WPC  2QBVROZ|d 5f@8,?f\  P6G;?P"m+^8AM``AAA`k2A26``````````66kkkTwkAIwkkwwA6AX`AT`T`TA``66`6````AI6````T\&\hA2hXAAA2AAAAAAAA`6TTTTT}TwTwTwTwTA6A6A6A6``````````T`^```k`TTTTTTTywTwTwTwT````````A6A6A6A6kI`w6wMw6wAw6`q````AAAkIkIkIkIwQw6w6```````wTwTwT`w6`AkIw6``y``2``@#@WddddddddddddddddddddddddddddddddddddddddNEssEX`AT`````6=`:=`:AATT`BBs``uEssErkkAT`:"`soh`kss`HP LaserJet 4HPLAS4.PRS 4?f\  P6G;\*"P?P2rO$  X` hp x (#%'0*,.8135@8:, P age,  s5J  F ooter, B , E dit. Delete the "Project Name (ftr B)" text and replace  s5 it with the name of the project (bolded) . , until you arrive at the document text.(# D.The Guide Specifications are being reviewed and revised. Your technical comments on any guide spec would be greatly appreciated. Also, any specs that are written "from scratch" that would benefit others could be sent to either Dion Dishong or Lori Quayle, RS110.(# E.Indicate clearly in the text or drawings what is to be demolished, salvaged, or removed, and any controls such as disposal sites or haul routes the Contractor is restricted to.(# F.Inspect the facility to be demolished for hazardous or toxic substances such as asbestos, PCBs, or petroleum products.(#  s5  DRAWING DATA REQUIRED: Location of drawings required.  s4   REVISIONS OF THIS SECTION:  r5  CSI format, editorial changes: 8/96 Metric: 9/96 Technical Update: 3/96 POINT OF CONTACT: Mary Anne Steury Phone: (303) 2369521 N!0*(( XM s4 #d `7#`(#GBUILDING DEMOLITION Project Name (ftr B)` (#T[3/96] .02221   b-SECTION 02221 6*BUILDING DEMOLITION PART 1: GENERAL 1.1SUMMARY(# A.Section Includes: The removal and disposal of [pavements], [pipelines], [concrete, masonry, metal or frame structures], and other obstructions shown on the drawings; [salvage of items indicated]; and backfilling cavities left after removal is complete.(# B.Related Sections:(# ************************************************** DELETE EITHER 01009 OR 10101. EITHER SECTION 01300 OR 01410 MUST BE UDES WHEN 01010 IS USED. ************************************************** General Information and Requirements(#`(#MSection 01009 Summary of Work(#`(#MSection 01010 Project Meetings(#`(#MSection 01312 Mobilization(#`(#MSection 01505 1.2PROJECT CONDITIONS(# ************************************************* Indicate work limits by flagging, marking, painting, etc. ************************************************* A.Work Limits: [Work limits shall be staked and control points established by the Government.](# B.Environmental Considerations: Use means necessary to prevent dust becoming a nuisance to the public, to neighbors, and to other work being performed on or near the site. [Watering for dust control shall be at no additional cost to the Government.](#  PART 2: PRODUCTS (No products are required in this section.)  PART 3: EXECUTION 3.1PREPARATION [Indicate preparation required.](# 3.2DEMOLITION(# A.General: Raze, remove and dispose of pavements, pipelines, and other construction shown on the drawings. Items not indicated as salvage for the Government shall become the property of the Contractor.(# B.Removal of Drainage Structures: Drawing structures shall be excavated and removed as indicated on the drawings.(# C.Removal of Concrete Pavement or Structures: Remove concrete pavement and structures as indicated on the drawings. Noise levels above 90 db or impact levels above 2700 J (2000 ft-lbs) must be approved by the Contracting Officer.(# }&0*s's'ԌD.Pipe Removal and Capping: Locate all buried utilities in the area and determine which are being removed. Pipelines to be removed to a point and capped shall be cut and capped in a manner [approved by the Contracting Officer.] [indicated on the drawings.](# E.Removal of Asphalt Pavement: Cut existing pavement a distance not to exceed 3048 mm (10 feet) from the perimeter of the existing building. Remove and dispose of pavement.