WPC 2QBR Z Courierw Roman#|dOed6X@`7@HP LaserJet 4HPLAS4.PRS 4d6X@;\*"P@lr5ddd,Oed6X@`7@s4ddd,鑡d `7r5ddd,d6Nhez7H\*"P?P2 Zr 0 ddddddddddddddddddddddddddddddddddddddddNEssEX`AT`````6=`:=`:AATT`BBs``uEssErkkAT`:"`soh`kss`t 4HPLAS4.PRS 4?f\  P6G;\*"P?P2$r 0CourierCourier Bold X` hp x (#%'0*,.8135@8:, P age,  s5  F ooter, B , E dit. Delete the "Project Name (ftr B)" text and replace  s5 it with the name of the project (bolded) . , until you arrive at the document text.(# D.The Guide Specifications are being reviewed and revised. Your technical comments on any guide spec would be greatly appreciated. Also, any specs that are written "from scratch" that would benefit others could be sent to either Dion Dishong or Lori Quayle, RS110.(#  s5  DRAWING DATA REQUIRED: Location and detail drawings as needed.  s4,  REVISIONS OF THIS SECTION:  r5  CSI format, editorial changes: 2/97 Metric: Technical Update: 2/97 POINT OF CONTACT: Dennis Grevel Phone: (303) 98768580*(( _XM s4 #d `7#` (#HELECTRICAL SERVICE Project Name (ftr B)` (#T[2/97] .16305   b-SECTION 16305 h*ELECTRICAL SERVICE PART 1: GENERAL 1.1SUMMARY A.Section Includes: [Furnishing] [and] [installing] electrical service system components which will be used for electrical service distribution.(# B.Related Sections:(# ************************************************** DELETE EITHER 01009 OR 01010. EITHER SECTION 01300 OR 01410 MUST BE USED WHEN 01010 IS USED. ************************************************** Summary of Work`(#MSection 01010 Submittals`(#MSection 01300 Excavating, Backfilling and Compacting for Structures`(#MSection 02224 Trenching, Backfilling and Compacting`(#MSection 02229 Utility Line Marking`(#MSection 02897 PreservativeTreated Poles and Posts`(#MSection 06312 1.2SYSTEM DESCRIPTION A.General: [ .](# 1.3SUBMITTALS A.General: Submittals shall be according to [Section 01009 General Information and Requirements.] [Section 01300 Submittals.] [Section 01365 Certificates of Conformance.](# B.Manufacturer's Literature: Submit [ ] copies of the manufacturer's technical data for the following electrical service system components to be used on this project:(# 1.` ` Meter base.(#` 2.` ` Service disconnect.(#` 3.` ` Lightning arresters.(#` 4.` ` Guy strand, anchors, and rods.(#` 5.` ` Pole.(#` 1.4QUALITY ASSURANCE A.Labeling Requirements: Electric service system components shall be Underwriters Laboratories, Inc. (UL) listed and labeled. UL listing and labeling will not be required if it can be shown that electric service components meet the requirements of another nationally recognized testing laboratory (NRTL).(#  PART 2: PRODUCTS 2.1MATERIALS A.General: Electric service system components shall be constructed of the manufacturer's standard materials, as listed in published product information; types and sizes shall be as indicated or as required for the installation.(#}&0*s's'Ԍ2.2COMPONENTS ***************************************************** COMPLETE THE DESCRIPTION OF METER BASE. ***************************************************** A.Meter Base: Shall be rated [ ] amps, [ ] volts with [ ] terminals. Base shall be fabricated of code gauge, galvanized steel with a factory applied finish of grey enamel. Base shall be weatherproof and equipped with threaded conduit hub.(# B.Service Disconnect: Shall be [a separately enclosed safety switch according to Section 16441 - Disconnect Switches and Section 16412 - Fuses] [a separately enclosed circuit breaker according to Section 16411 - Circuit Breakers] [the main circuit breaker in panelboard].(# C.Service Ground: Shall be as follows:(# 1.` ` Grounding electrode shall be a 3/4-inch diameter by 10-foot long copperclad rod [and] [the water service main] [the wellhead steel casing].(#` 2.` ` Grounding electrode conductor shall be bare or green insulated copper conductor according to NEC Table 250-94.(#` 3.` ` Grounding connections and terminations shall be according to Section 16120 - Conductors and Cables.(#` D.Poles: Shall be according to Specification Section 06312 PreservativeTreated Poles and Posts.(# E.Guys: Shall be as follows:(# 1.` ` Guy strand shall be 7 strand, galvanized steel, sized as shown on the drawings.(#` 2.` ` Guy strand termination shall be three bolt clamp.(#` 3.` ` Guy strand guards shall be round, 8 feet long, galvanized steel painted yellow or rigid yellow plastic.