WPC 2BJ>Courier#|d(Full-PE)CourierCourier BoldX@Line Draw 12cpi (Full-PE)CourierCourier BoldCourier Italic@\JbX@#d6X@`7Oe@#X` hp x (#%'0*,.8135@8:, P age,  s5?  F ooter, B , E dit. Delete the "Project Name (ftr B)" text and replace  s5 it with the name of the project (bolded) . , until you arrive at the document text.(# D.The Guide Specifications are being reviewed and revised. Your technical comments on any guide spec would be greatly appreciated. Also, any specs that are written "from scratch" that would benefit others could be sent to either Dion Dishong or Lori Quayle, RS110.(#  s5   DRAWING DATA REQUIRED: Show locations of items included above on the toilet room elevations 1:50 metric (1/4 inch) scale and dimension locations thereof. REVISIONS OF THIS SECTION:  r5  CSI format, editorial changes: 9/96 Metric: 9/96 Technical Update: 9/96 POINT OF CONTACT: Frank Ciesel Phone: (303) 2369502 Y0*(( pU s4 #d `7#` (#HTOILET ACCESSORIES Project Name (ftr B)` (#T[9/96] .10810   b-SECTION 10810 h*TOILET ACCESSORIES      PART 1: GENERAL 1.01 SUMMARY: A.Section Includes: Providing and installing toilet room accessories. (# ***************************************************** DELETE EITHER 01009 OR 01010. EITHER SECTION 01300 OR 01410 MUST BE USED WHEN 01010 IS USED. ***************************************************** B.Related Sections:(# General Information and Requirements(#`(#MSection 01009 Summary of Work(#`(#MSection 01010 Light Wooden Structures Framing(#`(#MSection 06112 Gypsum Board Systems(#`(#MSection 09260 Exterior and Interior Painting(#`(#MSection 09915 1.02 SUBMITTALS: A.General: Submittals shall be according to [Section 01009 General Information and Requirements.] [and] [Section 01300 Submittals.] [and] [Section 01365 Certificates of Conformance.](# B.Manufacturer's Literature: Submit [__] copies of the manufacturer's descriptive data with the items to be used on this project clearly marked. (# 1.03 QUALITY ASSURANCE: A.Labeling Requirements: Each mirror shall bear manufacturer's label identifying type, thickness and quality.(# B. Failure Criteria: Not limited to the following, during normal usage: 1. Removal or loosening from surfaces upon which installed. 2. Units containing movable parts becoming nonfunctional. 1.04 WARRANTY: A.Requirements: Furnish a written warranty from the manufacturer for the mirror against silver spoilage according to Section 01700 Contract Closeout. The warranty period shall extend for a minimum of [10] years.(# 1.05 SEQUENCING AND SCHEDULING: A.Necessary Construction: Adjacent surfaces shall be completely finished prior to installation. Necessary wall blocking shall be in place.(#  PART 2: PRODUCTS 2.01 MATERIALS: A.Glass Mirrors: Of size noted on Room Elevations.(#%0*s's'Ԍ1.` ` Glass: Unless noted otherwise on drawings, provide 6 mm (1/4 inch) polished plate glass, blue label, No. 1 quality, conforming to Commercial Standard CS 27.(#` 2.` ` Sealer: Mirror shall be hermetically sealed with a uniform coating of electro-plated copper protected by a coat of mineral oxide oil base paint.(#`  3.` ` Frame: 13 mm x 13 mm (1/2 inch x 1/2 inch) type 304 stainless steel channel frame, with bright-annealed finish. Frame shall have neatly mitered corners and a galvanized steel back plate. Concealed mounting for theft-proof installation.(#` B. Stainless Steel Mirrors: Of size noted on Room Elevations: 1.` ` Material: Constructed of minimum 16 gauge, type 304 stainless steel, hydrogen bright annealed, stretcher leveled, continuous tolerance, size as noted on Room Elevations.(#` 2.` ` Surface: No. 8 architectural grade finish imperfection-free polished and buffed, bright with excellent reflectivity and no haze.(#` 3.` ` Frame: 13 mm x 13 mm (1/2 inch x 1/2 inch) type 304 stainless steel channel frame, with bright-annealed finish. Frame shall have neatly mitered corners and a galvanized steel back plate. Concealed mounting for theft-proof installation.(#` C.Stainless Steel Shelves: 130 mm (5 inches) deep, 460 mm (18 inches wide surface-mounted, 18 gauge, 300 series satin-finish stainless steel with 13 mm (1/2 inch) thick edge and rounded corners. Shelf shall support 75 kg/m (50 pounds/linear foot).