Approved Renewable Energy Projects
The U.S. Department of the Interior and the Bureau of Land Management (BLM) have begun a rapid and responsible move to large-scale renewable energy production on public lands. In 2010, Secretary Salazar approved the first large-scale solar energy plants ever to be built on public lands, six of which are in California. These six projects represent more than 3,000 megawatts of clean energy.
 |
Solar
Project | Megawatts | BLM Acres | Homes Powered | Peak Construction Jobs | Operations Jobs | Mitigation Acres# | Annual Rent | Public Land Projects | Blythe Solar Power Project* | 968 | 7,025 | 300,000-750,000 | 1,004 | 221 | 8,093+ | $8,564,767 | Calico Solar Project* | 663.5 | 4,604 | 199,050-497,625 | 731 | 136 | 6,215 | $4,937,273 | Chevron Lucerne Valley Solar | 45 | 422 | 13,500-33,750 | 45 | 3 | 516 | $289,387 | Desert Sunlight Solar Farm Project | 550 | 4,144 | 165,000-412,500 | 630 | 15 | 6,140+ | $4,198,110 | Genesis Solar Energy Project | 250 | 1,950 | 75,000-187,500 | 1,085 | 65 | 2,045+ | $2,254,566 | Ivanpah Solar Electric Generating System | 370 | 3,471 | 111,000-277,500 | 959 | 90 | 3,582 | $2,866,764 | Subtotal | 2,846.5 | 21,616 | 863,550-2,158,875 | 4,454 | 530 | 26,591+ | $23,110,867 | Private Land Projects with BLM Transmission | Abengoa Mojave Solar Project | 250 | 154 | 75,000-187,500 | 1,162 | 63 | <175 | $17,579 | | Centinela Solar Energy Project | 275 | 19 | 82,500-206,250 | 360 | 6 | 80+ | $3,096 | Imperial Solar Energy Center South | 200 | 19 | 60,000-150,000 | 250 | 5 | 17 | $2,895 | Imperial Solar Energy Center West | 250 | 65 | 75,000-187,500 | 285 | 4 | 82 | $10,625 | | Rice Solar Energy | 150 | 150 | 45,000-112,500 | 440 | 50 | 327+ | $100,320 | Total | 3,971.5 | 22,023 | 1,201,050-3,002,625 | 6,951 | 658 | 27,272+ | $23,245,382 |
#Mitigation acres only capture compensatory mitigation required by the BLM. Projects are also subject to measures to minimize or avoid impacts to sensitive resources, as well as compensatory mitigation measures required by state agencies. Numbers are subject to change.*Projects undergoing a right-of-way amendment process.
 |
Wind
Project | Megawatts | BLM Acres | Homes Powered | Peak Construction Jobs | Operations Jobs | Mitigation Acres# | Annual Rent | Public Land Projects | | Tule Wind Energy Project | 186 | 12,360 | 55,800-139,500 | 325 | 12 | 507+ | $785,295 | | Ocotillo Wind Energy Facility | 315 | 12,436 | 94,500-236,250 | 350 | 20 | 128+ | $1,308,825 | Total | 501 | 24,796 | 150,300-375,750 | 675 | 32 | 635+ | $2,094,120 |
#Mitigation acres only capture compensatory mitigation required by the BLM. Projects are also subject to measures to minimize or avoid impacts to sensitive resources, as well as compensatory mitigation measures required by state agencies. Numbers are subject to change.
Transmission Projects
Devers-Palo Verde No.2 Transmission Project Eldorado-Ivanpah Transmission Project
|