications Facility | 4/17/2013 | Decision Record | Salem DO |
| Take 3 Timber Sale | 4/17/2013 | Decision Record | Salem DO |
| Hoag Pass | 4/15/2013 | Documentation of NEPA Adequacy | Tillamook |
| Marys Peak Resource Area Recreation Site Hazard Tree Management | 3/20/2013 | Categorical Exclusion / Decision Record | Marys Peak |
| CoastCom Authorization | 3/19/2013 | Categorical Exclusion / Decision Record | Marys Peak |
| Missouri Bend Land Acquisition | 3/15/2013 | Finding of No Significant Impact | Marys Peak |
| Missouri Bend Land Acquisition | 3/15/2013 | Decision Record | Marys Peak |
| Yaquina Head Outstanding Natural Area Native Plant Restoration and Roadside Thinning | 2/12/2013 | Documentation of NEPA Adequacy | Marys Peak |
| Marys Peak Resource Area 2010 to 2014 Young Stand Silvicultural Activities | 2/06/2013 | Categorical Exclusion / Decision Record | Marys Peak |
| Missouri Bend Land Acquisition | 2/06/2013 | Environmental Assessment / FONSI | Marys Peak |
| Fan Creek Density Management Project | 1/31/2013 | Documentation of NEPA Adequacy | Marys Peak |
| Marys Peak Resource Area Noxious Weed Control Utilizing Glyphosate | 1/21/2013 | Documentation of NEPA Adequacy | Marys Peak |
| Alsea Falls Recreation Area Management Plan | 1/18/2013 | Decision Record | Marys Peak |
| Gotaway Alder Timber Sale | 1/16/2013 | Decision Record | Marys Peak |
| Gotaway Alder Timber Sale | 1/16/2013 | Documentation of NEPA Adequacy | Marys Peak |
| Head East Re-Offer Timber Sale | 11/26/2012 | Documentation of NEPA Adequacy | Tillamook |
| Take 3 Timber Sale | 11/20/2012 | Environmental Assessment / FONSI | Cascades |
| Upper Siletz River Watershed Enhancement | 10/31/2012 | Decision Record | Marys Peak |
| Mini Flats Commercial Thinning CX | 10/31/2012 | Categorical Exclusion / Decision Record | Cascades |
| Coleman Creek Bridge Installation | 10/09/2012 | Documentation of NEPA Adequacy | Marys Peak |
| Alsea Falls Recreation Area Management Plan | 10/09/2012 | Environmental Assessment / FONSI | Marys Peak |
| Molalla LSR Habitat Enhancement | 9/26/2012 | Environmental Assessment | Cascades |
| Marys Peak Resource Area Road Maintenance | 9/24/2012 | Categorical Exclusion / Decision Record | Marys Peak |
| Communication Hill Vegetation Removal | 9/13/2012 | Categorical Exclusion / Decision Record | Marys Peak |
| Panther Creek Destructive Sampling | 9/11/2012 | Categorical Exclusion | Tillamook |
| Apple Rock Timber Sale | 7/25/2012 | Categorical Exclusion / Decision Record | Marys Peak |
| Mosier Ridge Cellular Communications Facility | 7/25/2012 | Environmental Assessment | Cascades |
| Even Keel Thinning | 7/25/2012 | Decision Rationale | Cascades |
| Cycle Oregon 2012 Commercial Bicycle Ride Permit | 7/06/2012 | Categorical Exclusion / Decision Record | Marys Peak |
| Happy Creek and Side Channel Reconnection Project - Lower Sandy River | 7/03/2012 | Decision Record | Cascades |
| Even Keel Thinning | 6/19/2012 | Environmental Assessment | Cascades |
| South Fork Alsea Tree Falling | 6/18/2012 | Documentation of NEPA Adequacy | Marys Peak |
| Alsea Falls Recreation Site Sign Installation | 6/18/2012 | Categorical Exclusion / Decision Record | Marys Peak |
| Botkin Road Shooting Area Rehabilitation | 6/13/2012 | Categorical Exclusion / Decision Record | Marys Peak |
| Happy Creek and Side Channel Reconnection Project - Lower Sandy River | 6/06/2012 | Environmental Assessment | Cascades |
| Upper Siletz River Watershed Enhancement | 5/30/2012 | Decision Record | Marys Peak |
