WPC 2'BPZ'Courier 10cpi#|dڟx6X@8;X@HP LaserJet IIIDHPLASIII.PRSx6X@8;,\, GX@#x6X@8;ڟX@#2Y7i Z#|dPrestige Elite 12cpi (J)Prestige Elite 12cpi Bold (J)HP LaserJet IIIDHPLASIII.PRSdp@sQ,\, G@2X,F`<tTddd,ldp@sQ@zuSddd,dp,`vQ>dw! PV軽d6d2ۚ{&L&L^X&er ;ese&er ;esggY[XPSQ32>dt6fu/>dsft! PV>d6d2ۚ{&L&L^X&eX` hp x (#%'0*,.8135@8:@Women(# xx@@` ` ( ( Water Closets` (hh*00, [________]x: [________](# xx@@` ` ( ( UrinalsH H "$& hh* .[________]@: [________](# xx@@` ` ( ( Lavatories&(hh*00, [________]x: [________](# xx@@` ` ( ( Mirror@H H "$&( 00,.[________] : [________](# xx@@h.( ( Recreation Maintenance Bays: [ .](#( xx@@i.( ( Fire Station Bays: [ .](#( xx@@j.( ( Other Miscellaneous Spaces: [ .](#( ! 0*(#(#( ( ԌC.1.9.0 Design Development: The design shall include the considerations discussed below.(# C.1.9.1 Exclusions: The design contract shall not include the design of furnishings which are not "builtin". However, this does not exclude the furniture and equipment layouts required.(# C.1.9.2 Studies and Investigations: Requirements for specific studies, surveys, or investigations are described elsewhere in this specification.(# C.1.9.3 Informational Statements: Some information is requested of the A/E Contractor to provide the Government with insight into the designer's logic and decisionmaking processes. These requests are for analyses, recommendations, evaluations, reasons, and similar quantifying and qualifying informational statements. It is assumed that these requests include only calculations and information available from the necessary thought processes of the design effort. Answers to these requests shall take the form of a concise written communication of the subject matter requested. The format may be a memo or letter.(# C.1.9.4 Design for Phase Construction: The project shall be designed so that it can be constructed in [__________] phases. The contract documents shall define and delineate the [__________] phases in such a way that a construction contract bid schedule can include each successive phase as an additive bid item. These phases are defined as follows:(# C.1.9.4.1 Phase 1: Shall include: xx@@` ` a. Basic Site Development.(#@! 0*(#(#( ( Ԍxx@@` ` b. Site utilities to support the finished project.(#@ xx@@` ` c. The complete outside building shell for all phases.(#@ xx@@` ` d. Interior finish of:(#@ xx@@` ` ( (  (1) [_________________________________________________________](# xx@@` ` ( (  (2) [_________________________________________________________] (#(#4(#(#xx@@` ` ( (  (3) [ ](#@ xx@@` ` e. Building mechanical and electrical as complete as practical to support the finished project.(# C.1.9.4.2Phase 2: Shall include: Finish of the interior facilities for [_______________________________________________________________.](# C.1.9.4.3Phase 3: Shall include: Finish of the interior facilities for [________________________________________________________________.](# C.1.9.4.4Phase 4: Shall include: [_________________________________________ _________________________________________________________________].(# C.1.10.0Design References: This specification includes references to various regulations, codes, standards, specifications, and other documents to govern the design. The edition cited shall be used unless a more recent edition is available. Where conflicts occur, the A/E Contractor shall be governed by the most appropriate of the provisions in question. Resolve conflicts with the Contracting Officer.(# C.1.10.1Codes and Regulations: The following codes and regulations shall govern the design of the project.(#! 0*(#(#( ( Ԍxx@@a.( ( State of [ , Department of Environmental Conservation] rules and regulations concerning development of sewer and water systems shall be strictly adhered to.(#( xx@@b.( ( ADP STANDARDS HANDBOOK (306 DM2), U.S. Department of the Interior.(#( xx@@c.( ( BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE (ACI 31883), American Concrete Institute.(#( xx@@d.( ( CALIFORNIA TITLE 24 ENERGY CODE, State of California.(#( xx@@e.( ( CODE FOR SAFETY TO LIFE FROM FIRE IN BUILDINGS AND STRUCTURES (NFPA 101 1991), National Fire Protection Association.(#( xx@@f.( ( CODE OF STANDARD PRACTICE FOR STEEL BUILDINGS AND BRIDGES, (S30286) American Institute of Steel Construction. (#( xx@@g.( ( ENERGY CONSERVATION (41 CFR 10120.107), July 1, 1990. (#( xx@@h.( ( FEDERAL AVIATION REGULATIONS, U.S. Department of Transportation, Federal Aviation Administration.(#( xx@@i.( ( FEDERAL ENERGY MANAGEMENT AND PLANNING PROGRAMS (10 CFR 436), January 1, 1990.(#( xx@@j.( ( LIGHTNING PROTECTION CODE, (NFPA 78 1989), National Fire Protection Association.(#( xx@@k.( ( NATIONAL ELECTRICAL CODE (NFPA 70 1990), National Fire Protection Association.(#( ! 0*(#(#( ( Ԍxx l.( ( NATIONAL FUEL GAS CODE (NFPA 54 1988), National Fire Protection Association.(#( xx m.( ( NATIONAL FIRE CODES, 1990 Edition, National Fire Protection Association.(#( xx@@n.( ( OCCUPATIONAL SAFETY AND HEALTH STANDARDS (29 CFR 1910.1 1910.15), July 1, 1990.(#( xx@@o.( ( SAFETY CODE FOR MECHANICAL REFRIGERATION (ANSI 1589), American National Standards Institute.(#( xx @@ p.( ( STANDARD FOR PORTABLE FIRE EXTINGUISHERS (NFPA 10 1990), National Fire Protection Association.(#( xx @@ q.( ( STANDARD FOR THE PROTECTION OF ELECTRONIC COMPUTER/DATA PROCESSING EQUIPMENT (NFPA 751989), National Fire Protection Association.(#( xx @@ r.( ( UNIFORM BUILDING CODE, 1991 Edition, International Conference of Building Officials.(#( xx @@ s.( ( UNIFORM FIRE CODE, 1991 Edition, International Conference of Building Officials.(#( xx @@ t.( ( UNIFORM MECHANICAL CODE, 1991 Edition, International Association of Plumbing and Mechanical Officials.(#( xx @@ u.( ( UNIFORM PLUMBING CODE, 1991 Edition, International Association of Plumbing and Mechanical Officials.(#( !0*(#(#( ( Ԍxx @@ v.( ( UNIFORM SOLAR ENERGY CODE, 1985 Edition, International Association of Plumbing and Mechanical Officials.(#( C.1.10.2Specifications/Standards/Technical Material: The following specifications, standards, or other referenced technical material shall govern the design of the project.(# xx@@a.( ( ABBREVIATIONS FOR USE ON DRAWINGS AND IN TEXT (ANSI Y1.172), American National Standards Institute.(#( xx@@b.( ( ACI DETAILING MANUAL (SP6688), American Concrete Institute.(#( xx@@c.( ( ALASKAN SNOW LOADS, 1973 Edition, Wayne Tobiasson and Robert Redfield, USACRREL, Hanover, New Hampshire. (#( xx@@d.( ( AMERICAN NATIONAL STANDARDS DIMENSIONING AND TOLERANCING (ANSI Y14.5 M82), American National Standards Institute.(#( xx@@e.( ( AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM).(#( xx@@f.