. .

U.S. DEPARTMENT OF THE INTERIOR

BUREAU OF LAND MANAGEMENT

Oregon / Washington

NEPA Project Details

RSS Icon

DOl-BLM-OR-P040-2013-0008-CX Camp Creek Gabion Stabilization

Prineville

Documents in Project

Categorical Exclusion DOl-BLM-OR-P040-2013-0008-CX Planning Completed
The proposed action is to stabilize a failing gabion on Camp Creek. The gabion is planned for complete removal and restoration this summer, but is currently failing due to high flows the previous spring which resulted in undercutting of the structure. It is likely that this will result in a headcut degrading the system upstream from the gabion over this coming winter and spring prior to full restoration planned for this summer. In order to stabilize the gabion and prevent further degradation during upcoming high flows, gravel and rock, along with a layer of gee-textile fabric will be used to fill in areas of undercutting while armoring the eroding area and redirecting flow back over the top of the gabion.
Prineville District Office
(541) 416-6700
n/a
Resource Area: Prineville DO
Program Areas: Other
Download: pdo_cx_2013-0008_02272013.pdf
Document Publish Date
01/24/2013

Historic Prineville Planning Documents / Current Prineville Planning Documents