Photograph of Colorado Mountain Range
BLM
U.S. DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
Photograph of Cliff Photograph of Wild Bird Photograph of Wild Flowers Photograph of Crane Photograph of Rafters
Colorado
BLM>Colorado>Information>NEPA>White River>FY 2008 Completed Actions
Print Page
FY 2008 Completed Actions

Completed Actions for FY 2008– (July 15, 2008)
Fy 2008 Log of CERs, CXs & DNAs -- FY 2008 Log

CER = Categorical Exclusion
CX = Categorical Exclusion for Fire
CX(390) = Section 390 Categorical Exclusion for Oil and Gas Development
DNA = Documentation of NEPA Adequacy and Land Use Plan Conformance
EA = Environmental Assessment
EIS = Environmental Impact Statement

For more information on these projects, contact the NEPA Coordinator Carol Hollowed at 970-878-3836 or email caroline_hollowed@blm.gov 
 
White River Field Office
220 East Market Street
Meeker,
Colorado 81641

All Field Office NEPA registers contain current EIS and EA actions. However, certain registers do not include CERs, CXs and DNAs . Inquiries about these documents can be obtained by contacting the appropriate Field Office NEPA Coordinator, or by visiting their Field Office public room.


*The listing of WSA (Wilderness Study Area), ACEC (Area of Critical Environmental Concern), WSR (Wild and
Scenic River ), WA (Wilderness Area), HMA (Herd Management Area), or CPNHD (Canyon Pintado National Historic District) in this column indicates that the proposed action is within that special designation area.

 

NEPA NUMBER
PROJECT NAME
PROJECT LEADER
WSA, ACEC, WSR, WA, HMA, CPNHD*
APPLICANT
STATUS
Range - Grazing Permit Renewal 
Tschuddi, Blacks Gulch, Oil Well Gulch, Scenery Gulch, Wray Gulch
T1N R96 W Sec 2-5, 9-10; T2N R 95W Sec 6-7, 18; T2N R96W All Sections; T 2N R97W Sec 1, 12; T3N R95W Sec 30-31; T3N R96W All Sections
Rio Blanco County (RBC)
Carling/Taylor
ACEC
Blacks Gulch Allotment (Sam & Virginia Love)
Initiated 10/20/06
Completed 10/01/07
Range - Brush Hole Spring Reconstruction
T1S R94W Sec 31 NWNW
Sheep Creek (RBC)
Hafkenschiel
 
Daren & Tammy Olsen
Initiated 2/5/07 
Completed 7/16/07
Range - Slash EV Grazing Permit Renewal
T 2S, R 97W Sec: 22, 23, 27, 28, 33-35; T 3S R 97W Sec:3-5,8-10,15-17,19-22,28-30,31-33; T 4S R 97W Sec:4-9,16-22, 27-32; T 5S R 97W Sec:6 18; T 3S R 98W Sec: 25, 36; T 4S R 98W Sec:1-3,10-16, 20-28, 35, 36; T 5S R 98W Sec 1-3,10-15; T 2 S R 96W Sec 17-21,28-32; T 2S R 97W Sec:10-16, 22-26
Hunter Creek, Willow Creek, Piceance Creek (RBC)
Hafkenschiel
ACEC
Slash EV/Johnson  
Initiated 2/5/07
Completed 1/24/08
Range - Barry Sepic Grazing Permit Renewal
T2N R94W Sec 15, 16, 20-22, 27-30, 32, 33
Sulphur Creek, Devils Hole Gulch, Strawberry Gulch (RBC)
Taylor
 
Barry Sepic
Initiated 2/26/07
Completed 3/05/08
Lands - Archy Bench - Two mile Pipeline in Evacuation Creek
T3S R 104W Sec 27, 34, 35
T4S R104W Sec 2, 11
Evacuation Creek Rio Blanco County (RBC)
Brown/Buys & Associates
 
Enduring Resources
Initiated 3/20/07
Completed 9/12/07
Lands - Uintah Broadcasting LLC proposes Baxter Pass FM Broadcast Tower w/access
T5S R103W Sec 27, 34
Bitter Creek (GC)
Jones
 
Uintah Broadcasting LLC
Initiated 3/28/07 
Completed 12/12/07
Range - Camp Gulch Spring Reconstruction / Restoration
T5S R98W Sec 2 SWNE
Clear Creek (GC)
Hafkenschiel
 