| Lower Mill Creek Enhancement | 5/30/2012 | Decision Record | Marys Peak |
| Power Mill Thinning | 5/30/2012 | Decision Rationale | Cascades |
| Wind Creek Salvage CX | 5/30/2012 | Categorical Exclusion / Decision Record | Marys Peak |
| 2012 Revised Rickard Creek Timber Sale EA | 5/09/2012 | Decision Record | Marys Peak |
| Rickreall Creek Watershed Enhancement | 5/02/2012 | Decision Record | Marys Peak |
| Rickreall Creek Watershed Enhancement | 5/01/2012 | Finding of No Significant Impact | Marys Peak |
| 2012 Revised Rickard Creek Timber Sale EA | 4/26/2012 | Finding of No Significant Impact | Marys Peak |
| Power Mill Thinning | 4/10/2012 | Environmental Assessment | Cascades |
| Salem District Aquatic and Riparian Habitat Restoration | 3/23/2012 | Decision Record | Salem DO |
| Mainline II Salvage | 3/20/2012 | Categorical Exclusion / Decision Record | Marys Peak |
| Upper Siletz River Watershed Enhancement | 3/14/2012 | Finding of No Significant Impact | Marys Peak |
| Rickreall Creek Watershed Enhancement | 3/07/2012 | Environmental Assessment / FONSI | Marys Peak |
| Salem District Aquatic and Riparian Habitat Restoration | 3/05/2012 | Environmental Assessment / FONSI | Salem DO |
| 2012 Revised Rickard Creek Timber Sale EA | 2/15/2012 | Environmental Assessment / FONSI | Marys Peak |
| Highway 34 Emergency Stabilization | 2/07/2012 | Categorical Exclusion / Decision Record | Marys Peak |
| Marys Peak Resource Area 2010 to 2014 Young Stand Silvicultural Activities | 2/06/2012 | Categorical Exclusion / Decision Record | Marys Peak |
| Airstrip Thinning | 1/17/2012 | Decision Rationale | Cascades |
| South Fork Lobster Creek Culvert Replacement | 1/17/2012 | Categorical Exclusion / Decision Record | Marys Peak |
| Special Forest Products Program | 1/17/2012 | Categorical Exclusion / Decision Record | Marys Peak |
| Rockhouse Early-Seral Enhancement | 1/17/2012 | Categorical Exclusion / Decision Record | Marys Peak |
| Pioneer Telephone Cooperative, Amendment No. 6 to Right-of-Way Grant OR 59854 | 11/28/2011 | Categorical Exclusion / Decision Record | Marys Peak |
| Cingular Wireless Right-of-Way Authorization | 11/28/2011 | Categorical Exclusion / Decision Record | Marys Peak |
| South Scappoose Creek Project | 11/23/2011 | Decision Record | Tillamook |
| Parker Bear Decision Record | 10/18/2011 | Decision Record | Marys Peak |
| Parker Bear Reoffer Timber Sale | 10/18/2011 | Documentation of NEPA Adequacy | Marys Peak |
| South Scappoose Creek Project | 9/14/2011 | Environmental Assessment / FONSI | Tillamook |
| Silver Falls State Park Recreation and Public Purposes Lease | 8/30/2011 | Decision Record | Cascades |
| Buck Roberts Mid-Seral Enhancement | 7/26/2011 | Decision Record | Marys Peak |
| Molalla River-Table Rock Recreation Area Management Plan | 7/13/2011 | Decision Record | Cascades |
| Silver Falls State Park Recreation and Public Purposes Lease | 7/13/2011 | Environmental Assessment / FONSI | Cascades |
| Coleman Creek Bridge Installation | 6/30/2011 | Environmental Assessment | Marys Peak |
| Tillamook Resource Area Coarse Woody Debris Creation Project | 6/29/2011 | Scoping Letter | Tillamook |
| Little North Santiam River and Elkhorn Creek Habitat Restoration | 6/29/2011 | Decision Record | Cascades |
| North Fork Overlook Mid-Seral Enhancement | 6/29/2011 | Decision Record | Marys Peak |
| Coleman Creek Bridge Installation | 6/29/2011 | Decision Record | Marys Peak |
| Vegetation Treatments Using Herbicides on BLM Lands in the Salem District | 6/21/2011 | Scoping Letter | Salem DO |
