U.S. DEPARTMENT OF THE INTERIOR

BUREAU OF LAND MANAGEMENT

Oregon / Washington

NEPA Project Details

RSS Icon

Little Wolf Quarry Expansion

Roseburg District

Documents in Project

Environmental Assessment EA# OR-104-07-04 Planning in Progress
This environmental assessment analyzes the environmental impacts associated with the Swiftwater Field Office's proposal to expand the Little Wolf Quarry in the Coast Range. The proposed expansion would occur in the Upper Umpqua Fifth-Field Watershed (Section 1; T. 25 S; R. 08 W.; W.M.).
Roseburg District Office
(541) 440-4930
n/a
Resource Area: Swiftwater
Program Areas: Minerals
Download: Little_Wolf_EA.pdf
Document Publish Date
Comment:
09/09/2008
09/09/2008 - 10/09/2008
Finding of No Significant Impact EA# OR104-07-04 Planning in Progress
This environmental assessment analyzes the environmental impacts associated with the Swiftwater Field Office's proposal to expand the Little Wolf Quarry in the Coast Range. The proposed expansion would occur in the Upper Umpqua Fifth-Field Watershed (Section 1; T. 25 S; R. 08 W.; W.M.).
Roseburg District Office
(541) 440-4930
n/a
Resource Area: Swiftwater
Program Areas: Minerals
Download: LittleWolfFONSI.pdf
Document Publish Date
09/09/2008
Finding of No Significant Impact EA# OR-104-07-05 Planning in Progress
The Little Wolf Quarry Expansion Project will occur on 3.3 acres of Bureau of Land Management (BLM) administered lands located in the Administratively Withdrawn and Late-Successional Management Area (LSMA) Land Use Allocations, located in the Upper Umpqua Fifth-Field Watershed (Section 1, T. 25 S., R. 08 W., Willamette Meridian), along the 24-8-36.0 road (also known as the Little Wolf road). Quarry expansion will cover occur on 3.3 acres, including 2.0 acres of new surface disturbance, and will remove approximately 400,000 cubic yards of rock. Blasting will occur multiple times (as needed) over the expected lifespan of the quarry which is anticipated to be 25 years. The expansion will extend the quarry floor southwest about 120 feet, past the existing main quarry headwall. The expansion will not cut back into the headwall or toward the old overburden to the north.
Roseburg District Office
(541) 440-4930
n/a
Resource Area: Swiftwater
Program Areas: Minerals
Download: LittleWlfQrryFN.pdf
Document Publish Date
09/27/2011
Decision Record EA #OR-104-07-05 Planning in Progress
Quarry expansion will cover occur on 3.3 acres, including 2.0 acres of new surface disturbance, and will remove approximately 400,000 cubic yards of rock. Blasting will occur multiple times (as needed) over the expected lifespan of the quarry which is anticipated to be 25 years. The expansion will extend the quarry floor southwest about 120 feet, past the existing main quarry headwall. The expansion will not cut back into the headwall or toward the old overburden to the north.
Roseburg District Office
(541) 440-4930
n/a
Resource Area: Swiftwater
Program Areas: Minerals
Download: LittleWlfQrryDR.pdf
Document Publish Date
Protest:
09/27/2011
09/27/2011 - 10/12/2011

Historic Roseburg Planning Documents / Current Roseburg Planning Documents