WPC 2QBR ZCourierw Roman3|dOed6X@`7@HP LaserJet 4HPLAS4.PRS 4d6X@;\*"P@lr5ddd,Oed6X@`7@s4ddd,鑡d `7r5ddd,d6Nhez7H+ (b0l0V ⫚ '@0AA. ddddddddddddddddddddddddddddddddddddddddNEssEX`AT`````6=`:=`:AATT`BBs``uEssErkkAT`:"`soh`kss`CourierCourier BoldHPLAS4.PRS 4?f\  P6G;\*"P?P2W$Zr0CourierCourier BoldCourier Italic%'0*,.8135@8:, P age,  s5  F ooter, B , E dit. Delete the "Project Name (ftr B)" text and replace  s5 it with the name of the project (bolded) . , until you arrive at the document text.(# D.The Guide Specifications are being reviewed and revised. Your technical comments on any guide spec would be greatly appreciated. Also, any specs that are written "from scratch" that would benefit others could be sent to either Dion Dishong or Lori Quayle, RS110.(#  s5  DRAWING DATA REQUIRED: Location and detail drawings as needed.  s4,  REVISIONS OF THIS SECTION:  r5  CSI format, editorial changes: 2/97 Metric: Technical Update: 2/97 POINT OF CONTACT: Dennis Grevel Phone: (303) 98768580*(( oXM s4 #d `7#`(#?FORMED SHEET METAL RACEWAYS Project Name (ftr B)` (#T[2/97] .16139   b-SECTION 16139 &FORMED SHEET METAL RACEWAYS PART 1: GENERAL 1.1SUMMARY A.Section Includes: [Furnishing] [and] [installing] two and three piece raceways which are made of factory formed sheet metal and which are used for electrical branch circuits or communication cables. (# B.Related Sections:(# ************************************************** DELETE EITHER 01009 OR 01010. EITHER SECTION 01300 OR 01410 MUST BE USED WHEN 01010 IS USED. ************************************************** Summary of Work(#`(#MSection 01010 Submittals`(#MSection 01300 Acoustical Suspension Systems`(#MSection 09130 1.2SUBMITTALS A.General: Submittals shall be according to [Section 01009 General Information and Requirements.] [Section 01300 - Submittals.] [Section 01365 Certificates of Conformance.] (# B.Manufacturer's Literature: Submit [ ] copies of the manufacturer's technical data for the formed sheet metal raceways to be used on this project.(# 1.3QUALITY ASSURANCE A.Labeling Requirements: Formed sheet metal raceways shall be Underwriters Laboratories, Inc. (UL) listed and labeled. UL listing and labeling will not be required if it can be shown that formed sheet metal raceway meets the requirements of another nationally recognized testing laboratory (NRTL).(#  PART 2: PRODUCTS 2.1MATERIALS A.General: Formed sheet metal raceways and fittings shall be constructed of the manufacturer's standard materials, as listed in published product information; types and sizes shall be as indicated or as required for the installation.(# B.Material: Formed sheet metal raceways shall be made of corrosion-protected sheet steel.(# C.Size: Length and cross-sectional dimensions shall be as required. (# D.Finish: Shall be baked enamel over a corrosion protective base. Color shall be [as indicated] [ ].(# E.Outlet Devices: Shall be according to specification Section 16140 - Wiring Devices.(# }&0*s's'ԌF.Fittings: Fittings required shall be of the same type, style, and manufacture as raceway supplied.PART 3: EXECUTION(# 3.1INSTALLATION A.General: Install formed sheet metal raceways and fittings as indicated or as necessary, complying with the manufacturer's written instructions, applicable requirements of codes and standards, and according to recognized industry practices.(# B.Special Tools: Use manufacturer recommended tools for cutting and bending raceways.(# C.Raceway Capacity: Do not exceed the manufacturer's recommendations on the raceway's conductor capacity.(# D.Grounding: See Section 16062 - Secondary Grounding.(# E.Surface Raceways and Multioutlet Assemblies: Special requirements are:(# 1.` ` Wall-Mounted HVAC Diffusers: Unless otherwise indicated, when drawings show raceways on walls with wall-mounted HVAC air diffusers, coordinate raceway installation with Mechanical Contractor and install as follows:(#` ` ` a.@ @ Drill a 7/8-inch hole in each side of the HVAC diffuser housing in line with the raceways on each side of the diffuser.(#@ ` ` b.@ @ Terminate the ends of the raceways adjacent to the diffuser enclosures with raceway-to-conduit connection fittings and install them tight against the 7/8-inch holes.(#@ ` ` c.@ @ Inside HVAC enclosure - install a 1/2-inch, 90 degree angle, squeeze type, flexible metal conduit connector through each 7/8-inch hole and connect to raceway end fitting.(#@ ` ` d.@ @ Install 1/2-inch flexible conduit between 90 degree connectors. Run flexible conduit as close to the floor as possible.(#@ 2.` ` Floor HVAC Diffusers: Adjust the location of outlets, when necessary, so that none are installed in the length of raceway above the diffusers. Provide the required number of outlets by reducing the space between outlets on each side of the diffusers.(#` F.Office Power Poles: Special requirements are:(# 1.` ` Location: Power poles shown on the drawings are primarily to indicate approximate locations and the number required. Field verify exact locations prior to installation.(#` 2.` ` Flexible Conduit Connections: Above the ceiling install 1/2-inch flexible conduit, not less than 10 feet long, between the branch circuit outlet box in the rigid conduit system and the power feeding fitting at the upper end of the power pole. When the power pole encloses communication wires which are run in conduits above the ceiling, install an equal length of similarly connected flexible conduit for the communications wiring.(#` 3.` ` Attachment: Attach the upper end of power poles firmly to the suspended ceiling support members with attachment devices produced by the pole manufacturer for that purpose.(#` 4.` ` Cuts in Ceiling Panels: When power poles penetrate the ceiling, cut the ceiling panels to the exact dimensions of the pole cross sections so that there is no space between pole and panel when both are in place. Install a factory fabricated ceiling plate at the upper end of pole to conceal the ceiling penetration.(#` }&0*s's'ԌPART 4: MEASUREMENT AND PAYMENT ***************************************************** WHEN A "LUMP SUM" CONTRACT IS USED, DELETE THE TITLE PART 4: MEASUREMENT AND PAYMENT, AND BOTH ARTICLES FROM THIS SPECIFICATION SECTION. MEASUREMENT AND PAYMENT WILL BE ADDRESSED IN PART 4 OF SECTION 01010. ***************************************************** 4.1METHOD OF MEASUREMENT A.Units: The work described in this section will not be measured for payment.(# 4.2BASIS OF PAYMENT A.Payment: No direct payment for the work described under this section will be made. Consideration for this item shall be included in the bid price for other items of the Contract.(# 0,END OF SECTION