|
Before including your address, phone number, email address, or other personal identifying information in your comment, be advised that your entire comment--including your personal identifying information--may be made publicly available at any time. While you can ask us in your comment to withhold from public review your personal identifying information, we cannot guarantee that we will be able to do so.
 |
 |
 |
FY 2009 NEPA Log | NEPA Number DOI-BLM-CO-110-2009- | Project Name | Program | Applicant | Location | Status | 001-DNA | Verizon Wireless Communication Site | Realty | Cellular Inc. Network Corporation | T1S R98W 7 | Initiated 10/07/2009 Completed 11/03/2008 | 002-CX | Geo-testing for Colorado Hub Pipeline | Realty | Williams Northwest Pipeline | T2S R101W 15 | Initiated 10/03/2008 Completed 10/16/2008 | 003-DNA | Eden Pipeline to Well 28-44 | Oil & Gas | Eden Energy | T2N R96W 28 | Initiated 10/07/2008 Completed 10/09/2008 | 004-CX | Right of Way Assignment for COC44220 | Realty | Shell Frontier Oil & Gas | T1N R103W 12 | Initiated 10/10/2008 Completed 10/23/2008 | 005-CX | Surface pipeline BTU 25-4 to ETC Canyon meter | Oil & Gas | BTU Energy | T4S R102W 1 | Initiated 10/31/2008 Withdrawn 09/24/2009 | 006-EA | Road Re-route & Widening 2-Track Road to Improve Access | Oil & Gas | ExxonMobil Corporation | T2S R97W 12 | Initiated 06/16/2009 Withdrawn 06/16/2009 | 007-DNA | CIG 2 Meter Stations - Trappers Lake/Flat Top Meter Stations | Realty | Colorado Interstate Gas Co (CIG) | T2S R96W 5 | Initiated 10/22/2008 Completed 01/14/2009 | 008-DNA | Eden Pipeline for Well 13-43 (T2N, R97W, Sec. 13) | Oil & Gas | Eden Energy Colorado LLC | T2N R97W 13 | Initiated 10/28/2008 Completed 12/04/2008 | 009-EA | Eden Well 5-32 | Oil & Gas | Eden Energy Colorado LLC | T2N R96W 5 | Initiated 06/16/2009 Withdrawn 06/16/2009 | 010-DNA | May 2009 Oil & Gas Lease Sale | Oil & Gas | COSO | T4S R97W 25 | Initiated 11/04/2008 Completed 02/23/2009 | 011-CX | Land Use Permit Renewal COC68435 | Realty | Shell Exploration & Production | T2S R98W 4 | Initiated 10/28/2008 Completed 01/09/2009 | 012-DNA | Natural Soda 10H-C core-hole | Minerals (Other) | Natural Soda Inc. | T1S R98W 26 | Initiated 10/03/2008 Completed 02/06/2009 | 013-DNA | Grazing Preference Transfer to Russ and Renee Steele | Range Management | Russ and Renee Steele | T2N R103W 24 | Initiated 11/04/2008 Completed 12/17/2008 | 014-EA | | Oil & Gas | Piceance Energy, LLC. | T3N R102W 36 | Initiated 11/10/2008 Completed 02/04/2009 | 015-CX | Assignment Dominion Pipeline to BOPCO | Realty | BOPCO | T1N R97W 17 | Initiated 11/03/2008 Completed 02/04/2009 | 016-DNA | Pesticide Use Proposal for the Jewell et al Grazing Allotment | Weeds | Leal A. Julius | T3S R94W 11 | Initiated 11/04/2008 Completed 12/17/2008 | 017-CX | McCarthy Gulch Road | Realty | ExxonMobil | T4S R95W 11 | Initiated 10/21/2008 Completed 02/24/2009 | 018-CX | Windsor Well Pipeline Gap | Realty | Bargath, Inc. | T2S R98W 13 | Initiated 10/14/2008 Completed 01/22/2009 | 020-DNA | WRFO Ninemile-Hay Gulch Leafy Spurge Aerial Treatment | Weeds | BLM - WRFO | T1N R93W | Initiated 11/07/2008 Completed 01/29/2009 | 021-DNA | Beefsteak Pasture Burdock Control Program | Range Management | BLM - WRFO | T1N R96W 23 | Initiated 11/18/2008 Completed 01/21/2009 | 022-DNA | Resource Area Wide Spot Application for Knapweed | Weeds | BLM - WRFO | - | Initiated 11/18/2008 Completed 01/21/2009 | 023-DNA | Whiting Compressor Powerline | Oil & Gas | White River Electric Assoc | T2S R97W 34 | Initiated 11/12/2008 Completed 05/08/2009 | 024-CX | Meeker Gas Plant TUA | Realty | Enterprise Gas Processing | T1S R97W 18 | Initiated 11/12/2008 Completed 02/06/2009 | 025-CX | Williams' pipeline replacement in T2S, R98W, Sec. 19 | Oil & Gas | Williams Production RMT | T2S R98W 19 | Initiated 11/18/2008 Completed 03/30/2009 |
 |