( ( AMERICAN STANDARD FOR NURSERY STOCK, 1973 Edition, American Association of Nurserymen.(#( xx@@g.( ( A POLICY ON GEOMETRIC DESIGN OF HIGHWAYS AND STREETS, 1984 Edition, American Association of State Highway and Transportation Officials.(#( xx@@h.( ( DETAILING FOR STEEL CONSTRUCTION, (M 01383), American Institute of Steel Construction.(#( !0*(#(#( ( Ԍxx@@i.( ( ENERGY CONSERVATION IN NEW BUILDING DESIGN (ASHRAE 9080), American Society of Heating, Refrigeration, and AirConditioning Engineers, Inc.(#( xx@@j.( ( ENGINEERING FOR STEEL CONSTRUCTION A SOURCE BOOK ON CONNECTIONS (M 01484), American Institute of Steel Construction.(#( xx@@k.( ( FIRE RESISTANCE DIRECTORY, 1988, September 1976 Edition, Underwriters' Laboratories, (#( xx@@l.( ( FOOD SERVICE SANITATION MANUAL (FDA 282081, 1976), U.S. Department of Health and Human Services, Food and Drug Administration.(#( xx@@m.( ( GRAPHICAL SYMBOLS FOR HEATING, VENTILATING, AND AIR CONDITIONING (ANSI Y 32.2.449), American National Standards Institute.(#( xx@@n.( ( GRAPHICAL SYMBOLS FOR HEATPOWER APPARATUS (ANSI Y32.2.650), American National Standards Institute.(#( xx@@o.( ( GRAPHIC SYMBOLS FOR PLUMBING FIXTURES FOR DIAGRAMS USED IN ARCHITECTURE AND BUILDING CONSTRUCTION (ANSI Y32.477), American National Standards Institute.(#( xx@@p.( ( GRAPHIC SYMBOLS FOR ELECTRICAL WIRING AND LAYOUT DIAGRAMS USED IN ARCHITECTURE AND BUILDING CONSTRUCTION (ANSI Y 32.972), American National Standards Institute.(#( xx@@q.( ( HANDBOOK OF FUNDAMENTALS, 1989 Edition, American Society of Heating, Refrigeration, and AirConditioning Engineers, Inc.(#( !0*(#(#( ( Ԍxx@@r.( ( HANDBOOK OF HVAC SYSTEMS AND APPLICATIONS, 1987 Edition, American Society of Heating, Refrigeration, and AirConditioning Engineers, Inc.(#( xx@@s.( ( HELIPORT DESIGN GUIDE, (AC 150/5390 1B), U.S. Department of Transportation, Federal Aviation Administration.(#( xx@@t.( ( HELIPORT INSTALLATION (351DM2), U.S. Department of the Interior, Office of Aircraft Services.(#( xx@@u.( ( INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE).(#( xx@@v.( ( INSULATED CABLE ENGINEERS' ASSOCIATION, INC. (ICEA).(#( xx@@w.( ( LIGHTING HANDBOOK, Illuminating Engineering Society (IES).(#( xx@@x.( ( MANUAL OF PRACTICE, 1985 Edition, Construction Specifications Institute. (updated)(#( xx@@y.( ( MANUAL OF SEPTICTANK PRACTICE, U.S. Department of Health and Human Services, Public Health Service.(#( xx@@z.x( ( MANUAL OF STEEL CONSTRUCTION, ASD, Ninth Edition, American Institute of Steel Construction.(#( xx@@ aa.( ( MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES, 1978 Edition, U.S. Department of Transportation, Federal Highway Administration.(#( xx@@ ab.( ( MASTERFORMAT, 1988 Edition, Construction Specifications Institute.(#( !0*(#(#( ( Ԍxx@@ ac.x( ( METRIC GUIDE FOR FEDERAL CONSTRUCTION, First Edition, National Institute of Building Sciences.(#( xx@@ ad.( ( NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA). (#( ae.x( ( NOISE CONTROL AND COMPATIBILITY PLANNING FOR AIRPORTS (AC 150/50201), U.S. Department of Transportation, Federal Aviation Administration.(#( xx@@ af.( ( PCI ARCHITECTURAL PRECAST CONCRETE DRAFTING HANDBOOK, Prestressed Concrete Institute.(#( xx@@ ag.( ( QUARTERS (BLM Manual Section 1534), U.S. Department of the Interior, Bureau of Land Management.(#( xx@@ ah.( ( SAFETY (BLM Manual Section 1112), U.S. Department of the Interior, Bureau of Land Management.(#( xx@@ ai.( ( SHELTER DESIGN AND ANALYSIS FALLOUT RADIATION SHIELDING, (TR20, Volume 1, June 1976 Edition), Defense Civil Preparedness Agency.(#( xx@@ aj.( ( SHELTER DESIGN AND ANALYSIS PROTECTION FACTOR ESTIMATOR WITH INSTRUCTIONS (TR20, Volume 2, February 1976 Edition), Defense Civil Preparedness Agency.(#( xx@@ ak.( ( SHELTER ENVIRONMENTAL SUPPORT SYSTEMS (TR20, Volume 3, Appendix C "Ventilation Requirements for Fallout Shelters", May 1978 Edition), Defense Civil Preparedness Agency.(#( xx @@ al.( ( SPACE MANAGEMENT (BLM Manual Handbook 15351), U.S. Department of!0*(#(#( (  the Interior, Bureau of Land Management.(#( xx@@ am.( ( STANDARD FOR FALLOUT SHELTER (TR87, Sept. 1979 Edition), Federal Emergency Management Agency.(#( an.x( ( STANDARDIZED LIST OF PLANT NAMES, 1942 Edition, American Joint Committee on Horticultural Nomenclature.(#( ao.x( ( STANDARD SPECIFICATIONS FOR HIGHWAY BRIDGES, 1983 Edition, American Association of State Highway and Transportation Officials.(#( ap.x( ( STANDARD SYMBOLS FOR WELDING, BRAZING AND NONDESTRUCTIVE EXAMINATION (AWS A2.486), American Welding Society, Inc.(#( aq.x( ( STANDARD WELDING TERMS AND DEFINITIONS INCLUDING TERMS FOR BRAZING, SOLDERING THERMAL SPRAYING, AND THERMAL CUTTING (AWS A3.085), American Welding Society, Inc.(#( ar.x( ( SURFACE TEXTURE (ANSI B 46.185), American National Standards Institute.(#( as.x( ( SURFACE TEXTURE SYMBOLS (ANSI Y 14.3678), American National Standards Institute.(#( at.x( ( SYMBOLS FOR MECHANICAL AND ACOUSTICAL ELEMENTS AS USED IN SCHEMATIC DIAGRAMS (ANSI Y 32.1872), American National Standards Institute.(#( au.x( ( THE PARACHUTE MANUAL, 3rd Edition, 1984, Dan Poynter, Para!0*(#(#( (  Publishing.(#( av.x( ( TIMBER CONSTRUCTION MANUAL, 3rd Edition, 1985, American Institute of Timber Construction.(#( aw.x( ( UNDERWRITERS' LABORATORIES, INC. (UL).(#( xx @@ ax.( ( UNIFORM FEDERAL ACCESSIBILITY STANDARDS, 1984, Architectural and Transportation Barrier Compliance Board.(#(  ay.x( ( USER'S GUIDE FOR PREPARING BLM PROJECT SPECIFICATIONS, May 1977, U.S. Department of the Interior, Bureau of Land Management.(#( az.x( ( VENTILATION FOR ACCEPTABLE INDOOR AIR (ASHRAE 621981), American Society of Heating, Refrigeration, and AirConditioning Engineers, Inc.(#( C.1.11.0Design Review: This project will have [5] Government reviews: [Conceptual,] [Preliminary,] [Intermediate,] [Prefinal,] and [Final].(# C.1.11.1The Conceptual Review Meeting: Will be held on [___________________] [four] weeks following the notice to proceed, at [the Bureau of Land Management's _________________________________, ________________.] At the Conceptual Review, [_________________] alternative designs for possible development shall be presented for selection by the BLM.(# C.1.11.2The Preliminary Review Meeting: Will be held in the city where the Contractor's place of business is located on [________________,] [nine] weeks after the Conceptual Review. [Three] weeks prior to this review, on [_________________________,] one reproducible set of!0*(#(#( (  the work shall be received at both the BLM Service Center [and the ___________ [State Office] [Boise Interagency Fire Center].