WPC 2QBR Z Courierw Roman#|dOed6X@`7@HP LaserJet 4HPLAS4.PRS 4d6X@;\*"P@lr5ddd,Oed6X@`7@s4ddd,鑡d `7r5ddd,d6Nhez7H Hw+!-ZQ#S$SVL]ddddddddddddddddddddddddddddddddddddddddNEssEX`AT`````6=`:=`:AATT`BBs``uEssErkkAT`:"`soh`kss`t 4HPLAS4.PRS 4?f\  P6G;\*"P?P2$r 0CourierCourier Bold X` hp x (#%'0*,.8135@8:, P age,  s5  F ooter, B , E dit. Delete the "Project Name (ftr B)" text and replace  s5 it with the name of the project (bolded) . , until you arrive at the document text.(# D.The Guide Specifications are being reviewed and revised. Your technical comments on any guide spec would be greatly appreciated. Also, any specs that are written "from scratch" that would benefit others could be sent to either Dion Dishong or Lori Quayle, RS110.(#  s5  DRAWING DATA REQUIRED: Location and detail drawings as needed, including electrical schematics, wiring diagrams, and equipment list.(#  s4  REVISIONS OF THIS SECTION:  r5z  CSI format, editorial changes: 2/97 Metric: Technical Update: 2/97 POINT OF CONTACT: Dennis Grevel Phone: (303) 9876858o0*(( XM s4 #d `7#`x(#NUNIT HEATERS Project Name (ftr B)` (#T[2/97] .16903   b-SECTION 16903 -UNIT HEATERS PART 1: GENERAL 1.1SUMMARY A.Section Includes: [Furnishing] [and] [Installing] forced air electric unit heaters, plus integral safety and control devices.(# B.Related Sections:(# ************************************************** DELETE EITHER 01009 OR 01010. EITHER SECTION 01300 OR 01410 MUST BE USED WHEN 01010 IS USED. ************************************************** Summary of Work`(#MSection 01010 Submittals`(#MSection 01300 Contract Closeout`(#MSection 01700 1.2SUBMITTALS A.General: Submittals shall be according to [Section 01009 General Information and Requirements.][Section 01300 - Submittals.] [Section 01365 Certificates of Conformance.](# B.Manufacturer's Literature: Submit [ ] copies of the manufacturer's technical data on each type of unit heater to be furnished on this project.(# 1.3QUALITY ASSURANCE A.Labeling Requirements: Electric unit heaters shall be Underwriters Laboratories, Inc. (UL) listed and labeled. UL listing and labeling will not be required if it can be shown that heaters meet the requirements of another nationally recognized testing laboratory (NRTL).(#  PART 2: PRODUCTS 2.1MATERIALS A.General: Heaters shall be constructed of the manufacturer's standard materials, as listed in published product information; types and sizes shall be as indicated or as required for the installation.(# 2.2UNIT HEATERS A.Thermal Requirements: Each heater shall be capable of producing [ ] kW of heat at [ ] volts, [ ] phase. Each heater shall include a line voltage thermal limit switch with automatic reset to protect from overheating.(# B.Enclosure: Enclosure shall be die-formed steel with factory applied painted finish. Enclosure shall be mounted such that air flow is horizontal with adjustable discharge louvers to control air flow. Enclosure shall contain aluminum-finned, copper clad steel sheath heating elements and a completely enclosed fan motor.(# }&0*s's'ԌC.Control: Provide integral control transformer, low voltage wall thermostat and other control components necessary for operation. Thermostat adjustment range shall be at least 55 to 85 degrees F. Control voltage shall be 24 volts. Provide fan delay feature to energize heating elements before fan starts.(# D.Mounting: Provide mounting bracket attached to building framing. Bracket connection to unit heater shall be adjustable to allow aiming air flow in any horizontal direction.(#  PART 3: EXECUTION 3.1INSTALLATION A.General: Install heaters as indicated, complying with the manufacturer's written instructions, applicable requirements of codes and standards, and according to recognized industry practices.(# 3.2TRAINING OF GOVERNMENT EMPLOYEES A.Requirements: See Section 01700 Contract Closeout.(#  PART 4: MEASUREMENT AND PAYMENT ***************************************************** WHEN A "LUMP SUM" CONTRACT IS USED, DELETE THE TITLE PART 4: MEASUREMENT AND PAYMENT, AND BOTH ARTICLES FROM THIS SECTION. MEASUREMENT AND PAYMENT WILL BE ADDRESSED IN PART 4 OF SPECIFICATION SECTION 01010 - SUMMARY OF WORK. ***************************************************** 4.1METHOD OF MEASUREMENT A.Units: The work described in this section will not be measured for payment.(# 4.2BASIS OF PAYMENT A.Payment: No direct payment for the work described under this section will be made. Consideration for this item shall be included in the bid price for other items of the Contract.(# 0,END OF SECTION