| Alsea Falls Recreation Area Management Plan | 6/17/2011 | Scoping Letter | Marys Peak |
| East Beaver Project | 6/17/2011 | Decision Record | Tillamook |
| Quartzville Late Successional Reserve (LSR) Habitat Enhancement | 6/15/2011 | Decision Record | Cascades |
| Take 3 Timber Sale | 6/10/2011 | Scoping Letter | Cascades |
| Little North Santiam River and Elkhorn Creek Habitat Restoration | 6/07/2011 | Environmental Assessment | Cascades |
| East Beaver Project | 6/02/2011 | Environmental Assessment | Tillamook |
| Airstrip Thinning | 6/01/2011 | Environmental Assessment | Cascades |
| Quartzville Late Successional Reserve (LSR) Habitat Enhancement | 5/25/2011 | Environmental Assessment | Cascades |
| Rocky Point Bald Eagle Habitat Enhancement Project | 5/24/2011 | Decision Record | Tillamook |
| Gordon Creek Thinning | 4/27/2011 | Decision Rationale | Cascades |
| Turner Creek Project | 4/18/2011 | Decision Record | Tillamook |
| Gordon Creek Thinning | 4/15/2011 | Environmental Assessment | Cascades |
| Coleman Creek Bridge Installation | 4/07/2011 | Scoping Letter | Marys Peak |
| Rocky Point Bald Eagle Habitat Enhancement Project | 4/04/2011 | Environmental Assessment | Tillamook |
| Cedar Creek Projects | 4/04/2011 | Finding of No Significant Impact | Tillamook |
| Cedar Creek Projects | 4/04/2011 | Decision Record | Tillamook |
| Turner Creek Project | 3/03/2011 | Environmental Assessment / FONSI | Tillamook |
| Yaquina Head Outstanding Natural Area Native Plant Restoration and Roadside Thinning | 3/01/2011 | Categorical Exclusion / Decision Record | Marys Peak |
| Missouri Ridge Thinning | 2/24/2011 | Decision Rationale | Cascades |
| 2011 and 2012 Salem District Sample Tree Falling Project | 2/15/2011 | Categorical Exclusion / Decision Record | Salem DO |
| Marys Peak Resource Area 2010 to 2014 Young Stand Silvicultural Activities | 2/01/2011 | Categorical Exclusion / Decision Record | Marys Peak |
| Buckner Creek Commercial Thinning, Buckner Creek Habitat Improvement | 1/19/2011 | Categorical Exclusion | Cascades |
| South Fork Lobster Creek and Rock Pit Creek Culvert Replacement Project | 12/23/2010 | Categorical Exclusion | Marys Peak |
| Cedar Creek Projects | 12/13/2010 | Environmental Assessment / FONSI | Tillamook |
| Wildwood Fish Viewing Window Replacement | 12/01/2010 | Scoping Letter | Cascades |
| Highland Flung Thinning | 11/17/2010 | Decision Rationale | Cascades |
| Consumers Power, Inc. - 2nd amendment to ROW OR060205 | 11/10/2010 | Decision Record | Cascades |
| Silver Falls State Park Recreation and Public Purposes Lease | 11/03/2010 | Scoping Letter | Cascades |
| Consumers Power, Inc. - 2nd amendment to ROW OR060205 | 10/20/2010 | Environmental Assessment / FONSI | Cascades |
| Bald Mountain and Rock Creek Communication Sites Rights-of-Way | 10/06/2010 | FONSI/Decision Record | Tillamook |
| Consumers Power, Inc. - 2nd amendment to ROW OR060205 | 9/20/2010 | Scoping Letter | Cascades |
| Bald Mountain and Rock Creek Communication Sites Rights-of-Way | 9/10/2010 | Environmental Assessment | Tillamook |
| Rock Creek Culvert Installation | 8/23/2010 | Decision Record | Cascades |
| Highland Fling Thinning | 8/18/2010 | Decision Rationale | Cascades |
| Revised South Fork Alsea Access Road Hazard Tree Removal/Roadside Enhancement and Alsea Falls Park Enhancement Projects | 8/16/2010 | Finding of No Significant Impact | Marys Peak |
| Alsea Falls Park Enhancement Project | 8/13/2010 | Decision Rationale | Marys Peak |
| Bottleneck Late Successional Reserve Enhancement Project 1 | 8/13/2010 | Decision Rationale | Marys Peak |