(# C.1.11.3The Intermediate Review Meeting: Will be held at [_______________] on [___________________________,] [eleven] weeks following the Preliminary Review. One reproducible set of the work shall be sent to both the BLM Service Center and the [________________] State Office at the addresses shown above to be received on [______________,] [three] weeks before the scheduled review.(# C.1.11.4The Prefinal Review Meeting: Will be held in [the city where the A/E Contractor's place of business is located,] on [___________________,] [six] weeks after the Intermediate Review. At this time, all of the work shall be completed. The Contractor shall furnish a final, detailed cost estimate, broken down into specific quantities, items, materials, unit costs, and total costs. One reproducible set of the work shall be mailed to the BLM's Service Center and the [______________] State Office at the address shown above for receipt on [_______________________,] [two] weeks prior to the scheduled review. Appropriate review comments will be provided to the A/E Contractor at the scheduled review meetings.(# C.1.11.5Final Review and Submittal: Within three weeks following the Prefinal Review meeting, the Contractor shall complete the modifications necessary to conform to the Government's Prefinal Review comments and submit the completed project to the BLM Service Center at the address shown above for receipt by [______________________________________].(# C.1.11.6Review Schedule: A detailed schedule of reviews, including dates, will be developed during Contract Negotiations.(#!0*(#(#( ( ԌC.1.11.7Review Meeting Attendees: The A/E Contractor shall insure the following attendance at the Review Meetings:(# xx@@a.( ( Project Architect (Project Manager).(#( xx@@b.( ( Project Design Architect.(#( xx@@c.( ( Civil Engineer in responsible charge.(#( xx@@d.( ( Electrical Engineer in responsible charge.(#( xx@@e.( ( Mechanical Engineer in responsible charge.(#( xx@@f.( ( Structural Engineer in responsible charge.(#( xx@@g.( ( Other design personnel as requested by the Contracting Officer.(#( C.1.12.0Communication During Design. Various methods of transmitting correspondence, drawings, and other contract documents may be used on this project, as cited below.(# C.1.12.1Intra City: Shall be by U.S. Postal Service first class domestic mail.(# C.1.12.2Distant: Shall be by a private company overnight mail delivery service or the U.S. Postal Service Postal Express delivery service.(# C.1.12.3BLM Addresses: Contract submittals, correspondence, and other required documents shall be sent to the following addresses:(# xx@@a.( ( BUREAU OF LAND MANAGEMENT [SC673](#x xx@@` ` ( ( DFC BUILDING 50 PO BOX 25047(#@ xx@@` ` ( ( DENVER, COLORADO 802250047(#@ xx@@b.( ( BUREAU OF LAND MANAGEMENT (#( xx@@` ` ( ( [________________________________](#@!0*(#(#( ( Ԍxx@@` ` ( ( [________________________________](#@ xx@@` ` ( ( [________________________________](#@ C.1.12.4Facsimile: May be used when rapid transmission via communication lines of timesensitive messages and information require immediate attention. Any typed or handwritten image, graphic or text, black and white or color, can be received by the BLM office shown above. The FAX number for the Service Center is [_________________]. The FAX number for the [____________________________________] is [_________________].(# C.1.13.0Construction Specifications: The following items shall be considered in the preparation of the Construction Contract specifications.(# C.1.13.1Guidelines for Specification Writing: The BLM "Users Guide for Preparing BLM Project Specifications" shall be furnished by the Government and followed in the preparation of the project specifications. The Government will furnish a copy of BLM Guide Specification Section 01010 Summary of Work as well as the written text of a "description of the work" for inclusion in the construction contract.(# C.1.13.2Specification Content and Format: Shall be according to the CSI Manual of Practice. Section titles and numbers shall conform to the CSI publication MASTERFORMAT. A [three] [four] part specification is required.(# C.1.13.3Brand Name or Equal: Manufacturers model and/or catalog numbers shall not be used. Products included in the design shall be specified by describing their salient characteristics and by specifying desired!0*(#(#( (  performance.(# C.1.13.4Typing Requirements: Specifications shall be typed using the "prestige elite 12" font. When word processing is used, WordPerfect, version 5.1 shall be utilized and the specification files shall be delivered to the Government on 3.5" 1.44 Mb diskettes with the hard copy printout required for Section [______].(# C.1.13.5Construction Contractor Requirements: As part of the contract specifications, include requirements that the Construction Contractor:(# xx@@a.( ( Provide at the construction site, a minimum of [100] square feet of office space for the exclusive use of the Project Inspector. The Government will furnish a copy of BLM Guide Specification Section 01506 Temporary Construction Facilities with additional detailed requirements for construction facilities.(#( xx@@b.` ` Pay for any retesting which must be done to obtain acceptable test results subsequent to test failures resulting from deficiencies in the work of the Construction Contractor.(#` xx@@c.` ` Arrange for borrow and waste of soil materials or vegetation, obtain all necessary permits, pay all fees for these operations, and receive approval of the Contracting Officer.(#` xx@@d.` ` Test all piping and hydronic systems including providing all test equipment and instruments as well as the water required to run the tests.(#` xx !0*(#(#( ( Ԍxx@@e.` ` Disinfect all potable water systems including furnishing chlorine for disinfections and certification as required by local authorities.(#` xx@@f.` ` Install plastic marking tape over buried utilities. If nonmetal pipe is used, the marking tape shall be detectable electronically.(#` xx@@g.` ` Include, as part of electrical/mechanical submittals, manufacturersupplied drawings showing the internal circuitry and working parts of all components incorporated into the various control systems. (#` xx@@h.` ` Provide tools and instruments required for final inspection.(#` xx@@i.` ` Prior to final acceptance, provide instruction to BLM personnel in the correct operation and maintenance of each system and its equipment. The instructor's expertise shall be appropriate to the particular system involved.(#` xx@@j.` ` Submit the names and qualifications of the proposed instructors for approval prior to giving training.(#` xx@@k.` ` Provide electrical/mechanical systems and controls supported by local commercial suppliers and capable of being maintained by local Government and/or commercial maintenance personnel.