USDI-BLM
Initiated 4/20/07 
Completed 12/10/07
Range - A.W.R. Permit Renewal
T3S R94W Sec 11, 12, 14
T 3 S. R 94W S1/2 Sec. 11, S1/2 Sec. 12, NE 1/4 Sec. 14
Thirteenmile Creek, Fourteenmile Creek (GC)
Dupire
 
A.W.R. Sheep Co
Initiated 5/07/07
Completed 12/20/07
Lands - Pipeline connecting pipeline N Piceance
T1S R95W Sec 19, 20; T1S R96W Sec 12-14, 23
Segar Gulch, Hay Gulch (RBC)
Jones
 
XTO Energy
Initiated 4/26/07
Completed
10/10/07
Oil & Gas -Seven well locations
T1N R98W Secs 27, 33-35; T1S R98W Secs 1, 5
Duck Creek, Yellow Creek (RBC)
Johnson
 
BOPCo, L.P.
Initiated 6/12/07
Completed 10/12/07
Wildlife - BLM proposes Wolf Creek Rx Fire for Prairie dogs and Ferrets
T4N R99W Secs 24, 25, 30; T3N R98W Secs 5-7
Wolf Creek (MC)
Holmes
 
USDI/BLM
Initiated 6/20/07
Completed 6/13/08
Lands - Ryan Gulch to Barcus Creek Prospect Pipeline
T1S R99W Secs 2, 11, 13, 14, 24; T1N R99W Sec 35
Duck Creek, Yellow Creek, (RBC)
Brown
ACEC
Bargath Inc.
Initiated 6/26/07
Completed 11/15/07
Range - Hells Hole Allotment Transfer
T1S R104W Sec. 36; T1S R103W Sec. 31; T2S R104W Sec.1  3, 10, 11, 12, 13, 14, 15; T2S R103W Sec. 6  18
Hells Hole, Evacuation Creek (RBC)
Dupire
 
Cripple Cowboy Cow Outfit
Initiated 7/3/2007 
Completed 12/18/07
Lands - XTO Piceance Main Gathering Line
T2S R96W Sec 5, 8-11 13, 14, 24; T2S R95W Sec 19, 29, 30; T3S R95W Sec 5, 8, 17, 20, 21, 28, 33.
Lower & Middle Piceance Creek
Jones
 
XTO Energy
Initiated 7/6/2007
Completed 03/25/08
Lands - Expansion of Existing Power Line
T3S R97W Sec 2 W/2SE
Scandard Gulch, Willow Creek (RBC)
Brown
 
White River Electric Assoc.
Initiated  7/16/2007
Completed 11/09/07
Lands - Whiting Boies Ranch Pipeline
T2S R97W Sec 12-15, 19-22, 29, 30; T2S R96W Sec 7, 8
Black Sulfur Creek (RBC)
Brown/O&G
ACEC
Whiting Oil & Gas Corporation
Initiated 7/05/07
Completed 11/14/07
Oil & Gas -EnCana proposes to construct a pipeline connecting well pad N07 596 to I07 CDP
T5S, R96W, SE sec.7
Parachute Creek (GC)
Whitaker
 
EnCana Oil & Gas (USA) Inc
Initiated 08/07/07
Completed 12/19/07
Lands - Application to construct power line to Williams Rectifier Site
T2N R98W Sec 11, lot 19
Blair Mesa -White River (RBC)
Brown
 
White River Electric Association
Initiated 08/13/07
Completed 1/17/08
Lands - Whiting Oil & Gas Corporation -access road to the A-29D Well Pad
T2S R97W Sec 29
Black Sulphur Creek (RBC)
Brown
 
Whiting Oil & Gas Corporation
Initiated 09/06/07 
Completed 12/12/07
Lands - Rio Blanco County proposes a road reroute on RBC Road 68
T2S R98W Secs 18, 24
Ryan Gulch (RBC)
Jones
 
Rio Blanco County
Initiated 09/10/07 
Completed 12/13/07
Oil & Gas -ExxonMobil proposed 19 APDs (two well pads) FU297-20B1-B9,FU297-32A1-A10 & Pipeline
T2S R97W Secs 20, 32
Dry Gulch, Black Sulphur Creek (RBC)
Whitaker
 
ExxonMobil Oil Corp.
Initiated 09/19/07
Completed 1/30/08
Oil & Gas - ExxonMobil proposes pipeline from FU  197-33A1-A5, access and pipeline
T1S R97W Sec 33
Hatch Gulch, Dudley Gulch North, Piceance (RBC)
Whitaker
 