| Upper Siletz River Watershed Enhancement | 8/09/2010 | Environmental Assessment | Marys Peak |
| Gunners Lakes Project | 7/30/2010 | Decision Record | Tillamook |
| Revised Bottleneck Late-Successional Reserve Enhancement | 7/27/2010 | Finding of No Significant Impact | Marys Peak |
| Marys Peak Resource Area Fiscal Years 2010/2011 Legacy Tree Release | 7/20/2010 | Decision Rationale | Marys Peak |
| Marys Peak Resource Area Fiscal Years 2010/2011 Legacy Tree Release | 7/20/2010 | Finding of No Significant Impact | Marys Peak |
| Revised South Fork Alsea Access Road Hazard Tree Removal/Roadside Enhancement and Alsea Falls Park Enhancement Projects | 7/16/2010 | Environmental Assessment / FONSI | Marys Peak |
| Marys Peak Resource Area Fiscal Years 2010/2011 Legacy Tree Release | 6/30/2010 | Environmental Assessment / FONSI | Marys Peak |
| Revised Bottleneck LSR Enhancement | 6/29/2010 | Environmental Assessment / FONSI | Marys Peak |
| Horning Orchard Roguing/Thinning Stewardship | 6/22/2010 | Categorical Exclusion / Decision Record | Salem DO |
| Molalla River-Table Rock Recreation Area Management Plan | 6/17/2010 | Environmental Assessment | Cascades |
| Salmon River Habitat Restoration Project | 6/08/2010 | Decision Record | Cascades |
| Lower Mill Creek Enhancement | 6/01/2010 | Categorical Exclusion / Decision Record | Marys Peak |
| Lost Lulay Thinning | 5/26/2010 | Decision Rationale | Cascades |
| Gordon Creek Thinning | 5/26/2010 | Decision Rationale | Cascades |
| Bummer Ridge Mid-Seral Enhancement | 5/25/2010 | Decision Record | Marys Peak |
| Progeny Test Site (PTS) Thinning (Fiscal Years 2010-2011) Silviculture | 5/19/2010 | Categorical Exclusion / Decision Record | Marys Peak |
| Revised Upper and Lower Alsea River Watershed Restoration | 5/19/2010 | Environmental Assessment / FONSI | Marys Peak |
| Pioneer Telephone Cooperative Lobster Road Amendment | 5/19/2010 | Categorical Exclusion / Decision Record | Marys Peak |
| Salmon River Habitat Restoration Project | 5/19/2010 | Environmental Assessment / FONSI | Cascades |
| Gunners Lakes Project | 5/17/2010 | Environmental Assessment / FONSI | Tillamook |
| PGE Powerline Rights-of-Way Authorizations | 5/17/2010 | Categorical Exclusion / Decision Record | Tillamook |
| WOEC Transmission Line Permit | 5/03/2010 | Categorical Exclusion / Decision Record | Tillamook |
| Marys Peak Resource Area 2010 to 2014 Young Stand Silvicultural Activities | 5/03/2010 | Categorical Exclusion / Decision Record | Marys Peak |
| Preacher Creek Culvert Replacement Project | 4/30/2010 | FONSI/Decision Record | Marys Peak |
| Marys Peak Resource Area Noxious Weed Control Utilizing Glyphosate | 4/29/2010 | FONSI/Decision Record | Marys Peak |
| Marys Peak Meadow Restoration | 4/29/2010 | FONSI/Decision Record | Marys Peak |
| Von Road and Testament Creek Road Project | 4/16/2010 | FONSI/Decision Record | Tillamook |
| Revised Upper and Lower Alsea River Watershed Restoration | 4/05/2010 | Environmental Assessment / FONSI | Marys Peak |
| Lost Lulay Thinning | 3/31/2010 | Environmental Assessment | Cascades |
| Von Road and Testament Creek Road Project | 3/30/2010 | Environmental Assessment | Tillamook |
| Highland Flung Thinning | 3/24/2010 | Environmental Assessment | Cascades |
| Highland Fling Thinning | 3/24/2010 | Environmental Assessment | Cascades |
| Delph Creek Density Management and Riparian Buffer Study (Delph Creek Re-Thin Timber Sale) | 3/23/2010 | Decision Rationale | Cascades |
