U.S. DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
Nevada
Newmont Mining Corporation's Proposed Long Canyon Mine
Interested Party Letter
(7/19/12)
Plan of Operations
Appendix A -
Claims Map
Figures
1 -
General Location Map
2 -
Existing Site Topography
3 -
Aerial Photograph
4 -
(1 of 3) Site Photographs
4 -
(2 of 3) Site Photographs
4 -
(3 of 3) Site Photographs
5 -
Surface and Mineral Ownership
6 -
Site Geology
7 -
General Site Plan Layout
8 -
Mill and Heap Leach Flow Sheet
9 -
Post-project Topography
10 -
Typical Haul Road Sections
11 -
Typical Access Road Sections
12 -
Office, Shop, Mill Site Project Layout
13 -
Tailings Facility Layout
14 -
Heap Leach Facility Layout
15 -
Power Pole Structure Design
16 -
Monitoring Locations
17 -
Wind Rose
18 -
Soils
19 -
Vegetation
20 -
Mule Deer Distribution
21 -
Elk Distribution
22 -
Pronghorn Distribution
23 -
Transportation Routes
24 -
Visual Resources
25 -
Socioeconomic Study Area
26 -
Lands with Wilderness Characteristics