(#` xx@@l.` ` Erect a project sign. The Government will furnish the A/E Contractor with the BLM Standard drawing for project signs showing the requirements.(#` xx@@m.` ` Make necessary arrangements with [______________] for operations!0*(#(#( (  under the [_______________] regulations.(#` xx@@n.` ` Provide prompt notice to the government of asbestos or soil contamination by petroleum products so that the government can arrange for proper cleanup.(#` xx@@o.` ` Provide the services of an independent agency certified by the Associated Air Balance Council to test, balance and adjust the HVAC system. The CO must approve the selected agency, the test procedure and the test report.(#` xx@@p.` ` Provide record drawings on a set of fullsized prints, furnished by the CO. The Government will furnish a copy of BLM Guide Specification Section 01700 Contract Closeout with additional detailed requirements for record drawings.(#` xx@@q.` ` Provide Operation and Maintenance Data prepared by equipment suppliers for all the facilities and equipment installed or constructed as part of this project. The Government will furnish a copy of BLM Guide Specification Section 01700 Contract Closeout with additional detailed requirements for Operation and Maintenance Data.(#` xx@@r.` ` Post operating instructions and diagrams near the equipment installed as part of this project. The Government will furnish a copy of BLM Guide Specification Section 01700 Contract Closeout with additional detailed requirements for posted operating instructions and diagrams.(#` C.1.14.0Construction Drawings: All original drawings shall become the!0*(#(#( (  property of the Government upon completion and acceptance of the work.(# C.1.14.1Drafting Practice: Shall conform to accepted industry standards for the work shown, i.e., architectural, civil, structural, mechanical, and electrical. Where a question of intent or clarity exists, the government reserves the right to require the use of specific published reference works. All utilities shall be drawn at the same scale where they occupy the same general space.(# C.1.14.2Drawing Size: The reproducible drawing sheets shall be 22 inches x 34 inches or 30 inches x 42 inches. These dimensions are from trimline to trimline.(# C.1.14.3Drawing Media: Drawings shall be drafted in final form on material suitable for reproduction. Mylar [matted on one side,] [glossy on both sides,] having a minimum thickness of 0.3 mil. is the preferred drawing material.(# C.1.14.4Lettering and Line Construction: Shall be precise and legible. The minimum lettering size shall be not less than 1/8 inch high on the full size plot.(# C.1.14.5Symbols and Abbreviations: Shall be industry standards to assure ease in reading and interpretation of the drawings. The terms used shall be uniform throughout the drawings and specifications. The drawings shall show the symbols and abbreviations used and include an explanation of each symbol or abbreviation used on the drawing.(# C.1.14.6Dimensioning: Shall be clear, legible and consistent. Dimensions shall appear once and not be repeated unless needed for clarity.(#!0*(#(#( ( Ԍ C.1.14.7Scales: Drawings must show the scale to which they were originally drawn. Graphic and numerical scales are required.(# C.1.14.8Safety Slogan: Drawings must be marked with a safety slogan in the lower righthand quadrant of the drawing. A suggested slogan is "ALWAYS THINK SAFETY." Any other slogan must be approved by the Contracting Officer.(# C.1.14.9Title Block: Each drawing shall have a title block. The Government will approve the title block to be used on the drawing sheets. (# C.1.14.10Drawing Signatures: The signature and title of the individual in responsible charge of the design shown on each drawing prepared shall appear on the drawing. All drawings shall be stamped and signed to indicate the registration of the individual in responsible charge for the design shown on each drawing.(# C.1.14.11Drawing Numbers: Drawings must have a number assigned to them for reference and filing purposes. Drawing numbers are not required for the title sheet or the work location map.(# C.1.14.12Number Format: The drawing numbers consist of four parts: the Code of the State in which the work is to be performed (two digits), the office code of the District in which the work is to be performed (three digits), the CSI section number (five digits), and a number to place the drawing in proper sequence. The state and district codes will be furnished to the A/E Contractor by the Contracting Officer.(# C.1.14.13Coordination: Drawings shall be coordinated with each discipline!0*(#(#( (  involved in the design and the construction specifications.(# C.1.14.14Title Sheet: The drawings shall have a title sheet with an index of drawings, and with Area Reference Map and Area Maps. The Government will furnish a typical title sheet.(# C.1.14.15Automated Drafting: When automated drafting equipment and practices are utilized, the software package used shall be AutoCAD, version 11 as produced by Autodesk Inc. When automated drafting equipment and practices are utilized, the drawing files in AutoCAD ver.11 format shall be delivered to the Government on 3.5" 1.44 Mb diskettes or other approved media with the hardcopy printout required in Section [________].(# C.1.14.16Mechanical Drawings:(# xx@@a.( ( Mechanical Rooms: The Contractor shall prepare drawings to scale for equipment rooms, elevator machine rooms, and boiler rooms. Crosssections and elevations shall be provided. Drawing shall indicate provisions for access to and space for maintenance of mechanical equipment.(#( xx@@ b.X( ( Piping and Ducts: Shall be shown to scale, as nearly as possible in the location where they are to be installed. Drawings shall indicate the quantities of air and water to be hauled by ducts, pipes, fans, and pumps.(#( xx@@c.( ( Show locations of expansion joints, loops, and anchors on drawings. Acoustical treatment to prevent transmission of vibration and fluid noise shall be incorporated.(#( !0*(#(#( ( Ԍxx@@d.x( ( Show location of fire protection items such as fire pumps, pipe mains, valves, sprinkler heads, alarms, and similar equipment.(#( xx@@e.x( ( Enlarged scale plans shall be used to clarify possible conflicts or interferences with other work.(#( xx@@f.x( ( Nottoscale, schematic, oneline or pictoral drawings shall be used in conjunction with scaled drawings to clarify piping systems.(#( xx@@g.x( ( Equipment schedules shall indicate sizes, types, and general description of the equipment. Schedules shall be keyed to the drawings.