| Analysis Number | Project Name/Description | Analysis Type | Initiation Date | Contact Name | Case Number | Document Completion Date | Remarks |
| RE-2008-03 | Sacramento Ditch Southern End Trail | EA | 10/5/2007 | W. Kuntz | | 10/18/2007 | |
| RE-2008-07 | Northstate Monitoring Site Access Route | EA | 10/17/2007 | | | 10/26/2007 | ltd use in disturbed area |
| RE-2008-08 | Clear Creek Allotment TNR | EA | 10/26/2007 | C. Lentz | 03154 | 11/15/2007 | |
| RE-2008-09 | Williams Road Easement Donation | EA | 10/31/2007 | I. Emry | CA 48950 | 6/6/2008 | This Road Easement is being donated to replace the existing BLM road easement that goes through the Williams business. This easement is located to the west of the existing easement and is an existing road. |
| RE-2008-10 | Sacramento River Water Ditch (north) Trail Construction | EA | 11/7/2007 | W. Kuntz | | | |
| RE-2008-11 | acquisition MS 4599 | EA | 11/9/2008 | H. Matzat | CACA 47280 | 11/27/2007 | |
| RE-2008-16 | Lower Clear Creek Anadromous Fish Restoration and Management Project | EA | 11/16/2007 | G. Diridoni | | | The purpose of the proposed action is to: • Restore sediment transport processes, including coarse bedload transport continuity and fine sediment deposition on floodplain surfaces; • Improve habitat conditions for anadromous salmonid species, including Central Valley fall-run and late fall-run Chinook salmon, Central Valley spring-run Chinook salmon and Central Valley steelhead/Sacramento River rainbow trout; and • Spatially separate adult Central Valley spring-run Chinook salmon from Central Valley fallrun Chinook salmon to prevent hybridization and redd superimposition (disturbance of salmon nests by other nesting salmon). |
| RE-2008-18 | Coleman Hatchery Water Supply Pipelines | EA | 11/20/2007 | K. Williams | | | This EA is being written by the Bureau of Reclamation (as lead agency for the project). The FONSI will be signed by multiple agencies including BLM. |
| RE-2008-22 | Belt ROW | EA | 11/29/2007 | S. Rodriguez | CA 49374 | | |
| RE-2008-24 | CA 49474 AT&T cabinets | EA | 11/30/2007 | H. Matzat | CACA 49474 | 1/11/2008 | |
| RE-2008-29 | Black Bear OHV trail construction | EA | 12/17/2007 | S. Zaffarano | | | Approximately 0.9 miles of new OHV trail construction to increase connectivity and imporve OHV recreation experience by developing new OHV route loop opportunities near OHV area access points. |
| RE-2008-30 | Juniper Removal - Spring Branch Road | EA | 12/18/2007 | K. Williams | | 7/7/2008 | Junipers would be removed under blue oaks and within 10 feet of blue oaks to minimize fire kill during wildfire conditions. |
| RE-2008-31 | Sunrise Excavation Connecting Route | EA | 1/10/2008 | F. Berg | | 2/7/2008 | Approx 400 administrative route on edge of lower Clear Creek floodplain. |
| RE-2008-34 | Galwey ROW | EA | 1/29/2008 | H. Matzat | CACA-49548 | 2/1/2008 | |
| RE-2008-36 | Water diversion CA 45536 | EA | 2/5/2008 | H. Matzat | CACA 45536 | 2/15/2008 | |
| RE-2008-40 | Dry Gulch Preliminary AML Rehab | | 2/20/2008 | F. Berg | | 3/26/2008 | Place 5,000 to 15,000 cy of native alluvium on 500 to 800' of existing vehicle route. |
| RE-2008-44 | Clear Creek Recreation Development | EA | 2/26/2008 | A. Lytle | | | |
| RE-2008-51 | Sunsweet Races | EA | 3/26/2008 | A. Lytle | CA360SRP08-012 | 3/27/2008 | |
| re-2008-63 | Keswick / GVC Exchange | EA | 5/12/2008 | H. Matzat | CACA-45238 | | |
| RE-2008-65 | Jellys/Battle Creek Lease Renewal | EA | 5/13/2008 | C. Lentz | 3089 | | Lease renewal for the Jellys/Battle Creek Allotment |
| RE-2008-66 | North Fork Grazing Lease Renewal | EA | 5/13/2008 | C. Lentz | 3107 | | Renewal of the North Fork Grazing Lease. Previously known as the Taylor lease. |
| RE-2008-67 | Owen Acquisition | EA | 5/16/2008 | S. Rodriguez | CA 49566 | | |
| RE-2008-68 | Gold Bar Acquisition | EA | 5/20/2008 | I. Emry | CA 49827 | | 11 acre acquisition on the Trinity River near Bucktail. |
| RE-2008-70 | BR Withdrawal Revocation (Phase 1) | EA | 5/21/2008 | C. Wright | | | Revocation of 1346 acres of withdrawn lands, Keswick to Shasta Dam. |
| RE-2008-72 | Boundary Fence Construction in Bend | EA | 5/23/2008 | K. Williams | | | Primary areas of consideration are east of Jellys Ferry Road, west of Spring Branch, around the new acquisition in the Private Triangle and NW of the Surrey Village subdivision (Bald Hill Parcel) |
| RE-2008-74 | Williams CC Road Easement Release | DNA | 6/3/2008 | I. Emry | CACA-035763-P2 | 6/6/2008 | Release of Easement replaced by CACA 48950. Easement no longer serves any Federal purpose. |
| RE-2008-83 | Kolbo Acquisition | EA | 7/1/2008 | S. Rodriguez | CA 49736 | | |
| RE-2008-86 | Fence Removal and Construction on the Owen Acquisition | EA | 7/10/2008 | K. Williams | | 8/1/2008 | Removal of a short stretch of fence to incorporate acquisition into public land. Addition of a short stretch of fence for a new boundary line. |
| RE-2008-87 | Clean-up of the Kolbo Acquisition | EA | 7/17/2008 | K. Williams | | | Analysis of structure, fence and vegetation removals from a new addition to the public land in Bend. |
| RE-2008-91 | Rocky Pond Beaver Removal | EA | 7/23/2008 | G. Diridoni | | | Beaver damage to infrastructure has exceeded the ability of staff to maintain the site to ensure water transport managed wetlands. A depredation permit issued by CDFG has been issued and BLM proposes the lethal removal of beaver within the wetland cell known as Rocky Pond. |
| RE-2008-95 | Trinity River Guide Permit Program | EA | 7/7/2008 | A. Lytle | CA360-SRP-08 | 8/3/2008 | For Trinity River fishing guide permit program |
| RE-2008-96 | HPS Consolidated Grazing Renewal EA | EA | 7/12/2008 | C. Lentz | 0156, 0153, 3148 | | |