| Revised Green Peak Density II Management | 3/22/2010 | FONSI/Decision Record | Marys Peak |
| Green Peak II Density Management | 3/18/2010 | FONSI/Decision Record | Marys Peak |
| High Heaven ROW Permit | 3/12/2010 | FONSI/Decision Record | Tillamook |
| Marys Peak Resource Area Noxious Weed Control Utilizing Glyphosate | 3/10/2010 | Environmental Assessment / FONSI | Marys Peak |
| Marys Peak Meadow Restoration | 3/09/2010 | Environmental Assessment / FONSI | Marys Peak |
| BLM Road 13-11-23 Road Reconstruction/Decommisioning | 3/09/2010 | Categorical Exclusion / Decision Record | Marys Peak |
| Bull Run Creek Large Wood Replacement Project | 3/09/2010 | Finding of No Significant Impact | Marys Peak |
| Bull Run Creek Large Wood Replacement Project | 3/09/2010 | Decision Rationale | Marys Peak |
| High Heaven Communication Site ROW Amendment | 2/24/2010 | Environmental Assessment | Tillamook |
| Gordon Creek Thinning | 2/22/2010 | Decision Rationale | Cascades |
| Hull Park Road Salvage FY 2010 Timber Sale | 2/22/2010 | Categorical Exclusion / Decision Record | Marys Peak |
| Revised Green Peak II Density Management EA/FONSI | 2/16/2010 | Environmental Assessment / FONSI | Marys Peak |
| Rickard Creek Timber Sale Revised Environmental Assessment and Finding of No Significant Impact | 12/14/2009 | Environmental Assessment / FONSI | Marys Peak |
| Longhorn Timber Sale | 11/16/2009 | Categorical Exclusion / Decision Record | Salem DO |
| Prairie Mountain Communication Site Amendment | 11/09/2009 | Decision Record | Marys Peak |
| Scappoose Oil and Gas Competitive Leasing | 10/30/2009 | Documentation of NEPA Adequacy | Tillamook |
| Prairie Mountain Communication Site Amendment EA/FONSI | 10/22/2009 | Environmental Assessment / FONSI | Marys Peak |
| Cold Springs Late Successional Reserve Enhancement | 10/21/2009 | Decision Record | Marys Peak |
| Fan Creek Density Management Project | 10/15/2009 | Documentation of NEPA Adequacy | Tillamook |
| Delph Creek Density Management and Riparian Buffer Study | 10/13/2009 | Environmental Assessment | Cascades |
| Alsea Falls Park Waterline Replacement Project | 9/28/2009 | Decision Rationale | Marys Peak |
| Oregon State University Right-of-Way | 9/09/2009 | FONSI/Decision Record | Tillamook |
| 2009-2010 Sample Tree Falling | 8/31/2009 | Categorical Exclusion / Decision Record | Salem DO |
| Beeline Thinning Timber Sale | 8/28/2009 | Decision Rationale | Cascades |
| Oregon State University Right-of-Way | 8/25/2009 | Environmental Assessment | Tillamook |
| Willamina Road Salvage | 8/17/2009 | Categorical Exclusion / Decision Record | Tillamook |
| Elkhorn Creek Habitat Restoration | 8/07/2009 | Decision Record | Cascades |
| Marys Peak 2005-2009 (2009 Add Acres) Density Management/Preccommercial Thinning | 8/06/2009 | Categorical Exclusion / Decision Record | Salem DO |
| Progeny Test Site Thinning (Fiscal Year 2009 to 2010) | 8/06/2009 | Categorical Exclusion / Decision Record | Salem DO |
| Upper and Lower Alsea River Watershed Restoration | 7/15/2009 | Environmental Assessment / FONSI | Marys Peak |
| Elkhorn Creek Habitat Restoration | 7/08/2009 | Environmental Assessment | Cascades |
| Gooseneck Road and Mill Creek Road Fish Log Donation | 7/01/2009 | Categorical Exclusion / Decision Record | Marys Peak |
| Green Peak II Density Management | 7/01/2009 | Environmental Assessment / FONSI | Marys Peak |
| Rickard Creek Decision Rationale | 5/27/2009 | Decision Rationale | Marys Peak |
| Invasive Non-Native Plant Management | 5/20/2009 | Decision Record | Cascades |