(#( C.1.14.17Electrical Drawings:(# xx@@a.( ( When drawings are 1/4 inch scale and the building includes an electrical underfloor raceway or cellular metal floor system, two plans shall be provided for each floor. Normally, the first plan of each floor should show the complete lighting and power system. Normally, the second plan should show the underfloor raceway or cellular metal floor system and the communication system. Alternately, the power system may be shown on the second plan if greater clarity will result. 8:pp<(#p xx@@b.` ` When drawings are 1/4 inch scale and the building does not include an electrical underfloor raceway or cellular metal floor system, usually one plan of each floor will be adequate. The single plan should show the complete power and lighting system.(#` !0*(#(#( ( Ԍxx@@c.` ` When drawings are 1/8 inch scale, separate plans shall be provided for lighting system, power and communications systems, and underfloor duct systems (three drawings per floor.)(#` xx@@d.` ` Congested areas shall be resolved by enlarged scale part plans or additional normal scale floor plans. The floor plans shall call attention to all features which may affect construction or present an interference problem.(#` xx@@e.` ` The drawings shall define the specific requirements for each raceway, conductor, cable, outlet, wiring device, lighting fixture, switching arrangement, and equipment item, in detail.(#` xx@@f.` ` Electrical Symbols: Required to define system components shall be according to ANSI Y 32.9. These may be supplemented by additional symbols. All symbols shall be defined in a legend on the drawings.(#` xx@@g.` ` Raceways: Required for electrical systems shall be indicated in their entirety on each floor plan and shall include description of the associated conductors or cables. Raceways for communications systems and electrical branch circuits shall be indicated from outlet to outlet including switch legs, but the home run need not be shown all the way to the panelboard. Feeders shall be indicated in their entirety from points of origin to termination and shall include all intermediate takeoffs, pull boxes, also similar devices. Raceways shall be arranged so that they are not installed in elevator hoistways, duct spaces, and stairwells. A special fitting shall be provided for each raceway at a building expansion joint. These fittings shall be designated with special symbols. Supplementary demarcation lines or special notes shall be provided!0*(#(#( (  to define the areas of cellular metal floor or underfloor raceway systems served by each electrical and telephone closet.(#` xx@@h.` ` OneLine Diagrams: The drawings shall include an online diagram for each major electrical and communication system. Electrical schedules are required for each switchgear assembly, motor control center, and panelboard. These shall designate the system characteristics and the complete parameters for each protective device and motor controller, including the current limiting fuses, circuit designation, equipment serviced, and the connected kw load.(#` xx@@i.` ` Enlarged Scale Drawings: Shall be provided for each room housing switchgear assemblies or transformers.(#` xx@@j.` ` Detail Drawings: Shall be provided as described below. These details shall have a minimum scale of 1/4 inch = 1 ft 0 inch, but may be incorporated on other electrical drawings if space permits.(#` xx@@` ` 1. Front elevations for each control panel, motor control center, and switch gear assembly.(# xx@@` ` 2. Elevations for each type of incoming service entrance and shall include associated conduit bank and other significant details. These requirements shall be coordinated with the utility companies concerned.(# xx@@` ` 3. Enlarged plans, elevations, and details for each electrical closet.(# xx@@k.` ` Electrical Distribution System: As a minimum, the electrical! 0*(#(#( (  distribution system shall be designed according to the National Electrical Code (NEC). The design shall include requirements listed herein which may be more stringent than the NEC.(#` xx@@l.` ` Service Conduits: Shall be as follows:(#` xx@@` ` 1. Generally, conduits for service feeders shall be concrete encased type 40 PVC, run underground from the point of connection with the service transformer to the room or vault in which the main disconnecting equipment is located.(# xx@@` ` 2. Aboveground conduits for secondary services generally shall be steel. A minimum of one spare conduit shall be provided for each underground service.(# C.1.15.0Construction Cost Estimates: During the design of the project, the A/E Contractor shall submit cost estimates as part of the [Conceptual,] [Preliminary,] [Intermediate,] [Prefinal] and Final submittals. The Construction cost target furnished by the Government cannot be exceeded.(# C.1.15.1Design Detail: Each cost estimate shall be made to reflect the design detail available to the designer at the time of preparation. As the design progresses, cost estimates shall become more detailed, complete, and accurate. Cost estimates not reflecting the latest revisions will not be accepted. All cost estimates shall reflect a complete project to be constructed [in __________ phases] beginning in [_______].(# C.1.15.2Government Review: The government will review the cost estimates!!0*(#(#( (  submitted for reasonableness in the light of project cost targets which will be provided in a separate letter from the Contracting Officer. It shall be the A/E Contractor's responsibility to work toward and produce a final design which will, in the opinion of both parties, meet the cost targets. [All cost estimates shall reflect construction in [_______] phases, but shall identify the savings realized if the number of phases were reduced or eliminated.] The final cost estimate shall follow the format of the specifications by division and section.(# C.1.16.0Submittals:(# C.1.16.1Paper Size: All materials submitted, except drawings, shall be on 81/2 inch x 11 inch paper. Documents of more than 10 pages shall be bound in 3ring binders (except final specifications.)(# C.1.16.2Conceptual Design: The conceptual design submittal shall consist of [3] design alternatives. The design alternatives shall be sufficiently different in form and appearance to give the BLM substantially different options. [Each of the designs shall include a proposed landscape design.] [A cost estimate for each design shall be furnished.] [Each of the concepts presented shall include the material discussed below.] [Each concept shall include: a scale model in sufficient detail to illustrate shape and texture; a floor plan; and elevation views.](# xx@@a.x( ( Site Development, Landscape Architecture, and Site Utilities design shall include:(#( xx@@` ` ( ( 1. Preliminary Site Plan.