WPC< 2QB$R ZCourierw RomanCourierCourier BoldCourier Italic@`7@HP LaserJet 4HPLAS4.PRS 4dp@sQ\*"P@wA6AX`AT`T`TA``66`6````AI6````T\&\hA2hXAAA2AAAAAAAA`6TTTTT}TwTwTwTwTA6A6A6A6``````````T`^```k`TTTTTTTywTwTwTwT````````A6A6A6A6kI`w6wMw6wAw6`q````AAAkIkIkIkIwQw6w6```````wTwTwT`w6`AkIw6``y``2``@#@WddddddddddddddddddddddddddddddddddddddddNEssEX`AT`````6=`:=`:AATT`BBs``uEssErkkAT`:"`soh`kss`!|dHPLAS4.PRS 4?f\  P6G;\*"P?P2rVCourierCourier Bold X` hp x (#%'0*,.8135@8:, P age,  s54  F ooter, B , E dit. Delete the "Project Name (ftr B)" text and replace  s5 it with the name of the project (bolded) . , until you arrive at the document text.(# D.The Guide Specifications are being reviewed and revised. Your technical comments on any guide spec would be greatly appreciated. Also, any specs that are written "from scratch" that would benefit others could be sent to either Dion Dishong or Lori Quayle, RS110.(#  s5  DRAWING DATA REQUIRED: Use the following standard drawings as appropriate; add Work Data Sheet, location, and detail drawings as needed: A.Drawing No. 02722-1: Culvert Summary(# B.Drawing No. 02722-2: Culvert Data(# C.Drawing No. 02722-3: Drop Inlets(# D.Drawing No. 02722-4: Concrete Drop Inlet, Type-D(# E.Drawing No. 02722-5: Standard Metal End Sections(# F.Drawing No. 02722-6: Corrugated Metal Pipe Data(# G.Drawing No. 02722-7: Standard Reinforced Concrete Pipe Bedding!!VDetails and Fill-Class Tables(#  s4#  REVISIONS OF THIS SECTION:  r5$  CSI format, editorial changes: 4/97 Metric: Technical Update: 10/91 POINT OF CONTACT: Joe Kuka Phone: (303) 2369512&0*((  XM s4 #d `7#`@(#PEARTH DAMS Project Name (ftr B)` (#T[4/97] .02332   b-SECTION 02332 .EARTH DAMS PART 1: GENERAL 1.1SUMMARY(# A.Section Includes: Clearing, grubbing, core trenching, excavation, and embankment development for construction of major homogeneous earth dams. The dams shall be constructed in compliance with the specification sections included in the Contract.(# B.Related Sections:(# ************************************************** DELETE EITHER 01009 OR 01010. EITHER SECTION 01330 OR 01458 MUST BE USED WHEN 01010 IS USED. ************************************************** Summary of Work(#`(#MSection 01010 Government-Furnished Property(#`(#MSection 01019 Submittal Procedures(#`(#MSection 01330 Certificates(#`(#MSection 01331 Minor Concrete(#`(#MSection 03306  PART 2: PRODUCTS 2.1MATERIALS(# A.Requirements: See specific materials requirements in specification sections elsewhere in the Contract. (#  PART 3: EXECUTION 3.1INSTALLATION(# A.Requirements: See specific construction requirements in specification sections elsewhere in the Contract. (#  PART 4: MEASUREMENT AND PAYMENT ***************************************************** WHEN A "LUMP SUM" CONTRACT IS USED, DELETE THE TITLE PART 4: MEASUREMENT AND PAYMENT, AND BOTH ARTICLES FROM THIS SECTION. MEASUREMENT AND PAYMENT WILL BE ADDRESSED IN PART 4 OF SECTION 01010 SUMMARY OF WORK. ***************************************************** 4.1METHOD OF MEASUREMENT(# A.Units: The work described in this section will not be measured for payment.(# 4.2BASIS OF PAYMENT(# A.Payment: No direct payment for the work described under this section will be made. Consideration for this item shall be included in the bid price for other scheduled items of the Contract.(# 0,END OF SECTION}&0*s's' ,WORK DATA SHEET V2for #SECTION 02292 - MAJOR EARTH DAMS 1.Common excavation in cu yds:(# 2.Common embankment in cu yds:(# 3.Dam height in ft:(# 4.Crest width:(# 5.Crest length:(# 6.Downstream slope (D.S.):(# 7.Upstream slope (U.S.):(# 8.Cut spillway width:(# 9.Cut spillway side slope:(# 10.Cut spillway depth:(# 11.Natural spillway depth:(# 12.Depth of cut off trench (core):(# 13.Borrow area side slope:(# 14.Borrow area end slope:(# Note: When several dam projects are included, the tabular format may be more appropriate. (10/02/91)