. .

U.S. DEPARTMENT OF THE INTERIOR

BUREAU OF LAND MANAGEMENT

Oregon / Washington

NEPA Project Details

RSS Icon

Sutherlin Creek Crossing Access

Roseburg District

Documents in Project

Environmental Assessment EA # DOI-BLM-OR-R040-2010-018-EA Planning in Progress
The Sutherlin Creek Crossing Access EA would authorize construction of a 135 foot road within the Connectivity land use allocation and in the Lower North Umpqua River Watershed. The proposed temporary road construction would be in NW1/4SW1/4, Section 19, T. 25 S., R. 4 W., Willamette Meridian.
Roseburg District Office
(541) 440-4930
n/a
Resource Area: Swiftwater
Program Areas: Transportation/Travel/Access
Download: SutherlinCkEA.pdf
Document Publish Date
Comment:
03/01/2011
03/01/2011 - 03/30/2011
Finding of No Significant Impact EA # DOI-BLM-OR-R040-2010-018-EA Planning in Progress
The Sutherlin Creek Crossing Access will occur in Fraser Canyon on Bureau of Land Management administered lands in the Lower North Umpqua River Watershed in NW1/4SW1/4, Section 19, T. 25 S., R. 4 W., Willamette Meridian. The project is within the Connectivity (approximately 0.1 acres) Land Use Allocation.
Roseburg District Office
(541) 440-4930
n/a
Resource Area: Swiftwater
Program Areas: Transportation/Travel/Access
Download: SutherlinCkFNSI.pdf
Document Publish Date
03/01/2011
Decision Record NEPA#: DOI-BLM-OR-R040-2010-018-EA Planning in Progress
This decision grants Douglas County's request for a three-year road-use permit and authorizes the construction of approximately 135 feet of new natural surface road with a 14 foot subgrade as described in the EA (pg. 6).
Roseburg District Office
(541) 440-4930
n/a
Resource Area: Swiftwater
Program Areas: Transportation/Travel/Access
Download: SutherlinCkDR.pdf
Document Publish Date
Protest:
06/14/2011
06/14/2011 - 07/14/2011
Finding of No Significant Impact NEPA#: DOI-BLM-OR-R040-2010-018-EA Planning in Progress
Road construction will include the removal of approximately 12 trees, 8 inches to 28 inches diameter at breast height (dbh) with a combined volume of 2.5 thousand board feet (2.5 MBF; EA, pg. 20). The road will be located in the Lower North Umpqua River Watershed in Section 19, T. 25 S., R. 4 W., Willamette Meridian.
Roseburg District Office
(541) 440-4930
n/a
Resource Area: Swiftwater
Program Areas: Transportation/Travel/Access
Download: SutherlinCkFNSI.pdf
Document Publish Date
06/14/2011

Historic Roseburg Planning Documents / Current Roseburg Planning Documents