(# !"0*(#(#( ( Ԍxx@@ ` ` ( ( 2. Design which depicts the functional relationships between the major parts of the project including:(# xx@@` ` ( (   (a)xH H "Siting of the proposed new building.(#H xx@@` ` ( (   (b)xH H "Proposed landscaped areas.(#H xx@@` ` ( (   (c)xH H "Proposed access and interior roads, walks, parking areas, aircraft parking ramp, and other paved areas and adjacent structures.(#H xx@@` ` ( (   (d)xH H "Proposed fence locations.(#H xx@@` ` ( (   (e)xH H "General grading and drainage scheme.(#H xx@@` ` ( (   (f)xH H "Proposed routing of utility systems.(#H xx@@` ` ( (   (g)xH H "A statement or [graphic depiction] to indicate that the A/E Contractor has conformed with the airspace criteria set forth by the Federal Aviation Administration and [ .](#H xx@@` ` ( (   (h)H H "A statement setting forth the adequacy or inadequacy of the existing sewage lift station to handle the increased load resulting from the construction of this project.(#H xx@@b.( ( Architectural design shall include: xx@@ ` ` ( ( 1. Sketches and/or drawings which depict each of the alternative!#0*(#(#( (  designs clearly defining the building, including floor plans, exterior elevations, and representative building crosssections.(# xx@@` ` ( ( 2. Sketches and/or drawings which clearly define space allocations required for mechanical and electrical systems, furnishings, and office equipment.(# xx@@ ` ` ( ( 3. Perspective sketches of the alternative designs indicating the visual form and esthetics of each design concept.(# xx@@` ` ( ( 4. A scale model of each of the 3 conceptual designs made indicating the elevations, from light cardboard/foam board.(# xx@@c.( ( Structural design shall include:(#( xx@@ ` ` ( ( 1. A series of sketches and/or scale drawings indicating the type of structural systems being proposed. The systems shall have been evaluated for feasibility by a structural engineer and found suitable for the application proposed.(# xx@@` ` ( ( 2. A narrative indicating the structural materials to be used.(# xx@@` ` ( ( 3. A discussion of soil conditions and foundation requirements. Be prepared to recommend subsurface exploration program within two weeks per subsection [ ].(# xx@@d.( ( Mechanical design shall include:(#( xx@@` ` ( ( 1. A narrative description of HVAC systems which satisfy design!$0*(#(#( (  requirements for each alternative design.(# xx@@` ` ( ( 2. A narrative of the major fire protection features proposed for the building.(# xx@@` ` ( ( 3. A narrative addressing the adequacy of the [______________] water supply and distribution system for fire protection now and in the future.(# xx@@` ` ( ( 4. A narrative addressing how energy and environmental requirements will be met.(# xx@@e.( ( Electrical design shall include:(#x xx@@` ` ( ( 1. Preliminary estimate of maximum demand load and service size.(# xx@@` ` ( ( 2. Preliminary estimate of number of telephone and data outlets needed.(# xx@@` ` ( ( 3. Evidence that the A/E Contractor has contacted the Contracting Officer and the following organizations to advise them of BLM's need for service and determine any special conditions for service.(# xx@@` ` ( (   (a)H H "[ ______________________________________________].(#H xx@@` ` ( (   (b)H H "[_____________________________________________________________________________________________].(#H !%0*(#(#( ( Ԍxx@@` ` ( (   (c)H H "The [__________________________________________] to determine requirements for the fire protection alarm system, including reporting requirements.(#H xx@@` ` ( (   (d)H H "The Federal Aviation Administration to determine any restrictions it may have with regard to electromagnetic transmissions at the proposed site and any requirements for obstruction lighting.(#H C.1.16.3Preliminary Design: The Preliminary design submittal shall reflect the intent of the approved Conceptual design. The submittals shall include contract drawings which are [25] % complete, a listing of the specifications planned for the project in CSI numeric order, and a cost estimate.(# xx@@a. x( ( Site Development, Landscape Architecture, and Site Utilities design shall include:(#( xx@@ ` ` ( ( 1. Presentation of the topographic site mapping required by [_______________] of this specification.(# xx@@ ` ` ( ( 2. Working drawings developed at a scale of 1 inch = 30 ft with one foot contour intervals. The drawings shall indicate horizontal and vertical relationships between the major components of the site. These drawings shall be coordinated between the design disciplines involved, the [___________________], and the [____________________]. At a minimum, the drawings shall include:(# xx@@` ` ( (   (a)H H "A site plan at a scale of 1 inch = 30 ft which includes!&0*(#(#( (  the exact siting of all structures and surface facilities such as roads, parking areas, aprons, walks, fences, signing and grading, and drainage design.(#H xx@@` ` ( (   (b)H H "A dimensioned plan with sufficient measurements to indicate the scaled relationships of the above mentioned items.(#H xx@@` ` ( (   (c)H H "A landscape plan showing the proposed surface treatments.(#H xx@@` ` ( (   (d)H H "A utility plan at a scale of 1 inch = 30 ft showing the routing of underground utilities and their relationship between surface structures and existing and proposed underground structures, manholes, [utilidors,] and transformers.(#H xx@@` ` ( (   (e)H H "Design details, profiles, and cross sections, sufficiently developed to support the concepts shown on the various site plans.(#H xx@@` ` ( (   (f)H H "Plans showing layouts of sewers (with invert elevations), gas lines, and water mains across the site and into the building.(#H xx@@b.x( ( Architectural design shall include:(#( xx@@` ` ( ( 1. Floor plans at 1/8 inch = 1 ft0 inch scale, that identify construction materials, dimensions, room names, and similar information.(# !'0*(#(#( ( Ԍxx@@` ` ( ( 2. A room finish schedule indicating proposed materials and colors, accompanied by material samples and color chips for the interior and exterior surfaces.(# xx@@` ` ( ( 3. A scale layout of each office space showing the arrangements of furniture and equipment listed on the government inventory furnished. Layout each group of offices in open space as a unit. (# xx@@` ` ( ( 4. Exterior building elevations, and building cross sections with vertical dimensions at 1/8 inch = 1 ft 0 inch scale minimum.(# xx@@` ` ( ( 5. Exterior wall sections that indicate all materials.