026-DNA | Relocation of XTO plant outlet pipeline | Realty | XTO Energy | T2S R96W 5 | Initiated 11/11/2008 Completed 02/13/2009 | 027-DNA | Chevron one new flowline - AC McLaughlin 95X to CS #1 | Oil & Gas | Chevron USA, Inc. | T2N R103W 11 | Initiated 11/04/2008 Completed 02/18/2009 | 029-DNA | TUP to directional drill pipeline | Realty | TransColorado | T2S R96W 8 | Initiated 11/13/2008 Completed 04/17/2009 | 034-DNA | BOPCO - replace existing 6" diam. steel gathering line to well YCF 5-32-1 | Oil & Gas | BOPCO, L.P. | T1S R98W 5 | Initiated 11/13/2008 Completed 11/20/2008 | 035-EA | | Oil & Gas | Williams Production RMT Co. | T2S R98W 1 | Initiated 11/25/2008 Completed 06/16/2009 | 036-CX | Upper Colorado Environmental Plant Center (UCEPC) Native Plant Materials Site Fence | Range Management | Upper CO Environmental Plant Center | T2S R99W 27 | Initiated 11/25/2008 Completed 12/04/2008 | 037-DNA | Milk Creek Allotment Noxious Weed Control | Weeds | BLM - WRFO | T3N R91W 29 | Initiated 11/25/2008 Completed 01/28/2009 | 038-CER | Mushroom Rock - Rock Art Site Fence | Cultural | BLM - WRFO | T1S R101W 18 | Initiated 11/24/2008 Completed 12/05/2008 | 039-EA | | - | Dalbo | T2N R101W 18 | Initiated 09/29/2008 Completed 06/26/2009 | 040-DNA | Eden Well 28-42 | Oil & Gas | Eden Energy, LLC. | T2N R96W 28 | Initiated 11/24/2008 Completed 03/04/2009 | 041-DNA | Williams' Pipeline from Well 12-14-298 to 43-15-298 in T2S, R98W, Sec. 14 | OIL & GAS | Williams Production RMT Co. | T2S R98W 14 | Initiated 11/25/2008 Completed 05/18/2009 | 042-DNA | Burke Brothers Permit Renewal - Duplicate or same as 54 below | Range Management | Burke Brothers | - | Initiated 11/25/2008 Withdrawn - | 043-EA | | Oil & Gas | ExxonMobil Corporation | T2S R97W 16 | Initiated 11/18/2008 Completed 01/14/2009 | 044-DNA | Williams' Wells(25) in T1S, R98W, Sec. 24, 25, &35, T2S, R97W Sec. 6 | Oil & Gas | Williams Production RMT Co. | T1S R98W 25 | Initiated 12/02/2008 Completed 04/17/2009 | 045-EA | | Minerals (Other) | Blue Mountain Energy | T3N R101W 21 | Initiated 11/05/2008 Completed 04/09/2009 | 046-DNA | Douglas Pass/Magnolia Black Henbane Control Program | Weeds | BLM - WRFO | T5S R101W 5 | Initiated 12/02/2008 Completed 01/21/2009 | 047-CX | Upgrade RGU 42-3-298 and 23-35-198 pipelines | REALTY | Bargath Inc. | T1S R98W 35 | Initiated 11/25/2008 Completed 05/12/2009 | 048-DNA | Telephone service to Williams Willow Creek Plant | Realty | Qwest Network Services | T2S R97W 36 | Initiated 11/14/2008 Completed 09/17/2009 | 049-DNA | Eden Well 33-31 | Oil & Gas | Eden Energy Colorado LLC | T2N R96W 33 | Initiated 12/02/2008 Completed 04/17/2009 | 050-CX | Renewal of ETC Canyon gas pipeline | Realty | ETC Canyon Pipeline LLC | T3N R97W 31 | Initiated 11/21/2008 Completed 04/17/2009 |
 |
051-DNA | Natural Soda Production Wells 10H-I, 10H-R, 11H-I and 11H-R | Minerals (Other) | Natural Soda Inc, | T1S R98W 25 | Initiated 12/01/2008 Completed 04/09/2009 | 052-DNA | Square S, Tommy's Draw, and Black Sulphur Integrated Houndstongue | Weeds | BLM - WRFO | T4S R99W 8 | Initiated 12/09/2008 Completed 01/21/2009 | 053-CX | Temp Use Permit for Chevron met towers | Realty | Chevron USA | T1N R99W 6 | Initiated 12/04/2008 Completed 02/04/2009 | 055-DNA | Brennan, CW Grazing Permit Renewal | Range Management | Brennan, CW | - | Initiated 12/11/2008 Completed 09/28/2009 | 056-DNA | Square S Grazing Permit Renewal | Range Management | Mantle Ranch | - | Initiated 12/11/2008 Completed Reviewing | 057-EA | | Range Management | CDOW | - | Initiated 12/11/2008 Completed 02/20/2009 | 058-EA | | Range Management | Mantle Ranch/Boone Vaughn | - | Initiated 12/11/2008 Completed 09/22/2009 | 059-EA | | Range Management | Lonnie Shults/XTO | - | Initiated 12/11/2008 Completed 07/17/2009 | 060-EA | | - | Williams Energy Co | - | Initiated 12/11/2008 Completed 10/27/2009 | 061-EA | Boone & Barbara Vaughn - Combined with another EA | - | Boone & Barbara Vaughn | - | Initiated 12/11/2008 Withdrawn - | 062-DNA | Figure Four well pad L16 498-(8) wells | Oil & Gas | EnCana Oil & Gas (USA) Inc. | T4S R98W 16 | Initiated 12/11/2008 Completed 06/03/2009 | 063-EA | Wilber/Oak Ridge Grazing Permit Renewal - same as 57 | - | Colorado Division of Wildlife | T1S R92W 8 | Initiated 