WPC 2QB$R ZCourierw RomanCourierCourier BoldCourier Italic@`7@HP LaserJet 4HPLAS4.PRS 4dp@sQ\*"P@  X` hp x (#%'0*,.8135@8:, P age,  s5  F ooter, B , E dit. Delete the "Project Name (ftr B)" text and replace  s5* it with the name of the project (bolded) . , until you arrive at the document text.(# D.The Guide Specifications are being reviewed and revised. Your technical comments on any guide spec would be greatly appreciated. Also, any specs that are written "from scratch" that would benefit others could be sent to either Dion Dishong or Lori Quayle, RS110.(#  s5c  DRAWING DATA REQUIRED: Shop drawings as required by the specifications and asbuilt drawings. A listing of required submittals shall be provided to the Contractor at the prework conference. Include with this listing, the number of copies required for distribution.(# B. 1.01B: Insert number of days to be allowed for review. Normally 15 working days is sufficient.(# C. 1.01B: Insert title of person to receive submittals (CO).(# D. 1.03: For contracts with construction estimates over $500,000, CPM or PERT requirements may be inserted.(# F. 3.04D3: Select phrase in brackets when structural considerations are required.(# H.4.01 and 4.02: When a "lump sum" Contract is used, delete the title PART 4: MEASUREMENT AND PAYMENT, and both articles from this section. {(0*0*0* Measurement and payment will be addressed in Part 4 of Section 01010 Summary of Work.(#  s4  REVISIONS OF THIS SECTION:  r5  CSI format, editorial changes: 3/97 Metric: Technical Update: 8/93 POINT OF CONTACT: Dion Dishong Phone: (303) 23695040*0*0* X XM s4 #d `7#`X(#FSUBMITTAL PROCEDURES Project Name (ftr B)` (#T[3/97] .01330   b-SECTION 01330 )SUBMITTAL PROCEDURES PART 1: GENERAL 1.1SUMMARY(# A.Section Includes: Requirements for submittals of the [work schedules,] [value schedules,] [design computations,] [shop drawings,] [manufacturer's literature,] and [samples.](# B.Requirements: Refer to specifications for submittals required. Allow [ 15 ] working days for review. Review time commences upon receipt by the Contracting Officer. Submittals shall be delivered to the [________________.](# 1.2QUALITY ASSURANCE(# A.Approval: Written approval of the submittals is an indication that the Contractor's submittals have been reviewed and that there are no objections, except as noted. Installation of material on the basis of written approval of submittals shall not relieve the Contractor of the responsibility for incorporating material which conforms to the requirements of the drawings and specifications. Written approval of deviations shall apply only to those deviations or omissions from the requirements of the drawings and specifications brought to the Contracting Officer's attention in writing. After written approval of an item, the Contractor may submit a substitution for approval, if the approved item cannot be purchased or delivered in time to avoid delay in completion of the project.(#  PART 2: PRODUCTS There are no applicable requirements.(#  PART 3: EXECUTION 3.1WORK SCHEDULE:(# A.Requirements: The schedule shall be submitted at the pre-work conference. When requested, the Contractor shall submit an updated schedule within three [working] [calendar] days. As a minimum, the estimated start and completion dates should be shown in the schedule.(# 3.2VALUE SCHEDULE(# A.Requirements: The Contractor shall prepare a value schedule for presentation at the pre-work conference.(# 3.3DESIGN COMPUTATIONS(# A.Requirements: The Contractor shall deliver to the Contracting Officer the complete design effort, including computations, specifications and working drawings necessary to construct the design required by the specification sections in this Contract. The Contractor shall provide enough time for reviews, revisions, and resubmittals so as to not delay the work. When submittals have received final written approval, the Contractor shall make distribution to the parties concerned.(# }&0*s's'Ԍ3.4SHOP DRAWINGS AND MANUFACTURER'S LITERATURE(# A.General: The Contractor shall deliver to the Contracting Officer the shop drawings and manufacturer's literature required by the specification sections in this Contract to the Contracting Officer.(# B.Identification: When full catalogs or pages and tables are submitted, the specific items to be used on this project shall be circled, blocked in or underlined. Completely identify each submittal by showing the following information:(# 1.` ` Name and address of preparer, plus name and telephone number of the individual to contact for further information.(#` 2.` ` Name of project as it appears in these specifications.(#` 3.` ` Contract number, drawing number and specification section number to which the submittal applies.(#` 4.` ` Whether this is an original submittal or resubmittal.(#` 5.` ` Each item shall clearly note the manufacturer's name and address, trade name, product, lot, style, color, catalog designation or model number, and locations of use.(#` C.Mechanical and Electrical: Catalogs or pages and tables for mechanical and electrical items to be used on this project shall be delivered in one complete mechanical package and one complete electrical package. Incomplete packages will be retained until all items are received. Shop drawings may be submitted separately. The following additional data is required:(# 1.` ` Rough-in data and dimensions.(#` 2.` ` Motor characteristics and wiring diagrams.(#` 3.` ` Performance curves and rated capacities.(#` 4.` ` Operation characteristics.(#` D.Substitutions: The Contractor shall present requests for substitutions to the Contracting Officer according to the following:(# 1.` ` Deliver sufficient calculations and data to justify selection of the proposed item and permit comparison with the original item.(#` 2.` ` Show complete layout of system, except that which is identical to Contract documents, unless unchanged portion must be shown to indicate clearances.(#` 3.` ` Include drawings, same (or larger) scale as Contract drawings, marked to show differences. [Include detail drawings of supports for equipment and load calculations, stamped and signed by a registered [professional] [structural] engineer.](#` 4.` ` Submit complete technical data including test data, drawings, manufacturer's literature, samples, and complete performance specifications.(#` 5.` ` The Contractor is responsible for the cost of redesign and modifications to this or other parts of the project caused by the substitutions.(#` 3.5SAMPLES(# A.Requirements:(# 1.` ` The Contractor shall deliver samples required by the specification sections in this contract. Submit samples with shop drawings when both are required. (#` 2.` ` Each item shall clearly note the manufacturer, trade name, product, lot, style, color, model, locations of use and contract document reference.(#` /%0*s's'Ԍ3.` ` [Final color selections shall be made only after related color samples have been received.] [The color(s) [and patterns] [is] [are] specified in the Color Schedule, Section 09999.](#`  PART 4: MEASUREMENT AND PAYMENT 4.1METHOD OF MEASUREMENT(# A.Units: The work described in this section will not be measured for payment.(# 4.2BASIS OF PAYMENT(# A.Payment: No direct payment for the work described under this section will be made. Consideration for this item shall be included in the bid price for other items of the Contract.(#  0,END OF SECTION