(# F.Tanks: Remove underground tanks as indicated on the drawings.(# 3.3EXPLOSIVES(# ***************************************************** WRITE FOR THIS SECTION AND REFER TO SECTION 02202 - EXPLOSIVES. ***************************************************** 3.4SALVAGE(# ***************************************************** INDICATE WHICH ITEMS ARE TO BE SALVAGED AND WHERE THEY ARE TO BE PLACED. ***************************************************** 3.5DISPOSAL OF DEBRIS(# A.Requirements: Items or debris not designated as salvage for the Government shall become the property of the Contractor. Remove such materials from the site. Sale of material onsite is not allowed unless authorized in writing by the Contracting Officer. Replace or reimburse the Government for items designated as salvage for the Government that are lost or destroyed during demolition work. Items may be hauled to a site indicated on the drawings.(# 3.6BACKFILLING(# A.General: Fill cavities caused as a result of demolition.(# B.Backfill Placement: Spread backfill materials over the full width of the cross section of the cavity to a maximum loose thickness of 150 mm (6 inches), and compact as specified in paragraph 3.7B before the next layer is spread. The Contractor may use any type of compaction equipment except rubber-tired or smooth-steel-wheel rollers to obtain the required degree of compaction. The in-place materials shall be free of lenses, pockets, streaks, or layers of materials differing substantially in texture or gradation from the surrounding materials.(# C.Frozen Material: Do not place embankment when either the material or the surface on which it is to be placed is frozen.(# 3.7FIELD QUALITY CONTROL(# A.Moisture Content: During placing and compacting of backfill, the optimum moisture content (-4 percent to +2 percent) as determined by AASHTO T 217 or AASHTO T 239, unless otherwise approved, shall be maintained by wetting or drying, as required.(# B.Compaction: Compact the backfill to a minimum density of 95 percent of the maximum dry density as determined by AASHTO T 99, MethodC.(# $0*s's'ԌPART 4: MEASUREMENT AND PAYMENT *********************************************** WHEN A "LUMP SUM" CONTRACT IS USED, DELETE THE TITLE PART 4: MEASUREMENT AND PAYMENT, AND BOTH ARTICLES FROM THIS SECTION. MEASUREMENT AND PAYMENT WILL BE ADDRESSED IN PART 4 OF [SECTION 01009] [OR] [SECTION 01010]. WHEN NOT A "LUMP SUM" CONTRACT, SELECT APPLICABLE PHRASES; USE THE "NO MEASUREMENT" PHRASE WHEN NONE OF THE PAY ITEMS IN THIS SECTION ARE INCLUDED IN THE BID SCHEDULE. *********************************************** 4.1METHOD OF MEASUREMENT(# A.Units: [The work described in this section will not be measured for payment.] [Demolition will be measured and paid for] [on a lump sum basis.] [By the ton of material hauled away.](# 4.2BASIS OF PAYMENT(# ********************************************** WHEN NOT A "LUMP SUM" CONTRACT, SELECT APPLICABLE PHRASES; USE THE "NO DIRECT PAYMENT" PHRASE WHEN NONE OF THE PAY ITEMS IN THIS SECTION ARE INCLUDED IN THE BID SCHEDULE. WHEN MORE THAN ONE DIAMETER OR GAUGE IS SPECIFIED FOR ANY PAY ITEM, LETTER SUFFIXES WILL BE ADDED AFTER THE PARENTHESIS OF THE ITEM NUMBER. WHEN GOVERNMENTFURNISHED PROPERTY IS SPECIFIED FOR PAY ITEMS, THE LETTER SUFFIX GF WILL BE ADDED AFTER THE PARENTHESIS OF THE SAME NUMBER. ********************************************** A.Payment: [No direct payment for the work described under this section will be made. Consideration for this item shall be included in the bid price for other items of the Contract.] [Prices and payment will be full compensation for the work described in this section. Payment will be made under:](# Pay Item@ @  !Pay Unit(# 02221(1) Building Demolition(#p (#RLump Sum 02221(2) Building Demolition(#p!(#V Ton 0,END OF SECTION