12/11/2008 Withdrawn - | 064-CX | XTO's request for a secondary containment pit at well 1S-95-20-23CP | Oil & Gas | XTO Energy Inc. | T1S R95W 20 | Initiated 12/16/2008 Completed 01/07/2009 | 065-DNA | Bull Gulch Yellow Toadflax Treatment | Weeds | BLM - WRFO | T4S R97W 21 | Initiated 12/16/2008 Completed 01/27/2009 | 066-DNA | Dry Fork, Post Gulch, Willow Ck, Davis Can., Cow Ck, Cath. Bluffs, E. Doug. Integrated Houndstongue | Weeds | BLM - WRFO | T1S R95W ALL | Initiated 12/16/2008 Completed 01/13/2009 | 067-EA | | Recreation | DOI BLM WRFO | T4S R97W 4 | Initiated 12/16/2008 Completed 07/28/2011 | 068-DNA | Chevron Flowline-Carney 34X-4 | Oil & Gas | Chevron USA | T1N R102W 4 | Initiated 12/17/2008 Completed 03/10/2009 | 069-EA | | - | BLM WRFO and CDOW | T5N R101W 23 | Initiated 12/30/2008 Completed 09/21/2009 | 070-DNA | Central Treating Facility (CTF) Pipeline | Realty | Enterprise Gas Processing | T2S R97W 28 | Initiated 12/19/2008 Completed 05/12/2009 | 071-DNA | XTO's Well 3S-95-34-44AP in T3S, R95W, Sec. 34 | Oil & Gas | XTO Energy Inc. | T3S R95W 34 | Initiated 12/30/2008 Completed 08/10/2009 | 072-DNA | Williams Production Company Noxious Weed PUP | Weeds | Williams Production Company | T2S R96W 5 | Initiated 12/30/2008 Completed 02/06/2009 | 073-DNA | Williams Production Company Bareground Treatment PUP | Weeds | Williams Production Company | T2S R96W 5 | Initiated 12/30/2008 Completed 02/11/2009 | 074-CX | New Temporary Use Permit (TUP) for Willow Crk Ppln/Laydown Area | - | Williams Field Services CO | T2S R97W 36 | Initiated 12/30/2008 Completed 04/24/2009 | 075-DNA | Ryan Gulch Site Expansion | Realty | Bargath Inc. | T2S R97W 7; T2S R98W 1, 12 | Initiated 10/23/2008 Completed 04/24/2009 |
 |
076-EA | Pathfinder Interstate Pipeline | - | TransCanada | T2S 97W 19 | Initiated 06/10/2008 Withdrawn - | 077-DNA | K Ranch Salt Cedar Treatment | Weeds | BLM - WRFO | T4N R104W 23 | Initiated 01/13/2009 Completed 02/18/2009 | 078-DNA | EnCana Bareground Treatment PUP | Weeds | Monty Elder | T2S R96W 8 | Initiated 01/13/2009 Completed 03/05/2009 | 079-EA | | Oil & Gas | ExxonMobil Corporation | T2S R97W 11 | Initiated 12/16/2008 Completed 07/16/2009 | 080-DNA | CIG Right-of-Way herbicidal treatment | Weeds | CIG and Monty Elder | T2S R96W ALL | Initiated 01/13/2009 Completed 05/05/2009 | 081-DNA | Chevron Right-of Way Leafy Spurge Control | Weeds | Chevron USA and Monty Elder | T1N R96W 23 | Initiated 01/13/2009 Completed 03/10/2009 | 082-DNA | NWP Greasewood Buried Power Line | Realty | White River Electric Association | T1S R96W 32 | Initiated 01/05/2009 Completed 06/25/2009 | 083-CX | Renewal of Existing WREA ROW | Realty | White River Electric Association | T2N R98W 6 | Initiated 01/12/2009 Completed 05/27/2009 | 084-DNA | Williams Gas Pumping Station Buried Power Line | Realty | White River Electric Association | T2S R97W 36 | Initiated 01/05/2009 Completed 05/27/2009 | 085-EA | | Range Management | Larry and Susan Robinson | T5S R94W 6 | Initiated 01/20/2009 Completed 05/29/2009 | 086-DNA | Pride Weed Control Bareground PUP | Weeds | Pride Weed Control Inc. | T2S R101W 23 | Initiated 01/27/2009 Completed 03/30/2009 | 087-CX | Freeze Wall Fuels Reduction | Fire | BLM - WRFO | T1S R98W 30 | Initiated 01/26/2009 Completed 06/11/2009 | 088-DNA | Chevron- (1) H20 & (2) CO2 injection lines to AC McLaughlin 33 & 17 | Oil & Gas | Chevron USA, INC | T2N R103W 11 | Initiated 01/27/2009 Completed 03/10/2009 | 089-EA | CDOT Hwy 139 Drainage Ditch | Realty | Colorado Department of Transportation | T2S R101W 16 | Initiated 01/20/2009 Completed 09/15/2009 | 090-DNA | Native Habitat Inc. Noxious Weed Treatments | Weeds | Native Habitat Inc. | T3S R97W 5 | Initiated 02/03/2009 Completed 03/30/2009 | 091-DNA | Rocky Mountain Weed Management Bareground Treatments | Weeds | Rocky Mountain Weed Management | T3S R96W 6 | Initiated 02/03/2009 Completed 03/30/2009 | 092-DNA | WIC El Paso pipeline & AMSO RD&D noxious weed treatments | Weeds | Rocky Mountain Weed Management | Varies | Initiated 02/03/2009 Completed 