(#` 4.` ` Pole top attachment hardware shall be a 3/4-inch diameter, angle type, forged thimble-eye through-bolt with lift plate on the guy side and a forged thimble-eye nut screwed on to the through bolt on the overhead feeder side.(#` F.Guy Anchors and Anchor Rods: Anchors shall be expanding, four-way fluke type. Anchor rods shall be 3/4-inch diameter by 7 feet long (minimum), galvanized steel with single eye.(# G.Lightning Arresters: Shall be as follows:(# 1.` ` For 120/240 V single phase 3-wire grounded systems and 120/208 V 3-phase 4-wire grounded wye systems, arresters shall be 3-wire units rated 175 V.(#` 2.` ` For 240 or 480 V 3-phase 3-wire delta systems and 277/480 V 3-phase 4-wire grounded wye systems, arresters shall be 4-wire units rated 650 V.(#` 3.` ` Arresters shall be in weatherproof, steel enclosure, with conductor entry through an integral 1/2 inch conduit nipple suitable for knock-out mounting on other enclosures.(#`  PART 3: EXECUTION 3.1PREPARATION A.Utility Company Approval: Service equipment shall meet the requirements of the utility company delivering electric service. Consult with the utility company to verify which components of the service system the utility company will provide. The Contractor shall}&0*s's' pay for costs which the utility company may impose for providing service components.(# ***************************************************** INSERT NAME, ADDRESSES, AND TELEPHONE NUMBER OF THE UTILITY COMPANIES. ***************************************************** B.Utility Company: [ .](# 3.2INSTALLATION A.General: Install electric service system components as indicated, complying with the manufacturer's written instructions, applicable requirements of codes and standards, and according to recognized industry practices.(# B.Meter Base: Unless otherwise required by the utility company, install the meter base so that the horizontal centerline of the meter is 5 feet above grade.(# C.Grounding: Shall be as follows:(# 1.` ` Drive ground rods full length(#` 2.` ` Where grounding conductors are exposed on wood poles, staple conductor to pole on 1 foot spacing.(#` 3.` ` Except where installed on wood poles, install the grounding conductors in conduit and bond conductor to conduit at each end.(#` D.Lightning Arresters: Install [one 175 V, 3-wire arrester] [two 175 V, 3-wire arresters across phases AB and BC] [one 650 V, 4-wire arrester] [one 650 V, 4-wire arrester across the three phases and one 175 V, 3-wire arrester across the grounded phase].(# ***************************************************** SELECT POLE LENGTH AND CORRESPONDING SETTING DEPTH. ***************************************************** E.Poles: Install poles as follows:(# 1.` ` Set pole to the following depths:(#`  Pole Length (ft) Setting Depth (ft) 20 4.0 25 5.0 30 5.5 35 6.0 40 6.0  2.` ` Thoroughly tamp the backfill for full depth of hole and mound excess fill against the pole.(#` 3.` ` Place anchors and guys in line with the strain and with the distance between anchor and pole as nearly equal as possible to the length of pole above ground. Set anchors so that the rod points directly at the guy attachment on the pole and at a depth that will result in 6 to 9 inches of rod above grade.(#` 4.` ` At the pole top, drill the hole for the thimble-eye through-bolt 12 inches below the top. On the guy side install a lift plate between the thimble-eye and the wood and attach it to the pole with lag screws. On the line side install a square washer (3 x 3 x 1/4 inch) rolled to fit the curvature of the pole. Install threaded hardware wrench tight.(#` 5.` ` Install guy guards over the lower 8 feet of guy strand.(#` %0*s's'ԌPART 4: MEASUREMENT AND PAYMENT ***************************************************** WHEN A "LUMP SUM" CONTRACT IS USED, DELETE THE TITLE PART 4: MEASUREMENT AND PAYMENT, AND BOTH ARTICLES FROM THIS SECTION. MEASUREMENT AND PAYMENT WILL BE ADDRESSED IN PART 4 OF SECTION 01010 SUMMARY OF WORK. ***************************************************** 4.1METHOD OF MEASUREMENT A.Units: The work described in this section will not be measured for payment.(# 4.2BASIS OF PAYMENT A.Payment: No direct payment for the work described under this section will be made. Consideration for this item shall be included in the bid price for other items of the Contract.(# ,END OF SECTION