. .

U.S. DEPARTMENT OF THE INTERIOR

BUREAU OF LAND MANAGEMENT

Oregon / Washington

NEPA Project Details

RSS Icon

DOI-BLM-ORP060-2010-0028-DNA Steelhead Falls Trail Maintenance

Prineville District

Documents in Project

Determination of NEPA Adequacy DOI-BLM-ORP060-2010-0028-DNA Planning Completed
The proposed actions are to 1) stabilize the trail tread in locations that are steep sloped, through rock placement and trail design; and 2) install approximately 75 feet of green plastic "construction" fencing to protect an eroding slope on the downhill side of the trail. The fence would limit user access points to a popular swimming, fishing and viewing area, while protecting a fragile slope long enough for native plants to re-vegetate the damaged area.
Prineville District Office
(541) 416-6700
n/a
Resource Area: Prineville DO
Program Areas: Recreation
Download: pdo_dna_10_0028_021210.pdf
Document Publish Date
02/05/2010

Historic Prineville Planning Documents / Current Prineville Planning Documents