. .

U.S. DEPARTMENT OF THE INTERIOR

BUREAU OF LAND MANAGEMENT

Oregon / Washington

NEPA Project Details

RSS Icon

Deer Willy Hazardous Fuels Reduction project

Medford

Documents in Project

Decision Record OR117-08-02 Planning Completed
The decision is to reduce hazardous fuels on approximately 4,571 acres of strategic roadside. Approximately 174 miles of existing road would be maintained to reduce erosion and sediment deposits into streams. Additional drainage structures would be installed on existing roads to improve drainage. Approximately 30 miles of road in the project area would be managed as designated firebreaks and 25 miles of road will be designated as escape routes. Thirteen water sources (pump chances) on established roads will be managed as permanent sources for fire suppression.
Medford District Office
(541) 618-2200
n/a
Resource Area: Grants Pass
Program Areas: Fire/Fuels
Download: deerwillydr.pdf
Document Publish Date
09/29/2008

Historic Medford Planning Documents / Current Medford Planning Documents