03/30/2009 | 093-EA | Enterprise Gas Plant Phase 3 Power Line | - | White River Electric Association | T2S R98W 21 | Initiated 02/03/2009 Withdrawn - | 094-CX | Renewal of 4 Moon Lake powerlines | Realty | Moon Lake electric | T2N R103W 25 | Initiated 01/22/2009 Completed 08/21/2009 | 095-CX | Black Sulphur Aquatic Restoration | - | Bureau of Land Management (WRFO) | T3S R98W 18 | Initiated 02/03/2009 Completed 04/01/2009 | 096-DNA | Tamarisk Treatment with Garlon | Range Management | BLM - WRFO | - | Initiated 02/04/2009 Completed 04/01/2009 | 097-DNA | Jordan Fire & Barrelhead Fire Rehab | - | Bureau of Land Management (WRFO) | T1S R97W 19 | Initiated 02/17/2009 Completed 07/20/2009 | 098-CX | Renewal of Hydrogeologic monitoring wells | Realty | Shell Frontier O&G | T1S R98W 25 | Initiated 01/26/2009 Completed 09/04/2009 | 099-DNA | Rocky Mountain Weed Management Bareground Treatment | Weeds | Rocky Mountain Weed Management | T2N R97W 26 | Initiated 02/17/2009 Completed 04/01/2009 | 100-DNA | Rocky Mountain Weed Management Noxious Weed PUP | Weeds | Rocky Mountain Weed Management | T2N R97W 26 | Initiated 02/17/2009 Completed 04/01/2009 |
 |
101-DNA | Bayless Bareground Treatment (Monty Elder) | Weeds | Monty Elder | --- | Initiated 02/17/2009 Completed 04/01/2009 | 102-DNA | Ant Hill Unit (AHU) 17-43 well | Oil & Gas | Eden Energy | T2N R96W 17 | Initiated 02/17/2009 Completed 04/17/2009 | 103-DNA | Bareground Pesticide Use Permits (PUP's) Ryan Gulch | Weeds | Elder Weed Spraying | T1N R98W ALL | Initiated 02/24/2009 Completed 04/01/2009 | 104-DNA | Noxious Weed Treatment in Ryan Gulch | Weeds | Elder Weed Spraying | T1N R98W ALL | Initiated 02/24/2009 Completed 04/01/2009 | 105-EA | | - | Bargath Inc. | T1S R98W 25 | Initiated 12/15/2008 Completed 10/23/2009 | 106-CX | Renewal of Rocky Mtn Natural Gas Pipeline | - | Source Gas/Rocky Mountain Nat Gas | T3N R96W 3 | Initiated 02/03/2009 Completed 11/17/2009 | 107-EA | Ryan Gulch Wells (9) in T1S, R98W, Sec. 24, and T3S, R97W, Sec. 16 | - | Williams Production RMT | T1S R98W 24 | Initiated 02/24/2009 Completed 06/19/2009 | 108-CX | Renewal Philadelphia Ck Pipeline ETC Canyon | - | ETC Canyon LLC | T2S R101W 4 | Initiated 02/02/2009 Completed 11/18/2009 | 109-DNA | UBET Cell Site Power Line | Realty | White River Electric Association | T2S R96W 18 | Initiated 02/17/2009 Completed 05/27/2009 | 110-CX | Backup Generation for Rangely Cell Site | - | Union Telephone Company | T2N R102W 1 | Initiated 02/02/2009 Completed 12/01/2009 | 112-CX | ETC Pipeline maintenance - Cottonwood Creek | - | ETC Canyon LLC | T1S R103W 8, 15, 16, 18, 27, 35; T2S R103W 1 | Initiated 02/23/2009 Completed 09/24/2010 | 113-DNA | Flowlines- CS#5 (Produced Water Line) and MB Larson B-1 (CO2 Line) | Oil & Gas | Chevron USA, INC. | T2N R103W 23 | Initiated 03/03/2009 Completed 04/24/2009 | 114-DNA | EnCana/Conoco Phillips Bareground PUP's | Weeds | Backcountry Vegetation Management | T4S R96W 19 | Initiated 03/03/2009 Completed 04/17/2009 | 115-DNA | EnCana/Conoco Phillips Noxious Weed Treatment PUP's | Weeds | Backcountry Vegetation Management | T4S R96W 19 | Initiated 03/03/2009 Completed 04/17/2009 | 116-CX | EnCana Pipeline ROW Renewal | Realty | EnCana Oil & Gas (USA) Inc | T1S R100W 36 | Initiated 02/20/2009 Completed 07/16/2009 | 117-EA | One Application Permit to Drill (APD) Buckhorn Draw (Duck Creek ACEC)- H07-198 | - | EnCana Oil & Gas (USA), Inc. | T1S R98W 6 | Initiated 03/02/2009 Pending - | 118-DNA | Moon Lake power lines in Chevron Rangely Field | Realty | Moon Lake Electric | T2N R103W 15 | Initiated 02/12/2009 Completed 04/28/2009 | 119-EA | | - | EnCana Oil & Gas (USA), INC. | T2S R99W 9 | Initiated 03/10/2009 Completed 01/22/2010 | 120-DNA | Piceance Creek Unit (PCU) 296-17A1 flowlines-10 inch gas and 4 inch produced water | Oil & Gas | ExxonMobil | T2S R96W 16 | Initiated 02/27/2009 Completed 05/27/2009 | 121-DNA | Lower White River Riparian Restoration (Big Trujillo) | Riparian | BLM/CDOW | T1N R102W 7 | Initiated 03/17/2009 Completed 09/15/2009 | 122-DNA | Water Injection Well | Oil & Gas | BOPCO | T1S R98W 4 | Initiated 03/16/2009 Completed 09/09/2009 | 123-DNA | AMSO Oil Shale RDD Prospecting Permit Revision | Minerals (Other) | American Shale Oil | T2S R98W 21 | Initiated 03/13/2009 Completed 04/09/2009 | 124-CX | Communication tower - Williams Greasewood site | Realty | Williams Production RMT | T2S R95W 8 | Initiated 02/26/2009 Completed 05/27/2009 | 125-DNA | New Well and Pad Expansion for Federal RG 22-5-397 | Oil & Gas | Williams Production RMT | T3S R97W 5 | Initiated 03/20/2009 Completed 05/21/2009 |
