Mount Hope Project Final EIS
A Record of Decision was signed for the Mount Hope Project on November 16, 2012. If you would like any additional information, please contact Gloria Tibbetts at (775) 635-4060
Table of Contents
Dear Reader Letter
Abstract
Volume 1 - EIS Cover Volume I
Acronyms and Abbreviations
Executive Summary
Chapter 1 - Introduction: Purpose of and Need for Action
Chapter 2 - Description of Alternatives, Including the Proposed Action
Chapter 3 - Affected Environment and Environmental Consequences
Sections 3.1-3.2 (3.1 Introduction; 3.2 Water Resources: Affected Environment)
Sections 3.2-3.3 (3.2 Water Resources - Water Quantity: Environmental Consequences; 3.3 Water Resources - Water Quality)
Volume 2 - EIS Cover Volume II
Chapter 3 - Affected Environment and Environmental Consequences
Section 3.4-3.6 (3.4 Geology and Minerals; 3.5 Paleontology; 3.6 Air and Atmospheric Values)
Section 3.7-3.8 (3.7 Visual Resources; 3.8 Soil Resource)
Section 3.9-3.11 (3.9 Vegetation Resources; 3.10 Noxious Weeds, Invasion & Nonnative Species; 3.11 Wetlands and Riparian Zones)
Section 3.12-3.13 (3.12 Livestock Grazing and Production; 3.13 Wild Horses)
Sections 3.14-3.16 (3.14 Land Use; 3.15 Recreation and Wilderness Study Areas; 3.16 Auditory Resources)
Section 3.17 (Socioeconomic Values)
Section 3.18-3.19 (3.18 Environmental Justice; 3.19 Hazardous Materials)
Sections 3.20-3.22 (3.20 Historic trails; 3.21 Cultural Resources; 3.22 Native American Traditional Values)
Section 3.23 (Wildlife and Fisheries Resources)
Section 3.24-3.27 (3.24 Transportation and Access; 3.25 Forest Products; 3.26 proposed Mitigation Measures Outside the BLM's Jurisdiction; 3.27 Relationship Between the Local Short-Term Uses of the Human Environment)
Chapter 4 - Cumulative Impacts and Irreversible/Irretrievable Commitment of Resources
Chapter 5 - Consulations, Coordination, and the List of Preparers for Preparation fo the EIS
Chapter 6 - References and Glossary
Chapter 7 - Index
Volume 3 - EIS Cover Volume III
Appendix A: Inconsistencies Between the Mount Hope Project and the Land Use Plans, Policies, and Controls of Eureka County
Appendix B: Eureka Moly, LLC Tailings Siting Evaluation
Appendix C: Eureka Moly, LLC Water Resources Monitoring Plan
Appendix D: Mount Hope Project Mitigation Summary Plan
Appendix E: Mount Hope Socioeconomic Supplemental Analysis
Appendix F: Native American Consulation Documentation
Appendix G: BLM Sensitive Species List
Appendix H: Draft EIS Public Comments and Responses