California

2008 NEPA Documents - Redding Field Office

Analysis NumberProject Name/DescriptionAnalysis TypeInitiation DateContact NameCase NumberDocument Completion DateRemarks
RE-2008-03Sacramento Ditch Southern End TrailEA10/5/2007W. Kuntz 10/18/2007 
RE-2008-07Northstate Monitoring Site Access RouteEA10/17/2007  10/26/2007ltd use in disturbed area
RE-2008-08Clear Creek Allotment TNREA10/26/2007C. Lentz0315411/15/2007 
RE-2008-09Williams Road Easement DonationEA10/31/2007I. EmryCA 489506/6/2008This Road Easement is being donated to replace the existing BLM road easement that goes through the Williams business.  This easement is located to the west of the existing easement and is an existing road. 
RE-2008-10Sacramento River Water Ditch (north) Trail ConstructionEA11/7/2007W. Kuntz   
RE-2008-11acquisition MS 4599EA11/9/2008H. MatzatCACA 4728011/27/2007 
RE-2008-16Lower Clear Creek Anadromous Fish Restoration and Management ProjectEA11/16/2007G. Diridoni  The purpose of the proposed action is to:
• Restore sediment transport processes, including coarse bedload transport continuity and fine sediment deposition on floodplain surfaces;
• Improve habitat conditions for anadromous salmonid species, including Central Valley fall-run and late fall-run Chinook salmon, Central Valley spring-run Chinook salmon and
Central Valley steelhead/Sacramento River rainbow trout; and
• Spatially separate adult Central Valley spring-run Chinook salmon from Central Valley fallrun Chinook salmon to prevent hybridization and redd superimposition (disturbance of salmon nests by other nesting salmon).
RE-2008-18Coleman Hatchery Water Supply PipelinesEA11/20/2007K. Williams  This EA is being written by the Bureau of Reclamation (as lead agency for the project).  The FONSI will be signed by multiple agencies including BLM.
RE-2008-22Belt ROWEA11/29/2007S. RodriguezCA 49374  
RE-2008-24CA 49474 AT&T cabinetsEA11/30/2007H. MatzatCACA 494741/11/2008 
RE-2008-29Black Bear OHV trail constructionEA12/17/2007S. Zaffarano  Approximately 0.9 miles of new OHV trail construction to increase connectivity and imporve OHV recreation experience by developing new OHV route loop opportunities near OHV area access points.
RE-2008-30Juniper Removal - Spring Branch RoadEA12/18/2007K. Williams 7/7/2008Junipers would be removed under blue oaks and within 10 feet of blue oaks to minimize fire kill during wildfire conditions.
RE-2008-31Sunrise Excavation Connecting RouteEA1/10/2008F. Berg 2/7/2008Approx 400 administrative route on edge of lower Clear Creek floodplain.
RE-2008-34Galwey ROWEA1/29/2008H. MatzatCACA-495482/1/2008 
RE-2008-36Water diversion CA 45536EA2/5/2008H. MatzatCACA 455362/15/2008 
RE-2008-40Dry Gulch Preliminary AML Rehab 2/20/2008F. Berg 3/26/2008Place 5,000 to 15,000 cy of native alluvium on 500 to 800' of existing vehicle route.
RE-2008-44Clear Creek Recreation DevelopmentEA2/26/2008A. Lytle   
RE-2008-51Sunsweet RacesEA3/26/2008A. LytleCA360SRP08-0123/27/2008 
re-2008-63Keswick / GVC ExchangeEA5/12/2008H. MatzatCACA-45238  
RE-2008-65Jellys/Battle Creek Lease RenewalEA5/13/2008C. Lentz3089 Lease renewal for the Jellys/Battle Creek Allotment
RE-2008-66North Fork Grazing Lease RenewalEA5/13/2008C. Lentz3107 Renewal of the North Fork Grazing Lease.  Previously known as the Taylor lease.
RE-2008-67Owen AcquisitionEA5/16/2008S. RodriguezCA 49566  
RE-2008-68Gold Bar AcquisitionEA5/20/2008I. EmryCA 49827 11 acre acquisition on the Trinity River near Bucktail.  
RE-2008-70BR Withdrawal Revocation (Phase 1)EA5/21/2008C. Wright  Revocation of 1346 acres of withdrawn lands, Keswick to Shasta Dam.
RE-2008-72Boundary Fence Construction in BendEA5/23/2008K. Williams  Primary areas of consideration are east of Jellys Ferry Road, west of Spring Branch, around the new acquisition in the Private Triangle and NW of the Surrey Village subdivision (Bald Hill Parcel)
RE-2008-74Williams CC Road Easement ReleaseDNA6/3/2008I. EmryCACA-035763-P26/6/2008Release of Easement replaced by CACA 48950.  Easement no longer serves any Federal purpose.  
RE-2008-83Kolbo AcquisitionEA7/1/2008S. RodriguezCA 49736  
RE-2008-86Fence Removal and Construction on the Owen AcquisitionEA7/10/2008K. Williams 8/1/2008Removal of a short stretch of fence to incorporate acquisition into public land.  Addition of a short stretch of fence for a new boundary line.
RE-2008-87Clean-up of the Kolbo AcquisitionEA7/17/2008K. Williams  Analysis of structure, fence and vegetation removals from a new addition to the public land in Bend.
RE-2008-91Rocky Pond Beaver RemovalEA7/23/2008G. Diridoni  Beaver damage to infrastructure has exceeded the ability of staff to maintain the site to ensure water transport managed wetlands. A depredation permit issued by CDFG has been issued and BLM proposes the lethal removal of beaver within the wetland cell known as Rocky Pond.
RE-2008-95Trinity River Guide Permit ProgramEA7/7/2008A. LytleCA360-SRP-088/3/2008For Trinity River fishing guide permit program 
RE-2008-96HPS Consolidated Grazing Renewal EAEA7/12/2008C. Lentz0156, 0153, 3148  
 

Return to Main NEPA Page