U.S. DEPARTMENT OF THE INTERIOR

BUREAU OF LAND MANAGEMENT

Oregon / Washington

NEPA Project Details

Return to NEPA Documents

Project: Rosenthal Water Right-of-Way Grant

Project Status: Planning Completed
Office Location: none
Resource Area: Medford DO
NEPA #: DOI-BLM-OR-M070-2010-0034-CX  Categorical Exclusion / Decision Record
Document Publish Date: 2/15/2012
Summary: The Categorical Exclusion/Decision Record authorizes the BLM to issue one Right-of-Way Grant (OR 66346) under the provisions at 43 CFR Part 2800, and Title V of P.L. 94-579; 90 Stat 2743, over BLM managed land to use, operate, and maintain a water facility consisting of an existing underground water pipeline and electric cable for domestic water use. The applicant has a buried 1-1/4 inch PVC pipe and electrical cable from a pump buried in the flood plain of the Rogue River to a holding tank on the applicant's property. Should the design of the water system change from an infiltration gallery system to an exposed intake system, continuation of the grant would be contingent on the compliance of the installation with current Oregon Department of Fish and Wildlife standards for fish passage and screening. All BLM decisions under 43 CFR Part 2800 remain in effect pending an appeal (See 43 CFR 2801.10) unless the Secretary rules otherwise. Rights-of-Way decisions that remain in effect pending an appeal are considered as "in full force and effective immediately" upon issuance of a decision. Thus, this decision is now in effect.
Public Review Start Date : 2/21/2012
Public Review End Date : 3/21/2012
Contact: Michelle Calvert
Contact Phone: (541) 471-6505
Program Areas: Transportation/Travel/Access