Alvord Desert Pipeline Well and Trough

Burns

Documents in Project

Categorical Exclusion DOI-BLM-OR-B060-2010-0030-CX Planning Completed
A 30' bottomless water trough to replace several small portable troughs located next to an existing reservoir would be constructed. In the past, water was pumped from the well into the reservoir. However, the reservoir's holding capacity was unreliable, so temporary troughs were utilized this past year. In addition a solar tower to power the water pump for the well would be installed. Water would be pumped from an existing well at the site into the trough. A small trench about 15 feet long would be dug in order to place a water pipe from the well to the trough.
Burns District Office
(541) 573-4400
n/a
Resource Area: Andrews
Program Areas: Range/Wild Horses
Download: AlvordPipelineTrough_CX.pdf
Document Publish Date
Comment:
05/07/2010
05/10/2010 - 05/25/2010

Historic Burns Planning Documents / Current Burns Planning Documents