WPCR 2BTgW#|d Elite 10pt 12 pitch (D/J/M)|Lddd,#d\( @HP LaserJet Series IIHPLASEII.PRSd\( @,,,,06O2%D Ti WPrestige Elite 10pt 12 pitch (D/J/M)|Lddd,#d\( @HP LaserJet Series IIHPLASEII.PRSd\( @,,,,06O2 FHJP*#|d +* * * * * * * * REMOVE THIS OUTLINE GUIDE BEFORE PLACING THE SPECIFICATION SECTION IN THE CONTRACT ,* * * * * * * * 'O U T L I N E G U I D E 'DIVISION 15: MECHANICALă !SECTION 15074 - PERFORATED CLAY PIPE X` hp x (#%'X( hp x (#%'USE:XConstruction of pipeline. Unique job requirements may require specific coverage in the following specification sections:(# X A.Section 01009: General Information and Requirements(# X (Must be used when Section 01010 is not used.)(# X B.Section 01010: Summary of Work(# X (Do not use when Section 01009 is used.)(# X C.Section 01019: Government-Furnished Property(# X (When Governmentfurnished material or equipment is used, this section must be included.)(# X D.Section 01300: Submittals(# X (When Contractorfurnished materials are used, [either] this section [or Section 01265] must be included when SEction 01009 is not used.)(# X E.Section 01365: Certificates of Conformance(# X (When Contractorfurnished materials are used, [either] this section [or Section 01300] must be included when Section 01009 is not used.)(# X F.Section 01505: Mobilization(# X (Do not use when Section 01009 is used.)(# X G.Section 01506: Temporary Construction Facilities(# X (Do not use when Section 01009 is used.)(# FORMS REQUIRED: Add Work Data Sheet, location, and detail drawings as needed: REQUIRED SPEC MODIFICATIONS: -GENERAL NOTESă X X( hp x (#%'X( hp x (#%'A.Whenever entire articles, paragraphs or subparagraphs are not applicable, the articles, paragraphs or subparagraphs should be deleted; if necessary, reletter or renumber articles, paragraphs or subparagraphs.(# X B.THIS GUIDE IS NOT INTENDED AS A SUBSTITUTE FOR READING THE ENTIRE SECTION.(# h)Ԍ ,TECHNICAL NOTESă X A.1.01B: Select or add applicable specification sections. Do not list specification sections from Division 15.(# X B.4.01 and 4.02: When a "lump sum" Contract is used, delete the title PART 4: MEASUREMENT AND PAYMENT, and both articles from this section. Measurement and payment will be addressed in Part 4 of [Section 01009] [or] [Section 01010].(# X C.4.01A: When not a "lump sum" Contract, select applicable phrases; use the "no measurement" phrase when none of the Pay Items in this section are included in the Bid Schedule.(# X D.4.02A: When not a "lump sum" Contract, select applicable phrases; use the "no direct payment" phrase when none of the Pay Items in this section are included in the Bid Schedule.(# X E.When Governmentfurnished property is specified for Pay Items, the letter suffix GF will be added after the parenthesis of the item number.(# X( hp x (#%'@ X !=* * * * * * * * * * * * * * * @ =* POINT OF CONTACT * DATE OF LAST REVISION: 2/4/86*=* Vern Reeves (SC673) * WRITTEN BY: Vern Reeves$=* FTS 776-0129 * REVISED BY: Vern Reeves$=* COMM. (303) 236-0129 * APPROVED BY: R.E. Enger$=* * * * * * * * * * * * * * * 115074 h)Ԍ@ X@H X(( .15074 (DIVISION 15 SECTION 15074 MECHANICAL PERFORATED CLAY PIPE Rev. 2-86 PART 1: GENERAL 1.01 SUMMARY: A.@Section Includes: The work of this section consists of providing [and installing] perforated clay pipe.(#@ B.@Related Sections:(#@  @Trenching, Backfilling and Compacting 6XFSection 02229(#@ 1.02 QUALITY ASSURANCE: A.@Standards: Provide pipe in accordance with the requirements of ASTM C 700, Perforated Clay Pipe.(#@ 1.03 REFERENCES: A. American Society for Testing and Materials  @ASTM C 700H "Perforated Clay Pipe(#@ 1.04 SUBMITTALS: A.@Requirements: In accordance with Section 01300 - Submittals. Submit data required to identify the materials to be furnished under this section. Submittals shall include the following:(#@  @@H X@H X1.Shop Drawings: For fabrication, fittings, joints, and installation details. Furnish bill of materials with shop drawings.(#  @2.Data: Furnish Engineering data and manufacturer's descriptive literature.(# 1.05 DELIVERY, STORAGE, AND HANDLING: A.@Pipe and Fittings: Handle pipe and fittings carefully to insure delivery in a sound, undamaged condition.(#@ 1.06 PROJECT CONDITIONS: A.@Laying Pipe:(#@  @1.Do not lay pipe in water or when trenches or weather conditions are unsuitable for such work.(#  @2.When work is not in progress, securely close open ends of pipe.(#  'ԌXDIVISION 15 SECTION 15074 MECHANICAL PERFORATED CLAY PIPE Rev. 1085PART 2: PRODUCTS 2.01 PERFORATED CLAY PIPE: A.@Type: Extra heavy, meeting requirements of ASTM C 700.(#@ PART 3: EXECUTION 3.01 GENERAL: A.@Placement Details: Sizes as shown on drawings. Lay to the grades and lines shown in accordance with pipe manufacturer's specifications. Rest each section upon the pipe bed for full length of barrel with recesses excavated to accommodate bell or joints. Take up and re-lay any length that has had its line, grade, or joint disturbed after laying. Thoroughly clean pipe interiors of foreign matter before lowering into trench. Replace with new pipe any laid section of pipe found damaged or defective.(#@ B.@Excavation and Trenching: In accordance with Division 2.(#@ C.@Pipe Cutting: Cutting for closure or for other reasons shall be done neatly by methods which will not damage pipe.(#@ D.@Inspection: Inspect pipe before lowering into trench. Defective or damaged pipe will be rejected.(#@ E.@Laying: Lay pipe upgrade with spigot ends pointing in the direction of flow, each length true to line and grade, with perforations located below the horizontal axis.(#@ F.@Backfill: In accordance with Division 2. The initial backfill around and a minimum of 6 inches over the pipe shall be coarse, porous material such as gravel or crushed rock. The fill shall be graded with the largest material at the bottom of the trench as shown.(#@ PART 4: MEASUREMENT AND PAYMENT 4.01 METHOD OF MEASUREMENT: A.@Units: The work described in this section will not be measured for payment.(#@ 4.02 BASIS OF PAYMENT: A.@Payment: No direct payment for the work described under this section will be made. Contractor shall include consideration for this item in the bid price for other items of the Contract.(#@ ,END OF SECTION