. .

U.S. DEPARTMENT OF THE INTERIOR

BUREAU OF LAND MANAGEMENT

Oregon / Washington

NEPA Project Details

RSS Icon

DOI-BLM-OR-P060-2011-0001-CX Frank's Creek Bridge Replacement

Prineville District

Documents in Project

Decision Record,Categorical Exclusion DOI-BLM-OR-P060-2011-0001-CX Planning Completed
The BLM Frank's Creek Bridge was built in 1965 and is in need of replacement due to deterioration from bug infestations, rot, and wear. The proposed action is to first, create a temporary crossing downstream of the Franks Creek Bridge. When the temporary crossing is installed, the current timber superstructure (girders and deck system) will be removed and a new pre-casted concrete superstructure will be placed on the existing concrete footings. Design of superstructure will be consistent with the Journey Through Time Scenic Byway designation of US Highway 26 and when possible, will provide habitat for bats by incorporating cracks and crevices 6 inches or greater in depth and 0.5 -1.25 inches wide into the design. Reference pictures with labeling for different parts of a bridge are at the end of this document.
Prineville District Office
(541) 416-6700
n/a
Resource Area: Prineville DO
Program Areas: Transportation/Travel/Access
Download: pdo-cxdr-2011-0001-110110.pdf
Document Publish Date
Comment:
11/01/2010
11/01/2010 - 11/30/2010

Historic Prineville Planning Documents / Current Prineville Planning Documents