NEPA Project Details
Project: DOI-BLM-ORP060-2010-0028-DNA Steelhead Falls Trail Maintenance | |
| Project Status: Planning Completed | |
| Office Location: Prineville | |
| Resource Area: Prineville DO | |
| NEPA #: DOI-BLM-ORP060-2010-0028-DNA Documentation of NEPA Adequacy | |
| Document Publish Date: 2/05/2010 | |
| Summary: The proposed actions are to 1) stabilize the trail tread in locations that are steep sloped, through rock placement and trail design; and 2) install approximately 75 feet of green plastic "construction" fencing to protect an eroding slope on the downhill side of the trail. The fence would limit user access points to a popular swimming, fishing and viewing area, while protecting a fragile slope long enough for native plants to re-vegetate the damaged area. | |
| Contact: Prineville District Office | |
| Contact Phone: (541) 416-6700 | |
| Program Areas: Recreation | |