WPC> 2QB$R ZCourierw RomanCourierCourier BoldCourier Italic@`7@HP LaserJet 4HPLAS4.PRS 4dp@sQ\*"P@wA6AX`AT`T`TA``66`6````AI6````T\&\hA2hXAAA2AAAAAAAA`6TTTTT}TwTwTwTwTA6A6A6A6``````````T`^```k`TTTTTTTywTwTwTwT````````A6A6A6A6kI`w6wMw6wAw6`q````AAAkIkIkIkIwQw6w6```````wTwTwT`w6`AkIw6``y``2``@#@WddddddddddddddddddddddddddddddddddddddddNEssEX`AT`````6=`:=`:AATT`BBs``uEssErkkAT`:"`soh`kss`#|dHPLAS4.PRS 4?f\  P6G;\*"P?P2rVCourierCourier Bold X` hp x (#%'0*,.8135@8:, P age,  s5)  F ooter, B , E dit. Delete the "Project Name (ftr B)" text and replace  s5 it with the name of the project (bolded) . , until you arrive at the document text.(# D.The Guide Specifications are being reviewed and revised. Your technical comments on any guide spec would be greatly appreciated. Also, any specs that are written "from scratch" that would benefit others could be sent to either Dion Dishong or Lori Quayle, RS110.(#  s5   DRAWING DATA REQUIRED: None  s4Y  REVISIONS OF THIS SECTION:  r5  CSI format, editorial changes: 4/97 Metric: Technical Update: 8/93 POINT OF CONTACT: Dion Phone: (303) 2369504!0*0*0* XM s4 #d `7#`@(#PSUBMITTALS Project Name (ftr B)` (#T[4/97] .01780   b-SECTION 01780 .SUBMITTALS PART 1: GENERAL 1.1SUMMARY(# A.Section Includes: Requirements for [record drawings] [operation and maintenance [data] [manuals] [posting maintenance instructions] [warranties] [and] [training of Government employees.](#  PART 2: PRODUCTS There are no applicable requirements.(#  PART 3: EXECUTION 3.1RECORD DRAWINGS(# A.General Requirements: A complete set of fullsized prints, furnished by the Contracting Officer for this purpose only, shall be kept at the site. As the job progresses, the Contractor shall continuously maintain record drawings of the work. The changes shall be noted legibly in red pencil or red ink. These drawings shall be submitted to the Contracting Officer for review prior to [each request for pay and prior to] the final inspection. [Should the final inspection reveal changes in the project not so noted on the record drawings, the Contractor shall record these changes on the record drawings within 5 working days of final inspection and submit the completed record drawings to the Contracting Officer.](# B.Installation Changes: Records shall be maintained by the Contractor of actual installations where at variance with the work shown, where changed, or where not otherwise located by dimension, elevation or other reference on the Contract drawings. Actual locations and elevations of equipment and components (such as pipe, conduits and ducts) occurring within concealed areas shall be recorded by actual dimensions referenced from readily accessible and permanent building lines or monuments.(# C.HVAC System: As a minimum, provide the following:(# 1.` ` Electrical, electropneumatic or electronic (as appropriate) schematic control (ladder) diagrams, showing all control components in the system and their interaction.(#` 2.` ` Connection drawings, showing the terminaltoterminal wiring and pneumatic tubing for all control components in the system. The connection drawings shall show the internal mechanism (i.e., contacts, coils, switches, potentiometers) for each component. The components shall be laid out on the drawings to reflect their actual location in the building.(#` 3.2OPERATION AND MAINTENANCE [DATA] [MANUALS](# ***************************************************** INSERT THE NUMBER OF SETS OF OPERATION AND MAINTENANCE DATA MANUALS REQUIRED. NORMALLY 3 COPIES ARE SUFFICIENT. DISTRIBUTION AFTER REVIEW IS NORMALLY 1 COPY TO THE CO, 1 COPY TO THE PROJECT FILE, AND 1 COPY TO THE INDIVIDUAL RESPONSIBLE FOR OPERATION AND MAINTENANCE OF THE FACILITY. *****************************************************}&0*s's'ԌA.General: The Contractor shall submit [____] copies of the operation and maintenance [data] [manuals] to the Contracting Officer for approval prior to the final inspection. Each set of the operation and maintenance [data] [manuals] shall be separately bound in durable plastic binders, 81/2 x 11 inches in size, with separators having index tabs.(# B.Content: Each set of operation and maintenance [data] [manuals] shall include the following:(# 1.` ` Identification on, or readable through, the front cover stating general nature of the data, name of subject equipment, facility installed in, reference number from drawings, and Contract number.(#` 2.` ` Index at front of the set of data.(#` 3.` ` Instructions regarding operation and maintenance of appliances, fixtures, equipment and automatic controls, including capacities, characteristics, performance curves and diagrams. List system number, unit number, manufacturer's model number, and manufacturer's drawing number. Provide a typewritten, descriptive narrative of the proper startup, operation, shutdown and servicing of the systems. Include the schedule for maintenance work, listing of each item of mechanical equipment requiring inspection, lubrication, and service, and describing the performance of such maintenance; listing all types of bearings of each piece of equipment; the type of lubricant required and frequency of lubrication; sequence and flow diagrams for each of the systems; emergency procedures; normal starting, operating, and shutdown procedures; care of air filters and when applicable; summer shutdown procedures.