ExxonMobil Oil Corp.
Initiated 9/21/07
Completed 4/22/08
Oil & Gas - ExxonMobil proposes pipeline from FU 297-17A1-A9 well pad to tie-in point on existing pipeline
T2N R97W Sec 16, 18
Black Sulphur Creek, Piceance Creek (RBC)
Whitaker
 
ExxonMobil Oil Corp.
Initiated 5/17/07
Oil & Gas -ConocoPhillips' proposes 3 well pads and associated wells
T4S R96W Sec 22, 27, 34
Stewart Gulch (GC)
Smithers
 
ConocoPhillips Company
Initiated 10/9/07
Completed 03/18/08
Oil & Gas -EnCana Oil & Gas (USA) Inc proposes a gas, produced water, and fresh water pipeline and CDP Site
T4S R96W Sec 31-34; T5S R96W Sec 6
Porcupine Gulch, Cutoff Gulch, East Middle Fork Stewart Gulch, Dry Fork Stewart Gulch (GC)
Whitaker
 
EnCana Oil & Gas (USA) Inc.
Initiated 10/17/07
Completed 03/12/08
Lands - Repair Segments of ROW COC011243 (Ignacio/Sumas)
T2N R103W
Stinking Water Creek, Dripping Rock Creek (RBC)
Brown
 
Williams-Northwest Pipeline
Initiated 10/26/07
Completed 04/08/08
Lands - Greasewood Substation
T. 2 S., R. 97 W., Sec. 18, lot 15
Hatch Gulch, Gardenhire Gulch (RBC)
Brown
 
White River Electric Assoc
Initiated 11/29/07
Completed 5/5/08
Range - Hall Draw and Pad Fire Cheatgrass Control Project
T1N R101W Sec. 8 - 9; T2N R100W Sec. 3; T3N R100W Sec. 34
Gillam Draw, White River (RBC)
Dupire/Holsinger
 
BLM
Initiated 11/6/07
Completed 12/26/07
CO-110-2008-032-EA
Oil & Gas - Whiting proposes 4 APDs 397-3K-K1 & K3, 397-3K-L1 & L3
T3S, R97W, Sec 3
Bull Fork Gulch, Enoch Gulch, Hunter Creek (RBC)
J Johnson
 
Whiting Oil and Gas Corp.
Initiated 11/5/07
Forestry - East Jordan Prescribe Fire Project T2N R95W Sec. 10, 15, 16, 21, 22, 23, 27, 28
East Jordan Gulch, West Jordan Gulch (RBC)
Michels
 WSA
White River Field Office
Initiated 11/16/07
Completed 4/29/08
CO-110-2008-040-EA
Oil & Gas - Five APDs BR 22-18-1-103,BR 41-10-1-103,BR 13-20-1-103,SWR16-4-1-102,SWR 13-9-1-102
T1S R102W Sec 4, 9; T1S R103W Sec 10, 18, 20
Johnson Draw, Big Horse Draw(RBC)
Whitaker
 
Pioneer Natural Resources USA, Inc.
Initiated 11/13/07

Withdrawn
Lands - Air Sciences proposes air monitoring station
T3N R101W Sec 34
Red Wash (RBC)
Jones
 
Air Sciences
Initiated 12/04/07
Range - West Douglas Wild Horse Gather T1S R101W, T1S R102W, T1S R103W, T2S R101W, T2S R102W, T2S R103W, T3S R101W, T3S R102W, T3S R103W, T4S R102W, T4S R103W
Cottonwood Creek, Evacuation Creek, Douglas Creek, West Douglas Creek (RBC)

Kindall

 

 
BLM, WRFO
Initiated 12/10/07
Completed 07/14/08
Oil & Gas - Four well pads with four wells per pad (16 APDs) and access
T4S R96W Secs 18, 17; T4S R96W Secs 23, 30, 32, 34
West Fork Parachute Creek, Middle Fork Parachute Creek, Stewart Gulch (RBC & GC)
Smithers
 
ConocoPhillips Company
Initiated 12/18/07
Lands - Produced Water ppln, Fiber Optics line, Interconnect w/TransColorado
T2S R96W Sec 18, lot 10, 15, 16; T2S R97W Sec 11-13, 24, 25, 28
PL Gulch, Piceance Creek (RBC)
Brown
 
ExxonMobil Corporation
Initiated 12/14/07
Lands -Access Road to Private Gravel Pit
T1N R96W sec 6
White River (RBC)
Jones
 
Western Gravel LLC
Initiated 01/17/08
Lands -Additional power lines McBryde Substation
T1S R97W Sec 19
Yellow Creek, White River (RBC)
Brown