DOI-BLM-OR-P040-2011-0046-CX ODOT Emergency Kimberly-Long Creek Highway Rehab

Prineville

Documents in Project

Categorical Exclusion DOI-BLM-OR-P040-2011-0046-CX Planning in Progress
The proposed project would stabilize the roadway embankment ofthe Kimberly-Long Creek Highway. The embankment is actively being eroded by the North Fork (NF) John Day River, and is compounded by this year's flooding with roadway failure imminent. The proposed project would replace the eroded embankment using riprap and rock. This action would protect the roadway embankment from damage caused by high water events.
Prineville District Office
(541) 416-6700
n/a
Resource Area: Prineville DO
Program Areas: Other
Download: pdo_cx_2011_0046_080811.pdf
Document Publish Date
Comment:
08/09/2011
08/09/2011 - 08/15/2011