| Tillamook Ridge Gate Installation | 5/13/2009 | Categorical Exclusion | Tillamook |
| Gordon Creek Thinning | 4/29/2009 | Decision Rationale | Cascades |
| Sandy River Basin Integrated Management Plan | 4/29/2009 | Decision Record | Cascades |
| Gordon Creek Thinning | 3/18/2009 | Environmental Assessment | Cascades |
| Bottleneck LSR Enhancement | 3/04/2009 | Environmental Assessment / FONSI | Marys Peak |
| Invasive Non-Native Plant Management | 2/25/2009 | Environmental Assessment | Cascades |
| Botkin Road and Klickitat Tie Road Fish Log Salvage | 2/12/2009 | Categorical Exclusion | Marys Peak |
| Plum Creek Timberland Amendment to ROW S-347 (Valsetz Area) | 2/12/2009 | Categorical Exclusion | Marys Peak |
| Moon Creek Projects | 12/30/2008 | Decision Rationale | Tillamook |
| South Fork Alsea Access Road Hazard Tree Removal/Alsea Falls Park Enhancement | 12/30/2008 | Environmental Assessment / FONSI | Marys Peak |
| Moon Creek Projects | 12/30/2008 | Finding of No Significant Impact | Tillamook |
| East Fork Nehalem Project | 12/12/2008 | Finding of No Significant Impact | Tillamook |
| East Fork Nehalem Project | 12/12/2008 | Decision Record | Tillamook |
| Upper and Lower Alsea River Fish Passage Restoration EA/FONSI | 11/20/2008 | Environmental Assessment / FONSI | Marys Peak |
| Moon Creek Projects | 11/05/2008 | Finding of No Significant Impact | Tillamook |
| Moon Creek Projects | 11/05/2008 | Environmental Assessment | Tillamook |
| Cherry Grove Timber Co. and G.F. Koennecke Right-Of-Way Agreements | 10/17/2008 | FONSI/Decision Record | Tillamook |
| Donald Z. Kessi North Fork Amendment to Right-of-Way Agreement S-23 | 10/17/2008 | FONSI/Decision Record | Marys Peak |
| Pisgah Progeny Salvage Project | 9/18/2008 | Decision Record | Tillamook |
| Pisgah Progeny Salvage Project | 9/18/2008 | Categorical Exclusion | Tillamook |
| Wildwood Footbridge Maintenance | 9/10/2008 | Decision Record | Cascades |
| Sandy River Basin Integrated Management Plan | 8/27/2008 | Environmental Assessment / FONSI | Cascades |
| East Fork Nehalem Project | 8/05/2008 | Environmental Assessment / FONSI | Tillamook |
| House Mountain Thinning Timber Sale | 7/30/2008 | Decision Rationale | Cascades |
| Evans Slide Stabilization | 7/23/2008 | Decision Record | Cascades |
| Maxfield Creek Density Management\Woodland Restoration\Upland Restoration\Aquatic Habitat Restoration | 7/06/2008 | Decision Rationale | Marys Peak |
| Marys Peak Resource Area (Alsea Area) Coarse Woody Debris/Snag Creation and Older Forest Legacy Tree Release | 7/01/2008 | FONSI/Decision Record | Marys Peak |
| Yaquina Head Outstanding Natural Area Contaminated Soil Project | 6/27/2008 | Environmental Assessment / FONSI | Tillamook |
| Evans Slide Stabilization | 6/25/2008 | Environmental Assessment | Cascades |
| Final Decision and Decision Rationale for Condenser Peak LSR Enhancement Project 1 | 6/25/2008 | Decision Record | Marys Peak |
| Condenser Peak LSR Enhancement Projects 2 and 3 | 6/18/2008 | Decision Rationale | Marys Peak |
| Wildwood Footbridge Maintenance | 6/18/2008 | Environmental Assessment | Cascades |
| 2008 Salem District Sample Tree Falling | 6/02/2008 | Categorical Exclusion | Cascades |
| Weyerhaeuser Right-Of-Way Agreement Amendment | 5/02/2008 | FONSI/Decision Record | Tillamook |
| Round Mountain Thinning Timber Sale | 4/30/2008 | Decision Rationale | Cascades |
| Everpower LLC Rights-Of-Way | 4/16/2008 | Categorical Exclusion | Tillamook |
