WPC  2QB$R ZCourierw RomanCourierCourier BoldCourier Italic@`7@  X` hp x (#%'0*,.8135@8:, P age,  s5  F ooter, B , E dit. Delete the "Project Name (ftr B)" text and replace  s5 it with the name of the project (bolded) . , until you arrive at the document text.(# D.The Guide Specifications are being reviewed and revised. Your technical comments on any guide spec would be greatly appreciated. Also, any specs that are written "from scratch" that would benefit others could be sent to either Dion Dishong or Lori Quayle, RS110.(#  s5  DRAWING DATA REQUIRED: None A. 1.01B: Insert number of days to be allowed for review. Normally 15 days is sufficient.(# B.1.01B: Insert title of person to receive submittals (COR or CO).(# C.4.01 and 4.02: When a "lump sum" Contract is used, delete the title PART 4: MEASUREMENT AND PAYMENT, and both articles from this section. Measurement and payment will be addressed in Part 4 of Section 01010 Summary of Work.(#  s4$  REVISIONS OF THIS SECTION:  r58%  CSI format, editorial changes: 3/97 Metric: Technical Update: 9/91 POINT OF CONTACT: Dion Dishong Phone: (303) 2369504-'0*0*0* XM s4 #d `7#`x(#NCERTIFICATES Project Name (ftr B)` (#T[3/97] .01331   b-SECTION 01331 -CERTIFICATES PART 1: GENERAL 1.1SUMMARY(# A.Section Includes: The requirements for Certificates of Conformance.(# B.Requirements: Refer to specifications for Certificates of Conformance required. Allow [ 15 ] working days for review. Review time commences upon receipt by the Contracting Officer. Certificates of Conformance shall be delivered to the [______________________.](# 1.2QUALITY ASSURANCE(# A.Authorization: The Contracting Officer may permit use, prior to sampling and testing, of material when accompanied by Certificates of Conformance. Material used on the basis of a Certificate of Conformance may be sampled and tested. Installation of material on the basis of a Certificate of Conformance shall not relieve the Contractor of responsibility for incorporating material which conforms to the requirements of the drawings and specifications. Material not conforming to those requirements will be subject to rejection, whether in place or not.(# PART 2: PRODUCTS (There are no applicable requirements.)  PART 3: EXECUTION 3.1PREPARATION(# A.Format: The form of the Certificate of Conformance provided by the supplier shall be as follows:(# 1.` ` The certificate shall state that the named product conforms to the Contract requirements.(#` 2.` ` The certificate shall either be accompanied with a certified copy of the test results, or certify that such test results are on file with the manufacturer and will be furnished to the Contracting Officer upon request.(#` 3.` ` The certificate shall provide the name and address of the manufacturer, the testing agency, and the date of tests.(#` 4.` ` The certificate shall set forth the means of identification which will permit field determination of the product delivered as being the product covered by the certification.(#` PART 4: MEASUREMENT AND PAYMENT 4.1METHOD OF MEASUREMENT(# A.Units: The work described in this section will not be measured for payment.(# 4.2BASIS OF PAYMENT(# /%0*s's'ԌA.Payment: No direct payment for the work described under this section will be made. Consideration for this item shall be included in the bid price for other items of the Contract.(# 0,END OF SECTION