 |
126-DNA | Piceance Creek Unit (PCU) 197-34A1-A9 (9 wells on one wellpad) | Oil & Gas | ExxonMobil Corporation | T1S R97W 34 | Initiated 02/26/2009 Completed 09/18/2009 | 127-DNA | Natural Soda Core Hole 12H-C | Minerals (Other) | Natural Soda Inc. | T1S R98W 21 | Initiated 03/20/2009 Completed 07/02/2009 | 128-EA | | Oil & Gas | ExxonMobil Corporation | T1S R97W 12 | Initiated 03/09/2009 Approved 5/09/2011 | 129-CX(390) | NOI to construct surface pipeline following SandRidge acquisition | - | Williams Production RMT | T2S R98W 29 | Initiated 03/23/2009 Completed 04/16/2009 | 130-DNA | Buckles Ranch Grazing Permit Renewal | Range Management | Buckles Ranch, Chad and Eleanor Carter | T2S R95W 13 | Initiated 03/25/2009 Completed 06/16/2009 | 131-EA | | Oil & Gas | Laramie Energy II, LLC | T3N R103W 33, 34 | Initiated 03/31/2009 Completed 08/13/2009 | 132-DNA | Wolf Creek Prescribed Burn Plan | Wildlife | BLM - WRFO | T3N R98W 5 | Initiated 04/07/2009 Completed 08/27/2009 | 133-DNA | August 2009 Competitive Oil & Gas Lease Sale | Oil & Gas | BLM, CSO | T1S 99W --- | Initiated 04/09/2009 Completed 05/27/2009 | 134-DNA | Western Interior Paleontological Society 2009 Field Season | Paleontology | Michael Loius Graham | T5S R101W 7 | Initiated 04/14/2009 Completed 05/29/2009 | 135-EA | Rangely Hospital R&PP | - | Rangely District Hospital | T1N R102W 2 | Initiated 04/02/2009 Completed 09/10/2010 | 136-DNA | Lone Mountain Production Bareground PUP | Weeds | Lone Mountain Production Co. | T2S R102W 7 | Initiated 04/21/2009 Completed 05/27/2009 | 137-DNA | Wexpro Co. Bareground and Noxious Weed Control PUP's | Weeds | Wexpro Company | T2S R103W 9 | Initiated 04/21/2009 Completed 05/27/2009 | 138-CX | Renewal of Public Broadcasting Communication Sites | Realty | Public Broadcasting of Colorado Inc | T2N R103W 10 | Initiated 04/10/2009 Completed 09/21/2009 | 139-DNA | | Minerals (Other) | Natural Soda Inc. | T1S R98W 26, 35 | Initiated 04/16/2009 Withdrawn 02/18/2010 | 140-DNA | Power line to NWP meter station at Meeker Gas Plant | Realty | White River Electric Assn | T1S R97W 19 | Initiated 04/07/2009 Completed 08/28/2009 | 141-CX | Secondary Containment Pit at Well No. 1S-96-9-11BP | Oil & Gas | XTO Energy Inc. | T1S R96W 9 | Initiated 04/21/2009 Completed 07/07/2009 | 142-DNA | Power line to well #35-11 McKee Gulch | Realty | White River Electric Association | T2S R97W 11 | Initiated 04/07/2009 Completed 08/17/2009 | 143-EA | | - | Rio Blanco | T1N R100W 6 | Initiated 04/23/2009 Completed 10/13/2009 | 144-EA | | - | Shell Exploration & Production | T1S R97W 29 | Initiated 04/27/2009 Completed 10/06/2009 | 145-EA | | Oil & Gas | EnCana USA, Inc. | T1S R99W 11 | Initiated 04/30/2009 Completed 07/27/2009 | 146-DNA | Chevron Pipeline Drip Trap #9 to CS #39 | Oil & Gas | Chevron USA, INC | T2N R102W 35 | Initiated 05/01/2009 Completed 06/18/2009 | 148-EA | | - | EnCana Oil & Gas (USA), Inc. | T1S R99W 26 | Initiated 03/31/2009 Completed 01/22/2010 | 149-DNA | Natural Soda Inc Production Well Pair 12H-I &12H-R | - | Natural Soda Inc. | T1S R98W 25 | Initiated 04/16/2009 Completed 10/05/2009 |
 |
