Vitals
Proposed Location: Armagosa Valley Area, Nye county Nevada
Electricity Production Capacity:
Phase I: 250MW
Phase II: 250 MW
Company: Abengoa Solar Inc.
Acreage: 5,217*
Status: Preparation phases towards a Draft Environmental Impact Statement (EIS)
Public Comment:
Scoping comment period ended 09/13/2010
Public comments on Draft EIS - pending
Electrical Transmission Connection: NV Energy & Valley Electric Association. 230kV transmission line to the Abengoa Switch Station