(# xx@@` ` ( ( 6. Areas requiring special treatment indicated on the drawings in sufficient detail to allow a comprehensive critique.(# xx@@c.x( ( Structural design shall include:(#( xx@@` ` ( ( 1. The design loads to be used in each area of each structure to include dead, live, and lateral loads.(# xx@@` ` ( ( 2. Working drawings sufficiently developed to show the principal structural elements including:(# xx@@` ` ( (   (a)H H "Wall sections with dimensions indicating type of system and footing proposed.(#H xx@@` ` ( (   (b)H H "Floor, roof, and foundation plans with dimensions to define the overall geometrics of each system.(#H !(0*(#(#( ( Ԍxx@@` ` ( (   (c)H H "Identification of the principal structural material treatments.(#H xx@@` ` ( ( 3. An analysis of the foundation design including:(# xx@@` ` ( (   (a)H H "An evaluation of the subsurface conditions found in the exploration program as they relate to the design of pavements, slabs, and foundations of the project.(#H xx@@` ` ( (   (b)H H "Recommendations on the types of foundations to be incorporated into the design.(#H xx@@` ` ( (   (c)H H "The requirements of (a) and (b) above may be satisfied by the Geotechnic Report required in [____________________].(#H xx@@d.( ( Mechanical design shall include:(#( xx@@` ` ( ( 1. Energy and equipment economic analysis.(# xx@@` ` ( ( 2. Refrigerating block load and heating block load.(# xx@@` ` ( ( 3. Heat balance calculations.(# xx@@` ` ( ( 4. Recommended HVAC systems with reasons for selection, including economic analysis, and schematics of system/flow.(# xx@@` ` ( ( 5. Recommendation of the desirability of humidifying the general work area [____________________]. When humidification is recommended, indicate method and amount.(# !)0*(#(#( ( Ԍxx@@` ` ( ( 6. Recommended fire protection systems with reasons for their selection.(# xx@@` ` ( ( 7. Recommended plumbing system schematic layout.(# xx@@e.x( ( Electrical design shall include:(#( xx@@` ` ( ( 1. Cost comparisons of alternative systems studied plus a brief description of the electrical systems to be developed including design intent with respect to the following:(# xx@@` ` ( (   (a)H H "Electrical Distribution: Justification for voltage and type of system selected.(#H xx@@` ` ( (   (b)H H "Lighting: Type, voltage, wiring (hard vs plugin pigtails), "open area" spacing and mounting height, type of switching, glare control, and provisions for supplemental task lighting. Include cost justification for selections made.(#H xx@@` ` ( (   (c)H H "Openspace power and communication distribution: Type (underfloor ducts, power/communication poles, or flat conductor cable) and spacing. Include cost justification for selections made.(#H xx@@` ` ( ( 2. Site utility plan that includes the service connection point, service line routing, and type and location of exterior lighting. This plan should indicate that all utilities have been coordinated to avoid duplication. This is a restatement of the requirements of [__________].(# !*0*(#(#( ( Ԍxx@@` ` ( ( 3. Space allocation for transformers, switchboards, motor control centers, and telephone equipment.(# xx@@` ` ( ( 4. Lighting fixture layouts.(# xx@@` ` ( ( 5. Tentative single line diagram of electrical distribution system.(# xx@@` ` ( ( 6. Preliminary calculations for the electrical system including short circuit currents, and lighting intensities of typical areas.(# xx@@` ` ( ( 7. Location of engine headbolt heater outlets and associated panelboards.(# xx@@` ` ( ( 8. Computer work station locations.(# C.1.16.4Intermediate Design:(# xx@@a.( ( Intermediate design submittals shall include working drawings, copies of draft specifications and a cost estimate. At this time the contract documents shall be [65] % complete.(#( xx@@b.( ( The submittal shall indicate compliance with previous project guidance, reviews, approvals, prospectus requirements, and criteria. Drawings shall reflect continued coordination between design disciplines.(#( xx@@c.( ( Site Development, Landscape Architecture and Site Utilities design shall include:(#( !+0*(#(#( ( Ԍxx@@` ` ( ( 1.x Design details that satisfactorily show that recognized complexities have been detailed.(# xx@@` ` ( ( 2.x Working drawings that satisfactorily show coordination between disciplines has been done to avoid conflicts in concept and space utilization on the site.(# xx@@` ` ( ( 3.x Working drawings of onsite utility systems including necessary valves, transformers, manholes, hydrants, outdoor lighting, engine headbolt heater outlets, and other appurtenances to satisfactorily show that all specific problems have been addressed.(# xx@@D.( ( Architectural design shall include: xx@@` ` ( ( 1.x Working drawings that indicate satisfactory resolution of recognized problems. These drawings shall include plans, elevations, section, details, and schedules.(# xx@@` ` ( ( 2.x Working drawings that indicate that mechanical and electrical requirements have been coordinated to avoid conflicts in concept and space utilization.(# xx@@e.x( ( Structural design shall include:(#( xx@@` ` ( ( 1. Working drawings that show that recognized problems have been detailed and that the structural design has been coordinated with other disciplines. Major structural elements shall be designed and sized.(# !,0*(#(#( ( Ԍxx@@` ` ( ( 2. Calculations for completed to date structural systems and elements included in the project.(# xx@@f.x( ( Mechanical design shall include:(#( xx@@` ` ( ( 1. Bound calculations for the fire sprinkler system and smoke control system.(# xx@@` ` ( ( 2. Documents and correspondence to verify the coordination of the HVAC, plumbing systems, and fire protection systems with [ .](# xx@@` ` ( ( 3. Bound calculations for the HVAC system for all spaces including air handling and pump systems.(# xx@@` ` ( ( 4. Working drawings which include equipment locations, pipe and duct layouts, mechanical rooms, automatic controls, floor layouts, acoustical criteria, and fire protection system layout.(# xx@@` ` ( ( 5. Complete working drawings of the fire safety/smoke control systems and operating procedures.(# xx@@` ` ( ( 6. Diagrams showing sequences of operation and complete equipment schedules.(# xx@@` ` ( ( 7. [Onequarter inch] scale layouts of typical toilet rooms, mechanical equipment rooms, laboratories, and congested areas, with sizes indicated.(# !-0*(#(#( ( Ԍxx@@` ` ( ( 8. Typical riser and flow diagrams for plumbing services and utilities with sizes indicated.(# xx@@` ` ( ( 9. Bound calculations for water supply, storm drainage (roof) and waste pipe system with pipe sizes indicated for each system.