153-CX | Renewal of Public Service Co gas pipeline | Realty | Public Service Co | T2S R98W 19 | Initiated 05/01/2009 Completed 07/16/2009 | 154-CX | Renew 2 Questar pipelines - Big horse & Lower Horse Draws | Realty | Questar Gas Management | T2S R101W 22 | Initiated 04/27/2009 Completed 09/17/2009 | 156-CX | Three wells and pad expansion at Williams' Federal Ryan Gulch 24-13-398 | Oil & Gas | Williams Production RMT Co. | T3S R98W 13 | Initiated 05/11/2009 Completed 08/28/2009 | 157-EA | | - | ExxonMobil | T3S R96W 18 | Initiated 04/06/2009 Completed 01/15/2010 | 159-DNA | Black Sulphur PJ Removal | Wildlife | BLM WRFO | T3S R99W 13 | Initiated 05/19/2009 Completed 05/29/2009 | 160-DNA | BOPCo one year temporary surface pipeline extension | Oil & Gas | BOPCO LP | T1N R98W 32 | Initiated 05/18/2009 Withdrawn 07/21/2009 | 161-DNA | Grazing Preference Transfer North Fork Price Creek Allot 06607 | Range Management | Travis Anderson | T4N R95W 17 | Initiated 05/19/2009 Completed 06/03/2009 | 162-DNA | Davis Creek Grazing Permit Transfer | Range Management | Jeff Squire | T2S R94W 9 | Initiated 05/19/2009 Completed 06/09/2009 | 163-DNA | Grazing Preference Transfer Villa Ind Allotment 06619 | Range Management | Albert and Mary Kay Krueger | T2N R95W 13 | Initiated 05/19/2009 Completed 06/03/2009 | 164-DNA | Williams three well DNA on existing pad 11-7-397 | - | Williams Production RMT Co | T3S R97W 7 | Initiated 05/26/2009 Completed 02/17/2010 | 165-DNA | Colorado Hub 24" connection to White River Hub | Realty | Williams Northwest Pipeline | T1S R97W 19 | Initiated 04/29/2009 Completed 06/30/2009 | 166-DNA | Enterprise Products Operating, LLC Noxious Weed Treatments | Weeds | Aspen Environmental FS | - | Initiated 06/02/2009 Completed 07/30/2009 | 167-DNA | Shell Cheatgrass Control PUP | Weeds | Shell Frontier Oil & Gas | T2S R98W 9 | Initiated 06/02/2009 Completed 06/18/2009 | 168-DNA | Shell Noxious/Invasive Weed Control PUP | Weeds | Shell Frontier Oil & Gas | T2S R98W 4 | Initiated 06/02/2009 Completed 06/18/2009 | 169-CX | Soil Heterogeneity Project: soil sampling phase | Oil & Gas | Mesa State College | - | Initiated 06/02/2009 Completed 06/05/2009 | 170-DNA | WREA Kendall Peak Power Line | - | White River Electric Assn | T1S R95W 2 | Initiated 05/29/2009 Completed 08/20/2009 | 171-DNA | Global Geophysical Dust Abatement-Vinyl Coplymer | - | Global Geophysical Services | - | Initiated 06/01/2009 Completed 09/30/2009 | 172-CX | Chevron Pipeline - emergency repair | Realty | Chevron Pipeline | T1N R103W 16 | Initiated 05/21/2009 Completed 06/09/2009 | 173-EA | | - | USDI-BLM | T1S R95W | Initiated 06/02/2009 Completed 12/09/2009 | 174-EA | | - | EnCana Oil & Gas (USA), Inc | T1S R99W 1 | Initiated 06/05/2009 Completed 10/26/2009 | 175-CX | Wilson Creek Injection Line Replacement (WC#20-WC#34) | - | Chevron USA, Inc | T3N 94W 34 | Initiated 06/05/2009 Completed 11/05/2009 |
 |
176-CX | Wilson Creek Flowline Replacement (WC#31-WC#38) | Oil & Gas | Chevron USA, Inc | T2N R94W 2 | Initiated 06/05/2009 Completed 08/10/2009 | 177-DNA | Plan of Development Oil Shale RD&D Lease Tract COC69169 | Minerals (Other) | American Shale Oil, LLC | T2S R98W 21 | Initiated 05/19/2009 Completed 08/27/2009 | 178-CX | Blue Mountain Energy Deserado Mine Permit Renewal | Minerals (Other) | Blue Mountain energy | T3N R101W 19 | Initiated 06/04/2009 Completed 08/20/2009 | 179-EA | | - | White River Electric Association | T2S R98W 21 | Initiated 05/29/2009 Completed 12/28/2009 | 180-EA | | - | Genesis Gas & Oil, LLC | T1N R100W 3 | Initiated 06/09/2009 Completed 12/08/2009 | 181-EA | 5 APDs for Genesis' Fletcher Gulch Gas Well Project | - | Genesis Gas & Oil, LLC | T1N R100W 3, 10; T2N R100W 34 | Initiated 06/09/2009 Pending - | 182-DNA | Reroute Rio Blanco County (RBC) Rd 83 | Realty | Rio Blanco County | T1S R98W 35 | Initiated 06/03/2009 Completed 09/24/2009 | 183-DNA | Meter run Trail Canyon 24-3 | Realty | ETC Canyon Pipeline LLC | T4S R101W 24 | Initiated 05/15/2009 Completed 09/30/2009 | 184-DNA | Two variance requests for Colorado Hub | Realty | Williams Northwest Pipeline | T2S R100W 18 | Initiated 06/09/2009 Completed 07/07/2009 | 185-CX | NOI Construct temporary surface water line from Williams' RGU 32-27-198 | Oil & Gas | Williams Production RMT | T1S R98W 27 | Initiated 06/15/2009 Withdrawn 06/30/2009 | 186-DNA | Meeker Gas Plant Storm Water Management Area | Realty | Enterprise Gas Processing | T1S