| Westside Salem Integrated Non Native Plant Management Plan Final Decision | 4/11/2008 | Decision Rationale | Marys Peak |
| Starker Forests Inc. Amendment To Right-of-Way Agreement S-754 (Honey Grove Road) | 4/10/2008 | FONSI/Decision Record | Marys Peak |
| Cherry Grove Timber Co. and G.F. Koennecke Right-Of-Way Agreements | 4/09/2008 | FONSI/Decision Record | Tillamook |
| Maxfield Creek Large Woody Debris Placement on Private Lands/Meadow Restoration | 3/17/2008 | Decision Rationale | Marys Peak |
| Rickard Creek Timber Sale EA/FONSI | 3/11/2008 | Environmental Assessment / FONSI | Marys Peak |
| Roaring Creek Projects | 2/25/2008 | Decision Rationale | Tillamook |
| McFall/Potter Creek Density Management and Aquatic Habitat Restoration | 2/20/2008 | Decision Record | Marys Peak |
| McDowell Creek Thinning | 2/01/2008 | Decision Record | Cascades |
| Cold Springs Late Successional Reserve Enhancement | 1/30/2008 | Environmental Assessment / FONSI | Marys Peak |
| Elkhorn Fish Habitat Enhancement | 1/24/2008 | Documentation of NEPA Adequacy | Tillamook |
| Westside Salem Integrated Non-Native Plant Management Plan | 1/23/2008 | Environmental Assessment | Marys Peak |
| Integrated Pest Management EIS Record of Decision Clarification Walter Horning Tree Seed Orchard (Horning IPM ROD Clarification EA) | 1/14/2008 | Environmental Assessment | Cascades |
| Hull-Oakes Lumber Co RWA Amendment | 12/10/2007 | FONSI/Decision Record | Marys Peak |
| Maxfield Creek Large Woody Debris Placement on Private Lands/Meadow Restoration | 11/26/2007 | Finding of No Significant Impact | Marys Peak |
| McFall/Potter Creek Density Management and Aquatic Habitat Restoration | 11/20/2007 | FONSI/Decision Record | Marys Peak |
| Roaring Creek Projects | 11/05/2007 | Environmental Assessment | Tillamook |
| FY 2007/2008 Programmatic Timber Salvage Project | 10/25/2007 | Decision Rationale | Marys Peak |
| Yamaha LSR Enhancement/Aquatic Restoration Project EA/FONSI | 10/18/2007 | Environmental Assessment | Marys Peak |
| Mainline II Project 2 Decision Record | 10/13/2007 | Decision Record | Marys Peak |
| Mainline II Project 2 Decision Record | 10/12/2007 | Decision Record | Marys Peak |
| Little Sandy River Habitat Restoration | 9/26/2007 | Decision Record | Cascades |
| Gordon Creek Thinning | 9/25/2007 | Environmental Assessment | Cascades |
| Neuman Road Thinning DNA | 9/25/2007 | Documentation of NEPA Adequacy | Marys Peak |
| Table Rock Mainline Road Stabilization | 9/12/2007 | Decision Record | Cascades |
| Fiscal Year 2007/2008 Programmatic Timber Salvage EA Project | 8/23/2007 | Finding of No Significant Impact | Marys Peak |
| Marys Peak Watershed Restoration and Road Decommissioning Project 1 (Trash Rack Removal) | 8/22/2007 | Documentation of NEPA Adequacy | Marys Peak |
| Canyon Creek Salvage | 8/15/2007 | Decision Rationale | Marys Peak |
| Table Rock Mainline Road Stabilization | 8/09/2007 | Scoping Letter | Cascades |
| Wooden Lobster Restoration Project Final Decision | 8/07/2007 | Decision Record | Marys Peak |
| North Fork Alsea Access Road Hazard Tree Removal and Road Maintenance Project | 8/01/2007 | Decision Record | Marys Peak |
| Keel Mountain Density Management and Riparian Buffer Study, Final Decision and Decision Rationale | 8/01/2007 | Decision Rationale | Cascades |
| Final Decision and Decision Rationale for Parker Bear Late Successional Reserve Enhancement Project 1 | 8/01/2007 | Decision Record | Marys Peak |
| Little Sandy River Habitat Restoration | 7/25/2007 | Environmental Assessment | Cascades |
| Canyon Creek Salvage | 7/12/2007 | Finding of No Significant Impact | Marys Peak |
