WPC  2QBVROZ!|d 5f@8,?f\  P6G;?P"m+^8AM``AAA`k2A26``````````66kkkTwkAIwkkwwA6AX`AT`T`TA``66`6````AI6````T\&\hA2hXAAA2AAAAAAAA`6TTTTT}TwTwTwTwTA6A6A6A6``````````T`^```k`TTTTTTTywTwTwTwT````````A6A6A6A6kI`w6wMw6wAw6`q````AAAkIkIkIkIwQw6w6```````wTwTwT`w6`AkIw6``y``2``@#@WddddddddddddddddddddddddddddddddddddddddNEssEX`AT`````6=`:=`:AATT`BBs``uEssErkkAT`:"`soh`kss`HP LaserJet 4HPLAS4.PRS 4?f\  P6G;\*"P?P2rO$  X` hp x (#%'0*,.8135@8:, P age,  s5  F ooter, B , E dit. Delete the "Project Name (ftr B)" text and replace  s5K it with the name of the project (bolded) . , until you arrive at the document text.(# D.The Guide Specifications are being reviewed and revised. Your technical comments on any guide spec would be greatly appreciated. Also, any specs that are written "from scratch" that would benefit others could be sent to either Dion Dishong or Lori Quayle, RS110.(#  s5  DRAWING DATA REQUIRED: Building elevations and sections which show the placement of the vault. Sections scale shall be at least 1/2-inch.  s4z  REVISIONS OF THIS SECTION:  r5!  CSI format, editorial changes: 4/97 Metric: Technical Update: 7/91 POINT OF CONTACT: Ernie Parrott Phone: (303) 23695150*(( XM s4 #d `7#`8(#>FIBERGLASS UNDERGROUND VAULT Project Name (ftr B)` (#T[4/97] .02547   b-SECTION 02547 t%FIBERGLASS UNDERGROUND VAULT PART 1: GENERAL 1.1SUMMARY(# A.Section Includes: [Furnishing] [and] [Installing] [Installing with] [Governmentfurnished property] [Contractor-furnished and Government-furnished property] fiberglass underground vaults for recreation site sanitary facility buildings.(# B.Related Sections:(# ************************************************** DELETE EITHER 01009 OR 01010. EITHER SECTION 01330 OR 01458 MUST BE USED WHEN 01010 IS USED. ************************************************** Summary of Work(#`(#MSection 01010 Government-Furnished Property(#`(#MSection 01019 Submittal Procedures(#`(#MSection 01330 Certificates(#`(#MSection 01331 1.2SUBMITTALS(# A.General: Submittals shall be according to [Section 01330 - Submittal Procedures.] [and] [Section 01331 - Certificates.](# B.Manufacturer's Literature: Submit three copies of the manufacturer's descriptive data for the fiberglass underground vault to be used on this project.(# C.Shop Drawings: Submit three copies of shop drawings for the fiberglass underground vault. Drawings shall be the same scale as the full size contract drawings.(# D.Certificates of Conformance: Submit three copies of written certification from the supplier of the tanks to be used on this project that they conform to the requirements of this specification section.(# 1.3QUALITY ASSURANCE(# A.Failure Criteria: Not limited to the following:(# 1.` ` Evidence of leakage.(#` 1.4DELIVERY, STORAGE, AND HANDLING(# A.Storage: Store units on top or bottom surfaces, not on sides, in an area remote from earth-moving operations until ready for installation.(#  PART 2: PRODUCTS 2.1MATERIALS(# A.Vault: Shall be fabricated from fiberglass reinforced plastic having the following characteristics:(# 1.` ` Tensile strength 13,000 psi minimum.(#` 2.` ` Flexural strength 20,000 psi minimum.(#` }&0*s's'Ԍ3.` ` Compressive strength 24,000 psi minimum.(#` 2.2FABRICATION(# A.Vault: Shall be seamless, constructed of 1/4 inch average thickness fiberglass reinforced plastic consisting of approximately 40% fiberglass and 60% isophthalic polyester resin. Vault interior shall receive a smooth 12-15 mil thickness isophthalic gel coat, colored black.(#  PART 3: EXECUTION 3.1EXAMINATION(# A.Verification of Conditions: Prior to positioning vaults, verify the excavation and bed elevation.(# 3.2PREPARATION(# A.Project Readiness: The excavations shall be sufficiently large enough to accommodate the vaults. Four inches of loose fill dirt shall be added to the bottom of the pits to equalize loading from the vault.(# 3.3INSTALLATION(# A.Excavation and Backfill: Excavation and backfill operations shall be according to Section 02224 - Excavation, Backfilling and Compacting for Structures. Fill the vault with water as the fill is placed to equalize interior and exterior vault loading characteristics. Upon completion of the backfill operation, the water shall then be pumped out.(# B.Placement: Use hoisting equipment and ropes to raise, swing, and lower vaults into their pits.(#  PART 4: MEASUREMENT AND PAYMENT 4.1METHOD OF MEASUREMENT(# ***************************************************** WHEN A "LUMP SUM" CONTRACT IS USED, DELETE THE TITLE PART 4: MEASUREMENT AND PAYMENT, AND BOTH ARTICLES FROM THIS SECTION. MEASUREMENT AND PAYMENT WILL BE ADDRESSED IN PART 4 OF SECTION 01010. WHEN NOT A "LUMP SUM" CONTRACT, SELECT APPLICABLE PHRASES; USE THE "NO MEASUREMENT" PHRASE WHEN NONE OF THE PAY ITEMS IN THIS SECTION ARE INCLUDED IN THE BID SCHEDULE. ***************************************************** A.Units: The work described in this section will [not be measured for payment.] [be measured and paid for] [on a lump sum basis.] [per each vault.](# 4.2BASIS OF PAYMENT(# ***************************************************** WHEN NOT A "LUMP SUM" CONTRACT, SELECT APPLICABLE PHRASES; USE THE "NO DIRECT PAYMENT" PHRASE WHEN NONE OF THE PAY ITEMS IN THIS SECTION ARE INCLUDED IN THE BID SCHEDULE. WHEN NOT A "LUMP SUM" CONTRACT AND PAYMENT IS TO BE MADE UNDER THIS SECTION, SELECT APPLICABLE PAY ITEMS. DO NOT CHANGE PAY ITEM NUMBER. WHEN%0*s's' GOVERNMENT-FURNISHED PROPERTY IS SPECIFIED FOR PAY ITEMS, THE LETTER SUFFIX GF WILL BE ADDED AFTER THE PARENTHESIS OF THE ITEM NUMBER. ***************************************************** A.Payment: [No direct payment for the work described under this section will be made. Consideration for this item shall be included in the bid price for other items of the Contract.] [Prices and payment will be full compensation for the work described in this section. Payment will be made under:](# Pay Item@ @  !&+Pay Unit(# 02547(01) Fiberglass Underground Vault(#p (#RLump Sum 02547(02) Fiberglass Underground Vault(#p!(#VEach 0,END OF SECTIONp 0*s's' ,WORK DATA SHEET V2for T SECTION 02547 - FIBERGLASS UNDERGROUND VAULT 1.Number of tanks required: __________________________________________(#  r5 2.Top Inside Diameter D1:   ft   inches(# 3.Horizontal Lip:   inches around the circumference(# 4.Capacity of tank:   gal(# Note: When several tank projects are included, the tabular format may be more appropriate. (06/11/90)