(#` 4.` ` Parts list with numbers.(#` 5.` ` Original warranty certificates in one set, with copies of these certificates in the other sets.(#` 6.` ` Copies of the approved shop drawings with data concerning changes made during construction.(#` 7.` ` Piping and wiring diagrams with terminal designations corresponding to field installation.(#` 8.` ` Schematic control (ladder) diagrams with a description of the sequence of the operation.(#` 9.` ` Operating curves for pumps, showing head, capacity, and horsepower; also performance curves for fans, showing static or total pressure, cfm, and horsepower. Show designed point of operation for each pump and fan.(#` 10.` ` A listing of Mechanical and Electrical Contractors and equipment suppliers by name, address, and telephone number, shall be included at the front of each manual. It shall be covered with a plastic sheet or inserted in a fullsized plastic envelope.(#` 11.` ` Maintenance instructions covering architectural surface materials, landscaping, and grounds maintenance.(#` 3.3POSTED INSTRUCTIONS(# A.General Requirements: Posted instructions shall be mounted prior to the final inspection.(# B.Location: Typed operating instructions and diagrams shall be mounted in a frame under 1/8inch clear plastic near the equipment, prior to providing operation training to selected Government employees.(# C.Content: Posted operating instructions shall consist of simplified consolidated equipment, control, and power diagrams graphically representing the entire system, including concise written instructions}&0*s's' on how to start and stop systems, conditions to be observed and adjustments to be made by the operators. Instructions shall include control diagrams, operating instructions, electrical controls, and interlocks. Posted instructions shall include the following, where applicable:(# 1.` ` Converter steam control.(#` 2.` ` Refrigeration controls.(#` 3.` ` Heating, ventilating, and airconditioning controls for each system.(#` 4.` ` Oneline diagrams of electric power risers and controls of any decentralized heating, cooling, and hotwater system.(#` 5.` ` Emergency systems.(#` 6.` ` Boilers, including burner or electrical controls.(#` 7.` ` Oneline schematic diagrams of water supply system (plumbing).(#` 8.` ` Oneline isometric diagrams of sanitary and acidresistant drainage systems.(#` 9.` ` Oneline diagrams of steamdistribution and glycol systems, including risers, valves, and cocks.(#` 10.` ` Oneline diagrams of fallout shelter heating, ventilating, airconditioning and emergency watersupply systems.(#` 11.` ` Oneline diagram of fueloil system.(#` 3.4WARRANTY(# A.Requirements: Materials and equipment furnished under this Contract shall be covered by the mostfavorable commercial warranties the Contractor gives to any customer for such materials or equipment. The rights or remedies provided shall be in addition to, and shall not limit any rights afforded to the Government by any other clause of this Contract. With respect to all warranties, expressed or implied, from manufacturers or suppliers for materials or equipment furnished under the Contract, the Contractor shall:(# 1.` ` Obtain all warranties that would be given in normal, commercial practices.(#` 2.` ` Require all warranties to be executed, in writing, for the benefit of the Government.(#` 3.` ` Submit all warranties to the Contracting Officer, prior to the final inspection.(#` 3.5TRAINING OF GOVERNMENT EMPLOYEES(# ***************************************************** INSERT SYSTEM REQUIRING TRAINING AND HOURS OF TRAINING REQUIRED. SUGGESTED MINIMAL TRAINING PERIODS ARE: ` `  CONTROL SYSTEMS 24 HOURS(#` ` `  MECHANICAL SYSTEMS 24 HOURS(#` ` `  ELECTRICAL SYSTEMS 16 HOURS(#` ` `  FIRE SYSTEMS 8 HOURS(#` ` `  SECURITY SYSTEMS 8 HOURS(#` ***************************************************** A.Requirements: Prior to final acceptance, the Contractor shall provide instruction for Government personnel designated by the Contracting Officer in the operation and maintenance of each system and its equipment. The instructor's expertise shall be appropriate to the particular system involved. Instructions by a factorytrained representative, approved by the Contracting Officer, shall be provided for all the systems. Prior to the start of any training, the instructors shall submit an outline of the proposed training (including hours of training planned) and copies of training materials to be distributed to the trainees for approval by the Contracting Officer. Minimal training periods shall be as follows:(#}&0*s's'Ԍ` ` @ @ System&+04Hours of Training(#  PART 4: MEASUREMENT AND PAYMENT ***************************************************** WHEN A "LUMP SUM" CONTRACT IS USED, DELETE THE TITLE PART 4: MEASUREMENT AND PAYMENT, AND BOTH ARTICLES FROM THIS SECTION. MEASUREMENT AND PAYMENT WILL BE ADDRESSED IN PART 4 OF SECTION 01010 SUMMARY OF WORK. ***************************************************** 4.1METHOD OF MEASUREMENT(# A.Units: The work described in this section will not be measured for payment.(# 4.2BASIS OF PAYMENT(# A.Payment: No direct payment for the work described under this section will be made. Consideration for this item shall be included in the bid price for other items of the Contract.(# 0,END OF SECTION