| Plum Creek North Fork Amendment To Right-of-Way Agreement S-347 | 6/06/2007 | FONSI/Decision Record | Marys Peak |
| North Fork Alsea Access Road Hazard Tree Removal and Road Maintenance Project | 6/06/2007 | Finding of No Significant Impact | Marys Peak |
| Middle Fork Fire Salvage | 5/29/2007 | Decision Rationale | Cascades |
| Marmot Road/West Creek Culvert Replacement | 5/22/2007 | FONSI/Decision Record | Cascades |
| Little Sandy Large Woody Debris Project | 5/04/2007 | Scoping Letter | Cascades |
| Keel Mountain Density Management and Riparian Buffer Study | 3/27/2007 | Environmental Assessment | Salem DO |
| Beeline/McDowell Creek Thinning | 3/20/2007 | Finding of No Significant Impact | Salem DO |
| Middle Fork Fire Salvage | 3/13/2007 | Environmental Assessment | Salem DO |
| Marmot Culvert | 3/12/2007 | Scoping Letter | Cascades |
| Cascades Resource Area Soil Rehabilitation | 3/06/2007 | Decision Record | Salem DO |
| Snake Creek Thinning Timber Sale Final Decision and Decision Rationale | 1/31/2007 | FONSI/Decision Record | Salem DO |
| Cascades Resource Area Soil Rehabilitation | 12/19/2006 | Finding of No Significant Impact | Cascades |
| Ag47 Projects | 7/27/2006 | Decision Rationale | Cascades |
| Cascades Resource Area Soil Rehabilitation | 5/01/2006 | Scoping Letter | Cascades |
| Hoag Pass | 4/20/2006 | Environmental Assessment | Tillamook |
| Baurer Rd/Unger Road Intersection Vegetation Management | 1/12/2006 | FONSI/Decision Record | Cascades |
| Butte Creek Timber Sale | 11/02/2005 | Decision Rationale | Cascades |
| Hillock EA Documents | 8/10/2005 | Decision Record | Cascades |
| Timber Sale Thinning | 7/20/2005 | Finding of No Significant Impact | Cascades |
| 2006 Timber Sale Thinning | 7/19/2005 | Environmental Assessment | Cascades |
| Ag47 Projects | 8/10/2004 | Finding of No Significant Impact | Cascades |
| Hillock Timber Sale | 5/19/2004 | Decision Rationale | Cascades |
| Hillock EA Documents | 5/19/2004 | Decision Record | Cascades |
Project Planning Updates
2013 Project Updates
- Winter 2013 (PDF)
- Spring 2013 (PDF)
2012 Project Updates
- Winter 2012 (PDF)
- Spring 2012 (PDF)
- Fall 2012 (PDF)
2011 Project Updates
- Winter 2011 (PDF)
- Spring 2011 (PDF)
- Summer 2011 (PDF)
- Fall 2011 (PDF)
2010 Project Updates
- April 2010 (PDF)
- June 2010 (PDF)
- Fall 2010 (PDF)
2009 Project Updates
- February 2009 (PDF)
- November 2009 (PDF)
2008 Project Updates
- March 2008 (PDF)
- June 2008 (PDF)
- September 2008 (PDF)
- December 2008 (PDF)
2007 Project Updates
- March 2007 (PDF)
- June 2007 (PDF)
- September 2007 (PDF)
- December 2007 (PDF)
2006 Project Updates
- March 2006 (PDF)
- June 2006 (PDF)
- September 2006 (PDF)
- December 2006 (PDF)
2005 Project Updates
- March 2005 (PDF)
- June 2005 (PDF)
- September 2005 (PDF)
- December 2005 (PDF)
Public Comments: Before including address, phone number, email-address, or any other personal identifying information in your comments, be advised that your entire comment, including personal identifying information, may be made publicly available at any time. While individuals may request that the BLM withhold personal identifying information from public view, the BLM cannot guarantee it will be able to do so. If you wish us to withhold your personal information you must state this prominently at the beginning of your comment. We will make all submissions from organizations or businesses available for public disclosure in their entirety.
Want to learn more about RMPs for Western Oregon?