WPC 2'BPZ'Courier 10cpi#|dڟx6X@8;X@HP LaserJet IIIDHPLASIII.PRSx6X@8;,\, GX@#x6X@8;ڟX@#2Y Zi:#|dHP LaserJet IIIDHPLASIII.PRSdp@sQ,\, G@Prestige Elite 12cpi (J)Prestige Elite 12cpi (Math8) (J)2 /X1F`*<tTddd,ldp@sQ@tTddd,dp@@@rfas&^ZYSQRWU ^^>Vts uE`3!tۋjr;u3ɡ:u;tt؃u.+* * * * * * * *  REMOVE THIS OUTLINE GUIDE BEFORE PLACING THE SPECIFICATION SECTION IN THE CONTRACT ,* * * * * * * * 'O U T L I N E G U I D E $DIVISION 6: WOOD AND PLASTICSă #SECTION 06116 - PLYWOOD WAINSCOT USE:XFurnishing and installing 4 ft - 0 inches or 8 ft - 0 inches high plywood wainscots where necessary to absorb shock or to provide a mounting surface for tools, etc. Unique job requirements may require specific coverage in the following specification sections: (# X` hp x (#%'0*,.8135@8:Section 07211(#@ 1.02 REFERENCES: A. American Plywood Association: @@@ 8L@ 8LAPA A30 !Plywood Sheathing for Walls and Roofs(#@ @@APA Y300 !Plywood Commercial/Industrial Construction Guide(#@ @@APA Y880 !Plywood: It's Handling, Storage and Installation(#@ B. International Conference of Building Officials (ICBO): @@UBC 1991  !Uniform Building Code (#@ C. National Bureau of Standards: @@NBS PS1 !Product Standard No. l(#@ 1.03 SUBMITTALS: XDIVISION 6 SECTION 06116 WOOD AND PLASTICS PLYWOOD WAINSCOT Rev. 992 A.@@General: Submittals shall be according to [Section 01009 General Information and Requirements.] [and] [Section 01300 Submittals.] [and] [Section 01365 Certificates of Conformance.](#@ B.@@Manufacturer's Literature: Submit [__] copies of the manufacturer's descriptive data for plywood wainscot to be used on this project.(#@ C.@@Shop Drawings: Submit [__] copies of shop [and erection] drawings for plywood wainscot to be used on this project. [Drawings shall be prepared by and bear the stamp of a [registered [____________] engineer] [licensed architect.] [Shop drawings shall show interior elevations. Drawings shall be [same] [larger] scale as the full size Contract Drawings.(#@ 1.04 QUALITY ASSURANCE: A.@@Labeling Requirements: Each panel of softwood shall be identified with the grade-trademark of the American Plywood Association.(#@ '0*((ԌB.@@Failure Criteria: Not limited to the following:(#@ @@@ 8L@ 8L1.Deflection from vertical plane or grain rise due to absorption of excess moisture.(# 1.05 DELIVERY, STORAGE, AND HANDLING: A.@@Delivery: When transporting plywood on open truckbeds, cover the stack with standard tarpaulins.(#@ @ 8L@ XB. Storage: @@1.@ X@ XStore on dry, level platform under weatherproof roof on 4 by 4's spaced 3 ft 0 inches oc at 90 degrees to length. When required to store outdoors, furnish plastic sheeting or tarpauline coverings, weight at top of stack, but leave sides and bottom open for air circulation. Store on blocks as above to prevent from touching wet or muddy ground. (# @@2.Anchor coverings at the top of the stack, but keep them open and away from the stack sides and bottom to assure good air circulation around the panels.(# @@3.Whenever humidity absorption may be expected, cut steel banding on plywood bundles to prevent edge damage.(# 1.06 SEQUENCING AND SCHEDULING: A.@@Coordination: Coordinate the provision of plywood wainscot with the progress of the work and the workmen necessary for its installation.(#@ PART 2: PRODUCTS 2.01 MATERIALS: A.@@Plywood: 48 inches x 96 inches C-D plugged INT-APA with exterior glue. Tongue-and-groove edges or use metal clips for edge support at metal buildings. Panel thickness: 1/2 inch or as shown on the drawings.(#@ B.@@Nails: Galvanized box, 6d common, annular, spiral-thread or T-nails for panels l/2 inch and less and 8d for greater thicknesses.(#@ @0*%% PART 3: EXECUTION 3.01 PREPARATION: A.@@Requirements: Ascertain that all framing members are according to the drawings and specifications, and in accordance with recommendations of the American Plywood Association. All framing members shall be straight and true to line, and on centers required to provide adequate bearing and nailing space.(#@ 3.02 INSTALLATION: A. Face Grain: Vertical. B.@@End Support, Stud Construction: Provide lumber blocking between studs. Panel edge joints shall occur over framing.(#@ C.@@End Support, Metal Buildings: Provide by use of screws through drilled and tapped holes in metal girts and base angles, or with self-tapping screws 24 inch oc approximate. Provide edge support by use of metal clips or tongue-and-groove panels. Space metal clips 24 inches oc.(#@ D. Wainscot: @@1.Install vertically and butt panel edges to a close but not tight fit. Allow l/l6 inch spacing at panel edges.(# 2. Let-in diagonal bracing of studs not required unless shown on the drawings.(# 3. Nail at 6 inches oc, along all panel edges and l2 inches oc at intermediate supports. Nail 3/8 inch from panel edge. Do not set nails.(# PART 4: MEASUREMENT AND PAYMENT 4.01 METHOD OF MEASUREMENT: A.@@Units: The work described in this section will not be measured for payment.(#@ 4.02 BASIS OF PAYMENT: A.@@Payment: No direct payment for the work described under this section will be made. Contractor shall include consideration for this item in the bid price for other items of the Contract.(#@ 0,END OF SECTION