R97W 18 | Initiated 06/15/2009 Completed 08/17/2009 | 187-DNA | Overland Pass Variance Request | Realty | Overland Pass Pipeline Co. | T2S R97W 36 | Initiated 06/15/2009 Completed 07/30/2009 | 188-EA | Rio Blanco County Road 69 Recycled Water Storage Facility | - | EnCana Oil & Gas (USA) Inc. | T3S R97W 19 | Initiated 06/15/2009 Withdrawn - | 189-CX | Wilgath ROW Assignments | Realty | Exxon Mobil Corporation | T3S R97W 6 | Initiated 05/29/2009 Completed 09/21/2009 | 190-CX | Pipelines and Meter Facilities ROW Assignments | Realty | White River Hub, LLC | T2S R95W 5 | Initiated 06/11/2009 Completed 09/24/2009 | 191-DNA | Moon Lake power line to Chevron Levison 25X | - | Moon Lake Electric | T2N R102W 26 | Initiated 06/11/2009 Completed 09/17/2009 | 192-DNA | | - | Bargath Inc | T1N R98W 31 | Initiated 06/19/2009 Completed 03/03/2011 | 193-DNA | Ryan Gulch Unit (RGU) 31-34-198 Water Pipelines | Realty | Bargath, Inc. | T1S R98W 34 | Initiated 06/26/2009 Completed 07/16/2009 | 194-EA | ExxonMobil 3 APD's, NPU 197-17A1, -12A1, -5A1; (No pipelines) | - | ExxonMobil | T1S R97W 5, 12, 17; T3S R95W 21; T3S R96W 15 | Initiated 06/17/2009 Completed 09/29/2010 | 195-EA | Two Notice of Stakings ( NOS's) Hell's Hole 17-9, & 17-6 (pipeline included) | - | Robert Bayless | T2S R103W 17 | Initiated 06/29/2009 Withdrawn - | 196-DNA | Grazing Preference Transfer (Name change only) | - | Anderson Ranch | T1N R95W 4 | Initiated 06/30/2009 Completed 07/07/2009 | 197-EA | Eureka Unit APDs- D30-397 Pad | - | EnCana Oil & Gas (USA), Inc. | T3S R97W 19 | Initiated 07/01/2009 Completed 11/18/2009 | 198-DNA | ExxonMobil pipeline reroute - well Freedom Unit 297-20B1 | Oil & Gas | ExxonMobil | T2S R97W 20 | Initiated 07/01/2009 Completed 08/17/2009 | 199-CX | Renew/retire N Douglas meter station & pipeline | - | Public Service Co/Xcel | T1S R101W 29 | Initiated 06/05/2009 Completed 01/22/2010 | 200-DNA | November Oil & Gas Lease Sale | Oil & Gas | BLM - COSO | T1S R97W 6 | Initiated 07/14/2009 Completed 08/10/2009 |
 |
201-DNA | Fiber Optic Conduit | Realty | White River Hub, LLC | T1S R97W 19 | Initiated 07/06/2009 Completed 09/09/2009 | 202-EA | Bargath Black Sulphur gathering system | - | Bargath Inc | T2S R97W 27, 28, 29, 34, 35 | Initiated 12/15/2008 Completed 06/21/2010 | 203-CX | Deserado Mine Nitrogen Injection Well N9-56 (MR-140) | Minerals (Other) | Blue Mountain Energy | T3N R101W 20 | Initiated 07/13/2009 Completed 08/10/2009 | 204-CX | Blue Mountain Energy Emergency Generator (MR141) | Minerals (Other) | Blue Mountain Energy | T2N R101W 4 | Initiated 07/20/2009 Completed 08/12/2009 | 205-DNA | Produced Water Pipeline Re-route | Realty | Exxon Mobil | T2S R96W 5 | Initiated 07/17/2009 Completed 08/12/2009 | 206-CX | FV Larson B20X to Levison 11 Chevron Replacement Line | Oil & Gas | Chevron USA, Inc | T2N R102W 26 | Initiated 07/27/2009 Completed 09/18/2009 | 207-CX | Mineral Material Sale Removal From Construction Site | Minerals (Other) | ExxonMobil | T1S R97W 28 | Initiated 07/23/2009 Completed 08/26/2009 | 208-EA | Ten APDs Freedom Unit FRU 297-8A1-A10,w/Access and Pipelines | - | ExxonMobil | T2S R97W 8 | Initiated 07/25/2009 Pending - | 209-DNA | Nine APDs for one pad - Freedom Unit 297-28B1-B9 with Access and Pipelines | Oil & Gas | ExxonMobil | T2S R97W 28 | Initiated 07/28/2009 Completed 09/18/2009 | 210-CX | SB Lacy 4 Pipeline Foundation Repair | Oil & Gas | Chevron USA | T1N R102W 2 | Initiated 07/29/2009 Completed 09/18/2009 | 211-CX | Questar CPS/Moon Lake powerline in East Douglas | Realty | Questar Pipeline Company | T2S R101W 35 | Initiated 09/13/2009 Completed 09/21/2009 | 212-CX | Assignment of Injection well Windsor to Dschaak | - | Dschaak Consulting LLC | T3N R103W 21 | Initiated 07/30/2009 Completed 12/02/2009 | 213-DNA | Western States Reclamation Noxious Weed Control PUP's | - | Western States Reclamation | - | Initiated 08/04/2009 Completed 03/24/2010 | 214-CX | Buckskin Pipeline ROW Assignment | - | Enterprise Gas Processing LLC | T2S R96W 5 | Initiated 08/03/2009 Completed 06/30/2010 | 215-DNA | | Range Management | BLM - WRFO | T1S R96W ALL | Initiated 08/03/2009 Completed 08/28/2009 | 216-DNA | Shell Frontier RDD East Lease Appraisal Program (COC-69166) | Minerals (Other) | Shell Frontier | T2S R98W 4 | Initiated 07/31/2009 Completed 09/15/2009 | 217-CX | Assignment Williams NWP Parachute Lateral to Parachute Pipeline LLC | - | Williams Northwest Pipeline | T2S R96W 5 | Initiated 07/31/2009 Completed 12/09/2009 | 218-DNA | 2009 West Douglas Wild Horse Partial Gather | Wild Horses | BLM - WRFO | T1S R101W ALL | Initiated 08/04/2009 Withdrawn 08/28/2009 | 219-CX | Buckhorn Draw Unit- F11 Pipeline Change | - | Chevron USA | T1S R99W 11 | Initiated 09/22/2009 Completed 10/13/2009 | 220-EA | Northwest Ppln cathodic protection Piceance Ck | - | Northwest Pipeline | T1S R96W 29, 30; T1S R97W 12; T2S R96W 5; T1N R97W 4; T2N R97W 33, R98W 5, 9-11 | Initiated 07/13/2009 Completed 06/02/2010 | 221-EA | Northwest Ppln Ignacio Sumas/Moon Lake power connections | - | Northwest Pipeline/ Moon Lake Electric | T4S R101W 1; T3S R101 5, 7, 8, 21, 36; T2S R101W 9, 16, 18-20, 29, 33; T1N R101 19, 30; R104 4; T2N R103W 16 | Initiated 07/10/2009 Completed 06/25/2010 | 222-DNA | Grazing Permit Renewal - Villa Allotment 06619 | - | Auth #0504000 | T2N R95W 11 | Initiated 08/11/2009 Completed 05/12/2010 | 223-EA | Grazing Permit Renewal - Gower Gl., W. Strawberry, Goff Camp Gl. Allots | - | Auth #0501473 | T3N R95W 10 | Initiated 08/11/2009 Pending - | 224-DNA | Grazing Lease Renewal - Kourlis Allotment 06800 | - | Auth # 0501500 | T3N R93W 27 | Initiated 08/11/2009 Completed 01/04/2010 | 225-DNA | Grazing Lease Renewal - Oak Ridge Allotment 06822 & Wilber Allotment 6821 | - | Auth #0501494 (Wakara Ranch) | T1S R93W 1 | Initiated 08/11/2009 Completed 01/22/2010 |
 |
226-DNA | ExxonMobil Dust Suppressant- DuraSoil | - | Exxon Mobil Production Company | - | Initiated 08/07/2009 Completed 09/03/2009 | 227-CX | Assignment BEPCO to BOPCO | - | BOPCO LP | T1N R96W 29 | Initiated 07/16/2009 Completed 09/03/2009 | 228-CX | Assignment fiber optic line UBTA-UBET TO Tri-State | - | Tri-State Generation and Transmission | T2N R93W 9 | Initiated 07/20/2009 Completed 12/28/2009 | 229-EA | Story Gulch Well Pads (4) | - | EnCana Oil & Gas (USA), Inc. | T4S R95W 30 | Initiated 08/10/2009 Completed 02/03/2010 | 230-CX | Blue Mountain Energy Degas and Nitrogen Program 2009 | - | Blue Mountain Energy | T3N R101W 19 | Initiated 08/21/2009 Completed 10/02/2009 | 231-DNA | Duck Creek Fire ESR Plan/Supplement | - | USDI- BLM | T1S R98W 7 | Initiated 08/18/2009 Completed 11/18/2009 | 232-DNA | APDs (8) on one multi-well pad 13-24-198 | - | Williams Production RMT | T1S R98W 24 | Initiated 08/24/2009 Completed 12/01/2009 | 233-EA | | - | Snack Shack LLC | T2S R96W 8 | Initiated 08/12/2009 Completed 12/09/2009 | 234-CX | Replace Equipment Shelter at Mellen Hill | - | Verizon Wireless | T2N R103W 10 | Initiated 08/31/2009 Completed 11/09/2009 | 235-CX(390) | Double Willow APD's (7) for ConocoPhillips | - | ConocoPhillips | T4S R96W 33 | Initiated 09/15/2009 Completed 02/02/2010 | 236-DNA | | - | ConocoPhillips | T4S R96W 23 | Initiated 09/15/2009 Completed 10/22/2010 | 237-DNA | Wolf Creek Erosion Control Structures | - | Rio Blanco Water Conservancy District | T3N R100W 23 | Initiated 09/15/2009 Completed 11/09/2009 | 238-EA | Square S Summer Range Riparian Area Restoration Initiative | - | USDI-BLM | T4S R99W 29 | Initiated 09/15/2009 Completed 07/21/2010 | 239-DNA | ExxonMobil PCU 197-36A pipeline | - | ExxonMobil | T1S R97W 36 | Initiated 09/15/2009 Completed 07/14/2010 | 240-CX | 10" DRA East water injection line replacement | - | Chevron USA, Inc | T2N R102W 34 | Initiated 09/22/2009 Completed 11/12/2009 | 241-DNA | Whiting Federal 397-3-1 conversion to Injection Well | - | Whiting Oil and Gas Corporation | T3S R97W 3 | Initiated 09/24/2009 Withdrawn 01/12/2010 | 242-EA | Whiting Master SUPO to be applied to all (8) approved, undrilled APDs | - | Whiting Oil & Gas Corporation | T3S R97W 3 | Initiated 09/25/2009 Completed 06/28/2010 |
 |
 |
 |
|