(# D.Towel Dispenser Combination Units: 22 gauge, type 304 stainless steel with No. 4 satin finish for 400 C-fold, 700 multi-fold, or 1,000 single fold paper towels, welded construction, seamless corners, burr-free edges. 25 mm (1inch) flange with 6 mm (1/4inch) return. Doors shall have double-panel construction with full length continuous hinges and tumbler locks. Towel dispenser shall have rolled edge. (# E.Tissue Dispensers: Shelf-type, double-roll dispenser with shelf and ashtray, raised apron at rear. Rolled front edge and return bend on sides. Spring clip shall secure ashtray. See Section 10161 - Metal Toilet Compartments for mounting locations.(# ***************************************************** DO NOT SELECT F.5. IF USING BACK AND SIDE BARS ONLY. ***************************************************** F.Grab Bars: Supply and install heavy duty grab bars in toilet compartments where shown on the drawings. Mount with vandal resistantstainless steel set screws with concealed [mounting plate][flange] for mounting on [concrete block][toilet enclosures]. Bars shall be as follows:(# 1.` ` Straight, 11/2inch OD, 18 gauge.(#` 2.` ` Type 304 stainless steel,[satin][knurled][peened] finish(#` 3.` ` Side bar minimum 1066 mm (42 inches).(#` 4.` ` Back bar minimum 914 mm (36 inches).(#` 5.` ` Combination minimum 914 mm x 1372 mm (36 inches x 54 inches) (#` 6.` ` Capable of withstanding [140][225] kg ([300][500] pound) vertical loads.(#` G.Towel Dispensers: Surface-mounted chrome finished towel dispenser, 500 multi-fold or 300 C-fold capacity, 280 x 384 x 102 mm (11 x 151/4 x 4 inches).(# %0*s's'ԌH.Napkin and Tampon Vendors: Recessed stainless steel units. Metal parts in coin mechanism set for quarters. Coins refused after last product is sold. Capacity 30 napkins and 27 tampons.(# I.Napkin Disposal Units:(# 1.` ` Recessed Mounted: Stainless steel with self-closing door and removable stainless steel receptacle with wet-strength paper liner.(#` 2.` ` Surface Mounted: Stainless steel with self-closing door and removable stainless steel receptacle with wet-strength paper liner.(#` J.Medicine Cabinet: Steel cabinet, 2 glass shelves, glass mirror on continuous hinged door.(# K.Exposed Screws: Oneway drive only.(# 2.02 FABRICATION: A. Shop Finishes: Metal shall be polished chrome or stainless steel.  PART 3: EXECUTION 3.01 EXAMINATION: A.Verification of Conditions: Verify that interior finishes in affected rooms have been applied and approved prior to installing equipment. Verify that necessary mounting materials are present in such quantity as to provide complete individual installations.(# 3.02 INSTALLATION: A.Glass Mirrors: Cover edges of mirror with masking or friction tape prior to insertion in frame. Optional frame and attachment method may be a continuous clip member at top and bottom, fastened to wall, engaging fins on back of frame.(# B.Shelves, Tissue Dispensers and Towel Dispensers: Mount with concealed theft-proof fasteners to wall at elevations above floor shown on Room Elevations.(# C.Grab Bars: Mount 860 mm (34 inches) to top from and parallel to floor on sides of [walls] [toilet enclosures] where shown on floor plans. (# 3.03 CLEANUP: A.Requirements: Equipment labels shall be removed as equipment is approved.(# ************************************************************** When a "lump sum" Contract is used, delete the title PART 4: MEASUREMENT AND PAYMENT, and both articles from this section. Measurement and payment will be addressed in Part 4 of Section 01010 Summary of Work. ************************************************************** PART 4: MEASUREMENT AND PAYMENT 4.01 METHOD OF MEASUREMENT: A.Units: The work described in this section will not be measured for payment.(# }&0*s's'Ԍ4.02 BASIS OF PAYMENT: A.Payment: No direct payment for the work described under this section will be made. Contractor shall include consideration for this item in the bid price for other items of the Contract.(# 0,END OF SECTION