Project: North Berry Creek Unilateral Right-of-Way and Road Construction Permit

Project Status: Project Under Implementation
Office Location: Roseburg
Resource Area: South River
NEPA #: OR-105-08-01  Decision Record
Document Publish Date: 2/05/2008
Summary: Swanson Group, LLC is authorized to construct an extension to BLM Road No. 29-7-7.0 for the purpose of accessing private timberlands, located to the east of BLM-managed lands, in the S˝SEĽ of Section 7, T. 29 S., R. 7 W., Willamette Meridian. The road construction will be temporary in nature. As described in the EA (p. 3), upon completion of logging projected to take place between June and October of 2008, the road will be decommissioned by ripping the road bed, constructing waterbars, and seeding and mulching the road bed with native grasses. The road extension will be blocked at its point of origin to prevent further vehicular use.
Public Protest/Appeal Start Date : 2/05/2008
Public Protest/Appeal End Date : 3/06/2008
Contact: Roseburg District Office
Contact Phone: (541) 440-4930
Program Areas: Lands/Realty
NEPA #: OR-105-08-01  Finding of No Significant Impact
Document Publish Date: 2/05/2008
Summary: The South River Field Office, Roseburg District, Bureau of Land Management (BLM), has completed the Environmental Assessment (EA) for the proposed North Berry Creek Unilateral Right-of-Way and Road Construction Permit. Two alternatives are analyzed in detail (EA, p. 3), consisting of Alternative One - No Action and Alternative Two - The Proposed Action. As the analysis was based on a request by Swanson Group, LLC, the proponent, no other alternatives were deemed necessary or appropriate to address their request.
Contact: Roseburg District Office
Contact Phone: (541) 440-4930
Program Areas: Lands/Realty
NEPA #: OR-105-08-01  Environmental Assessment
Document Publish Date: 1/07/2008
Summary: Swanson Group, LLC proposes construction of an extension to BLM Road No. 29-7-7.0 in Section 7, T. 29 S., R. 7 W. The road extension, approximately 675 feet in length, would be temporary and unsurfaced, and located primarily on a ridge top location. Approximately 440 feet of construction would be located on BLM-managed lands, as the proposed road route crosses back and forth at three locations along the property line between BLM lands and the Delores P. Loftin Trust lands that are to be logged. This action would be authorized under an O&C Right-of-Way Permit. BLM timber cut in association with the road construction would be purchased by Swanson Group, LLC through a negotiated timber sale. BLM-controlled roads to be used for timber hauling would include Road Nos. 29-7-7.0, 29-7-18.2 and 29-8-1.0.
Public Review Start Date : 1/08/2008
Public Review End Date : 1/23/2008
Contact: Roseburg District Office
Contact Phone: (541) 440-4930
Program Areas: Transportation/Travel/Access
NEPA #: OR-105-08-01  Finding of No Significant Impact
Document Publish Date: 1/07/2008
Summary: The South River Field Office, Roseburg District, Bureau of Land Management (BLM), has completed the Environmental Assessment (EA) for the proposed North Berry Creek Unilateral Right-of-Way and Road Construction Permit. Two alternatives are analyzed in detail (EA, p. 3), consisting of Alternative One - No Action and Alternative Two - The Proposed Action. As the analysis was based on a request by Swanson Group, LLC, the proponent, no other alternatives were deemed necessary or appropriate to address their request.
Contact: Roseburg District Office
Contact Phone: (541) 440-4930
Program Areas: Transportation/Travel/Access