Project: Cote Grade Quarry

Project Status: Planning in Progress
Office Location: none
Resource Area: Three Rivers
NEPA #: DOI-BLM-OR-B050-2011-0013-EA  Environmental Assessment / FONSI
Document Publish Date: 2/27/2013
Summary: The proposal is to drill, blast, crush, stockpile, and haul up to 250,000 cubic yards (cy) of material over a period of time that would include material needed for longer-term maintenance. The material would be used to widen the road surface of Double O Road from up to 20 feet to 28 feet and overlaying up to 6 to 8 inches of material source on an existing 32-mile stretch of Double O Road. The project would also provide material for the Moon Reservoir Road as well as other roads. During the timing of the Double O Road project, the crest of the road at Cote Grade may be lowered and realigned to the east to improve road safety.
Public Review Start Date : 2/27/2013
Public Review End Date : 3/29/2013
Contact: Burns District Office
Contact Phone: 541-573-4400
Program Areas: Lands/Realty, Minerals
NEPA #: DOI-BLM-OR-B050-2011-0030-CX  Categorical Exclusion / Decision Record
Document Publish Date: 5/17/2011
Summary: Perform Exploratory Drilling on both sides of the Cote Grade and within 400 feet of the cliff area. The purpose of the drilling is to determine if an appropriate quantity and quality of material are available for development of a Quarry to meet road design criteria.
Public Review Start Date : 5/17/2011
Public Review End Date : 6/18/2011
Contact: Burns District Office
Contact Phone: (541) 573-4400
Program Areas: Minerals