(# xx@@g.x( ( Electrical design shall include:(#( xx@@` ` ( ( 1. Oneline diagrams of the electrical distribution, telephone, communications, data, and fire alarm systems.(# xx@@` ` ( ( 2. Floor plans of equipment rooms showing electrical equipment and all integral horsepower motors.(# xx@@` ` ( ( 3. Branch circuit layouts for typical areas including the proposed lighting control arrangements.(# xx@@` ` ( ( 4. Underfloor raceway system layouts, when applicable, with the related headers and details that indicate methods for terminating headers in the electrical and telephone closets.(# xx@@` ` ( ( 5. Schedules for switchgear, motor control centers, and panelboards.(# xx@@` ` ( ( 6. Calculations for the electrical systems as well as the lighting intensities.(# C.1.16.5Prefinal Design: The prefinal submittal shall include 100 percent complete construction contract documents which the A/E Contractor has reviewed and coordinated to achieve quality control consistent with!.0*(#(#( (  industry standards and compliance with the requirements of this specification. The documents shall include all of the drawings, specifications, cost estimates, calculations, studies, and reports, in their final form. All design contract specification requirements shall have been met. (# C.1.16.6Final Design: The final submittal shall include all documents in their final form, including all corrections and changes required by the Contracting Officer after review of the prefinal submittal. Include the following as a minimum:(# xx@@a.( ( A cover sheet with an index of drawings and project location and vicinity maps.(#( xx@@b.( ( Drawings developed in compliance with these specifications and which meet bidding and construction requirements. Each drawing shall bear the signature and seal of the registered Professional Engineer or Architect who is in responsible charge of the work depicted.(#( xx@@c.( ( Specifications on bond paper, sized 81/2 inch x 11 inch, suitable for copying with electrostatic duplicating equipment.(#( xx@@d.( ( Final updated cost estimate, studies, and calculations produced in the course of the design.(#( xx@@e.( ( Deliver the following physical items relating to the drawings and specifications:(#( xx@@` ` ( ( 1. One "original" set of mylar drawings.(# !/0*(#(#( ( Ԍxx@@` ` ( ( 2.@ One "original" set of the specifications (not bound).(# xx@@f.x( ( The above materials shall be delivered to the Service Center address.(#( C.1.17.0Contract Administration: Shall be according to this specification and any attached contract documents.(# C.1.17.1Coordination: The government, in addition to the specific submittal and review schedule, expects a continuing effort on the part of the A/E Contractor to coordinate the design of the project with the Contracting Officer. Requests for technical information from the [ ] or other Federal Government offices shall be coordinated through the Contracting Officer.(# C.1.17.2Governmentfurnished Items: Drawings, graphics, diagrams, charts, and other such data provided in or with these specifications are intended to provide information relative to the operation of the facility. These are not intended to restrict the A/E Contractor's creative and innovative talents as long as the "design philosophy" is subscribed to.(# xx@@a.x( ( Delivery: The government will provide the following as needed by the A/E Contractor:(#( xx@@` ` ( ( 1.@ Project cost targets.(# xx@@` ` ( ( 2.@ Schedule of A/E Contractor performance.(# !00*(#(#( ( Ԍxx@@` ` ( ( 3.@ Typical title sheet.(# xx@@` ` ( ( 4. Text of "Description of the Work" for specification Section 01010 Summary of Work.(# xx@@` ` ( ( 5. Site information from previous work at this location.(# xx@@` ` ( ( 6. List of furnishings to be accommodated in specific spaces.(# xx@@` ` ( ( 7. List of "Secure Rooms".(# xx@@` ` ( ( 8. BLM Standard Drawing No. 028462, Project Sign.(# xx@@` ` ( ( 9.@ User's Guide for Preparing BLM Project Specifications.(# xx@@ 10.@ BLM Guide Specification Section 01010 Summary of Work.(# xx@@` `  11. BLM Guide Specification Section 01200 Project Meetings.(# xx@@` `  12. BLM Guide Specification Section 01300 Submittals.(# xx@@` `  13. BLM Guide Specification Section 01365 Certificates of Conformance.(# xx@@` `  14. BLM Guide Specification Section 01410 Testing Laboratory Services.(# xx@@` `  15.@ BLM Guide Specification Section 01506 Temporary Construction Facilities.(# !10*(#(#( ( Ԍxx@@` `  16.@ BLM Guide Specification Section 01570 Traffic Regulations. (# xx@@` `  17.@ BLM Guide Specification Section 01700 Contract Closeout.(# xx@@` `  18. BLM Guide Specification Section 02650 Utility Line Marking.(# xx@@` `  19. BLM Guide Specification Section 02651 Testing of Piping Systems.(# xx@@ 20. BLM Guide Specification Section 02675 Disinfection of Water Distribution Systems.(# xx@@ 21.@ BLM Guide Specification Section 03310 Structural Concrete.(# xx@@` `  22. BLM Guide Specification Section 04220 Concrete Unit Masonry.(# xx@@` `  23. BLM Guide Specification Section 05119 Minor Structural Steel.(# xx@@` `  24. BLM Guide Specification Section 06112 Light Wooden Structure Framing.(# xx@@` `  25. BLM Guide Specification Section 07920 Sealants and Caulking.(# xx@@` `  26.@ BLM Guide Specification Section 08111 Standard Steel Doors and Frames.(# xx@@` `  27.@ BLM Guide Specification Section 09260 Gypsum Board Systems.(# xx@@` `  28.@ BLM Guide Specification Section 10522 Fire Extinguishers,!20*(#(#( (  Cabinets and Accessories.(# xx@@` `  29. BLM Guide Specification Section 11216 Water Well Pumps.(# xx@@` `  30. BLM Guide Specification Section 12511 Horizontal Louver Blinds.(# xx@@` `  31. BLM Guide Specification Section 13314 Water Meters. Systems.(# xx@@ 32. BLM Guide Specification Section 14241 Hydraulic Passenger Elevators.(# xx@@` `  33. BLM Guide Specification Section 15401 Plumbing Systems.(# xx@@` `  34. BLM Guide Specification Section 16160 Cabinets and Enclosures.(# xx@@ ` `  35. Photographs of existing buildings on the site.(# xx@@` `  36. A map of the existing utility system, as known.(# xx xx@@` `  37. Information relating to the existing lawn sprinkler system.(# xx@@` `  38. State and District codes for drawing numbers.(# C.1.17.3Incidental Services: The cost for the following services shall be included in this Contract:(# xx@@a.( ( Reproduction and/or transmittal of drawings, specifications, estimates, correspondence, reports, and related materials required to be submitted to the Contracting Officer.(#( xx@@b.( ( Office supplies, services, equipment, computers and other machines, as well as telephone and other wire services as may be necessary in the performance of the contract.(#( ) END OF SUBSECTION C1 'GENERAL PROJECT STATEMENT